Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000423/LER-1986-038, :on 860605,penetration Through Main Steam Valve Bldg Supplementary Leak Collection & Release Sys Pressure Boundary Found Open to Atmosphere.Caused by Removal of Seal for Cable in Nov 1985.Penetration Sealed + (07:51:22, 24 May 2025)
- ML20199K468 + (07:51:59, 24 May 2025)
- ML20199K341 + (07:52:37, 24 May 2025)
- IR 05000482/1997019 + (07:52:48, 24 May 2025)
- 05000306/LER-1998-006-01, :on 981219,unplanned Actuation of ESF Equipment During Performance of Sp.Caused by Personnel Error.Control Room Took Prompt Action & Returned Plant to Proper Status & Second pre-job Briefing for SP-2126 Was Conducted + (07:53:00, 24 May 2025)
- 05000304/LER-1997-006-07, :on 971028,informed of Potential to Exceed 10CFR50.46 ECCS Acceptance Criteria.Caused by Fuel Clad Gap re-opening & 17% Maximum Cladding Oxidation Limit.Performed Conservative Corrosion Calculations + (07:53:06, 24 May 2025)
- IR 05000461/1997011 + (07:53:32, 24 May 2025)
- ML20199K175 + (07:53:39, 24 May 2025)
- IR 05000295/1997012 + (07:53:46, 24 May 2025)
- ML20199K133 + (07:53:54, 24 May 2025)
- IR 05000373/1997003 + (07:53:56, 24 May 2025)
- ML20199K115 + (07:54:00, 24 May 2025)
- ML20199K057 + (07:54:13, 24 May 2025)
- 05000316/LER-1986-019, :on 860605,during Mode 5,fire Insp Missed on Inoperable Fire Door 470.Caused by Personnel Error.Action Initiated to Restore Identification Numbers to Appropriate Plant Door & Personnel Counseled + (07:54:23, 24 May 2025)
- 05000266/LER-1997-040-01, Forwards LER 97-040-01 Which Documents Event That Occurred at Point Beach Nuclear Plant,Unit 1.Commitments Made within Ltr,Encl + (07:54:35, 24 May 2025)
- ML20199J997 + (07:54:39, 24 May 2025)
- ML20199J962 + (07:54:47, 24 May 2025)
- NUREG-0979, Forwards Sser 5,(NUREG-0979).W/o Encl + (07:56:07, 24 May 2025)
- 05000482/LER-1986-073, :on 860102,leak Rate Testing of Containment H Purge Sys Was Not Performed IAW All Requirements of TS 3.6.1.7.Cause Identified as Mindset.Revised Procedure & SAR Changes + (07:56:28, 24 May 2025)
- 05000483/LER-1986-019, :on 860606,during Mode 1,reactor Trip Occurred on Low Pressurizer Pressure.Caused by Technician Deviation from Calibr Procedure.Progressive Discipline Administered. Guidelines Given to Technicians + (07:56:38, 24 May 2025)
- 05000334/LER-1998-029, :on 981218,inadequate Meterological Instrumentation Calibr Led to Failure to Comply with Tss.Caused by Human Error.Current Wind Direction Sensor Was Replaced.With + (07:56:40, 24 May 2025)
- ML20199J687 + (07:56:42, 24 May 2025)
- 05000416/LER-1986-020, :on 860603,discovered That Nonqualified Relay Could Cause Loss of Standby Gas Treatment Sys Safety Function During Accidents.Caused by Approved Design.Circuit Design Will Be Modified to Bypass Fan Contact + (07:56:48, 24 May 2025)
- ML20199J559 + (07:57:17, 24 May 2025)
- IR 05000298/1986012 + (07:57:23, 24 May 2025)
- 05000282/LER-1997-013, :on 971018,inoperability of AFW & Entry Into TS 3.0.C Was Noted Due to AFW Manual Start During Planned & Orderly Shutdown.Lar Will Be Prepared + (07:57:42, 24 May 2025)
- ML20199J446 + (07:57:50, 24 May 2025)
- ML20199J432 + (07:57:54, 24 May 2025)
- ML20199J402 + (07:58:01, 24 May 2025)
- ML20199J286 + (07:58:33, 24 May 2025)
- ML20199J285 + (07:58:34, 24 May 2025)
- L-97-215, SG Secondary Side Loose Object Safety Evaluation + (07:58:36, 24 May 2025)
- 05000254/LER-1998-002, :on 961007,required Drywell HP Instrument Channel Relay Monthly Surviellance Interval Was Exceeded Due to Inadequate Test Procedure.Caused by Cognitive Personnel Error.Personnel Error Reviewed W/Responsible Individuals + (07:59:00, 24 May 2025)
- IR 05000298/1986013 + (07:59:19, 24 May 2025)
- IR 05000285/1997019 + (07:59:26, 24 May 2025)
- IR 05000298/1986006 + (07:59:37, 24 May 2025)
- IR 05000498/1986002 + (07:59:39, 24 May 2025)
- ML20199H847 + (08:00:37, 24 May 2025)
- ML20199H835 + (08:00:40, 24 May 2025)
- ML20199H786 + (08:00:54, 24 May 2025)
- ML20199H783 + (08:00:55, 24 May 2025)
- ML20199H781 + (08:00:57, 24 May 2025)
- 05000295/LER-1996-007, :on 960308,below Freezing Conditions Created Flow Restrictions in SI Pump Recirculation Line.Caused by Design Deficiency.Si Pump Recirculation Line Was Cleared by Securing Purge Sys & Increasing Temperature + (08:01:08, 24 May 2025)
- ML20199H698 + (08:01:16, 24 May 2025)
- ML20199H622 + (08:01:42, 24 May 2025)
- ML20199H616 + (08:01:45, 24 May 2025)
- ML20199H610 + (08:01:48, 24 May 2025)
- ML20199H604 + (08:01:50, 24 May 2025)
- ML20199H598 + (08:01:51, 24 May 2025)
- ML20199H565 + (08:02:06, 24 May 2025)
- ML20199H560 + (08:02:08, 24 May 2025)