Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/97-14 on 970827.NRC Withdrew Example 3 of Violation Since 10CFR50.71 Is Not Basis for Updating TS Bases Sections
ML20199H783
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/23/1998
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dugger C
ENTERGY OPERATIONS, INC.
References
50-382-97-14, EA-97-593, NUDOCS 9802050120
Download: ML20199H783 (4)


See also: IR 05000382/1997014

Text

__

+:

,

p >Wout,

_ UNITED STATES

g

j'h

y

' NUCLEAR REGULATOHY COMMISSION

-

[

[L

,1

REGION IV

i

/'

_ 611 RYAN PLAZA DRIVE. SUITE 400

l-

<

.O

ARLINGTON, TEXAS 760118064

.

January 23. 1998

EA 97-593

Entergy Operations, Inc. _

ATTN: Charles M. Dugger, Vice President

Operations -Waterford 3

-

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066 -

SUBJECT: NRC INSPECTION REPORT 50-382/97-14 AND NOTICE OF VIOLATION -

Dear Mr. Dugger:

Thank you for Mr. E. C. Ewing's letter dated October 20,1997, in response to our letter and

Notice of Violation (Notice) 50-382/9714-01, dated August 27,1997. We note that you did not

agree with Example 3 of the violation. Your staff concluded that the failure to update Technical

. Specification Bases Section 3/4.7.1.2 was not a violation of 10 CFR 50.71(e).'

On August 4,1995, your staff determined that since the original submittal, Technical -

- Specification Bases Section 3/4.7.1.2, incorrectly stated that each electric-driven emergency

' feedwater pump was capable of delivering a total feedwater flow of 350 gpm at a pressure of

1163 psig to the entrance of the steam generators. The bases section should have read that

each electric-driven emergency feedwater pump was capable of delivering a total flow of ;

350 gpm at a pressure of 1163 psig at the discharge of the pump.' The NRC initially noted that-

your technical specifications, including the technical specification bases sections, were labeled '

as being part of the Final Safety Analysis Report and noted that the technical specification bases

sections were included in Chapter 16 of the Final Safety Analysis Report. As a result, the NRC-

concluded that failure to make the Technical Specification Bases Section 3/4.7.1.2 accurate

-

. was an example of a violation of 10 CFR 50.71(e).

After consideration of the information your staff has provided, we withdraw Example 3 of

Violation 50-382/9714-01. We note that ther required post-operating license submj'tal of the

- Updated Final Safety Analysis Report did not include the technical specification bases

sections in the Updated Final Safety Analysis Repo:t We concluded that when the NRC-

permitted removal of the technical specification bases sections from the Updated Final Safety

Analysis Report, this removed the technical specification bases sections from the scope of

10 CFR 50.71(e)' As a result, we agree that 10 CFR 50.71(e) is not the basis for updating the

>

technical specification bases sections.

~

9802050120 980123

PDR

ADOCK 05000382

G

PDR

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _

-

,.

1

Entergy Operations, Inc.

-2-

We also noted that you have concluded that, until the improved technical specifications are in

place, changes to technical specification bases sections, which are not made as a part of the

license amendment process, would be controlled in accordance with 10 CFR 50.59. We agree

with this position. In addition, we note that you changed Technical Specification Bases Section

3/4.7.1.2. We have reviewed the 3ssociated safety evaluation (SE 97-165) during NRC

Inspection 50-382/97-25 and have identified further concerns. We will send you the results of

that inspection under separate correspondence.

Sincerely,

W

James E. Dyer, Deputy

Regional Administrator

<

Docket No.: 50-382

License No.: NPF-38

cc:

Executive Vice President and

Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Vice President, Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, Mississippi 39205

General Manager, Plant Operations

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

Manager - Licensing Manager

Waterford 3 SES

,

'

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

I

1

l

_ _ _ _ _ _ _

. _ _ _ _ _

~-

- _

_ . . _ .

. _ . . _ _ _ . _ _ . . . _ _ . -- ._ ... . _ . _. ..._..- -. -.._..._ _.. _ . _

_ . _ _ _ . _ .

.

,

4

1

' --

Entergy Operations,'inc.

3-

-

,

4

i .

Chairman

' -

-

Louisiana Public Service Commission

- One American Place, Suite 1630

. Baton Rouge, Louisiana 70825-1897

>

,

-

Director, Nuclear Safety'&

-

,

Regulatory Affairs

r

Waterford 3 SES .

~ Entergy Operations,~ inc.

4

.

-

P.O. Box B

'

'

, _

Killona, Louisiana 70066

William H. Spell, Administrator

Louisiana Radiation Protection Division

L

. P.O. Box 82135

Baton Rouge, Louisiana 70884-2135

- Parish President -

- St. Charles Parish

,

P.O. Box 302

'

Hahnville, Louisiana 70057

, -

Mr. William A. Cross

j

Bethesda Licensing Office

3 Metro Center

Suite 610

,

Bethesda, Maryland 20814

l

Winston & Strawn

g

..1400 L Street, N.W.

Wash!ngton, D.C. 20005-3502

.

' ~

.

.-

.

I

t

4

i.

u

y,-.

,r,+*-

+

re-

v-

r

-e*-

>

--v

.--r

r

e

e

-

n

- _ _ _ _ _ _ _ - - - _ - - _ _ _ _ _ _ _ - _ _ _

a:

..

)

Entergy Operations, Inc.

4-

E-Mail report to T. Frye (TJF)

}

E Mail report to T. Niltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director

DRS-PSB

Branch Chief (DRP/D)

MIS System

Project Engineer (DRP/D)

RIV File

Branch Chief (DRP/TSS)

Action-Item File (97-G-108)

C. Gordon' RIV AI 97-333

C. Goines RIV AI 97-333 -

DOCUMENT NAME: G:\\EB\\WT714AK.LJS

To receive copy of document. Indicate in box:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RI:EB

E

ABC:EB

E

D:DRSdpo

N

DRA

,

_

LJSmith/ b%

TFStetka 40

ATHowTff

JEDyer tM

01/2398

01M/98

01h/98

01tJ1298

'

OFFICIAL RECORD COPY

__-

.- .:*

11'

Entergy Operations, Int,-

-4. -

E-Mail report to T. Frye (TJF)-:

^

E-Mail report to T. Hiltz (TGH): _

.

' E-Mail report to NRR Event Tracking System (IPAS) ' .

E-Mail report to Document Control Desk (DOCDESK)

'

g;testo 000(501)ha

~ bec distrib by RIV:c

Regional Administrat

'

i Resident inspector -

DRP Director

DRS-PSB

Branch Chief (DRP/D)

' MIS System

Project Engineer (DRP/D)

' RIV File

h

Branch Chief (ORP/TSS)

Action Item File (97-G-108)

C.Gordon(RIVAI97-333)

C.iGoines:(RIV AI 97-333)

,

L

050025

DOCUMENT NAME: G:\\EB\\WT7.14AK.LJS

. To receive copy of document, indicate in box:"C" = Copy without enclosures "E" = Copy with enclosures "Naa No copy

RI:EB

F.

ABC:EB

E

D:DRS@ a

N

DRA

,

LJSmith/ C55

TFStetka 40

ATHowTIff

JEDyer %;'

01/rJ98

01M/98

01b/98 '

01tJBS8

OFFICIAL RECORD COPY'