Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205J508 + (02:32:38, 24 May 2025)
- ML20205J431 + (02:32:54, 24 May 2025)
- ML20205J394 + (02:33:01, 24 May 2025)
- IR 05000312/1985028 + (02:33:17, 24 May 2025)
- IR 05000272/1999001 + (02:33:22, 24 May 2025)
- ML20205J295 + (02:33:27, 24 May 2025)
- NLS8700143, Submits Required Info Detailing Property Insurance Coverage Carried by Util for Facility.Util Presently Involved in Renewal Process & Coverage Will Be Renewed to 880501 + (02:35:13, 24 May 2025)
- TAC:07727 + (02:35:27, 24 May 2025)
- IR 05000369/1999301 + (02:35:39, 24 May 2025)
- ML20205H833 + (02:36:03, 24 May 2025)
- TAC:00296 + (02:36:49, 24 May 2025)
- L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite + (02:37:36, 24 May 2025)
- DD-85-10, Advises That Time for Commission to Review Directors Decision DD-85-10 Expired.Commission Declined Review. Decision Became Final Agency Action on 851108.Served on 851113 + (02:38:10, 24 May 2025)
- IR 05000387/1986010 + (02:38:39, 24 May 2025)
- ML20205H320 + (02:38:45, 24 May 2025)
- 05000029/LER-1986-007-01, Forwards LER 86-007-01,per 10CFR50.73(a)(2)(v) + (02:38:46, 24 May 2025)
- ML20205H291 + (02:38:55, 24 May 2025)
- ML20205H288 + (02:38:57, 24 May 2025)
- 05000413/LER-1999-002, :on 990225,three RHR Sys Valves Did Not Meet ESF Response Time Requirements.Caused by Procedure Deficiency.Evaluated to Determine If 12 Second Response Time Can Be Changed or If Mod to Valve Will Be Necessary + (02:39:12, 24 May 2025)
- ML20205H221 + (02:39:13, 24 May 2025)
- TAC:64573 + (02:42:08, 24 May 2025)
- IR 05000416/1988009 + (02:42:08, 24 May 2025)
- ML20205H104 + (02:42:15, 24 May 2025)
- IR 05000324/1985027 + (02:42:18, 24 May 2025)
- ML20205H082 + (02:42:22, 24 May 2025)
- IR 05000219/1986038 + (02:42:37, 24 May 2025)
- IR 05000425/1988047 + (02:42:39, 24 May 2025)
- IR 05000369/1988023 + (02:42:42, 24 May 2025)
- IR 05000321/1988021 + (02:42:44, 24 May 2025)
- IR 05000282/1998016 + (02:43:22, 24 May 2025)
- ML20205G863 + (02:43:38, 24 May 2025)
- ML20205G859 + (02:43:43, 24 May 2025)
- L-99-013, Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl + (02:43:46, 24 May 2025)
- IR 05000410/1986038 + (02:43:55, 24 May 2025)
- 05000289/LER-1988-005-02, :on 880925,RCS Heatup Rate Increased to 60 F Per Hour When Third Reactor Coolant Pump Started.Caused by Procedural Error.Operators Trained & Procedures Revised Re Primary Monitoring Method Used + (02:44:08, 24 May 2025)
- ML20205G773 + (02:44:09, 24 May 2025)
- ML20205G734 + (02:44:20, 24 May 2025)
- ML20205G723 + (02:44:24, 24 May 2025)
- ML20205G713 + (02:44:26, 24 May 2025)
- ML20205G698 + (02:44:30, 24 May 2025)
- 05000354/LER-1986-040, :on 860714 Technicians Discovered RCIC Sys Condensate Storage Tank Low Level Switches Disconnected Since 860627.Caused by Personnel Error.Personnel Counseled & Procedures Will Be Revised + (02:44:34, 24 May 2025)
- 05000265/LER-1986-013, :on 861011,leakage of MSIV AO 2-203-2D in Excess of 11.5 Std Cubic Ft Per Hour Discovered.Caused by Normal Operational Wear.Valve Body Reseated.Pilot Seats Lapped.Stem & Piston Ring Replaced + (02:44:35, 24 May 2025)
- IR 05000369/1985045 + (02:44:50, 24 May 2025)
- 05000344/LER-1988-032, :on 880924,control Room Ventilation Sys Inoperable Due to Inability to Maintain Sufficient Positive Pressure in Control Room.Signs Will Be Posted on Doors Between Auxiliary Bldg & Control Bldg + (02:45:01, 24 May 2025)
- ML20205G577 + (02:45:11, 24 May 2025)
- IR 05000320/1985020 + (02:45:12, 24 May 2025)
- TAC:62949 + (02:45:19, 24 May 2025)
- 05000318/LER-1987-002-01, :on 870228,low Steam Generator Water Level Reactor Trip Occurred Due to Failed Rochester Instrument Sys,Inc Adjustable Overshoot Transmitter Lead/Lag Circuit. Cause Under Investigation.Unit Replaced + (02:45:25, 24 May 2025)
- ML20205G531 + (02:45:29, 24 May 2025)
- IR 05000413/1985043 + (02:47:10, 24 May 2025)
- ML20205G338 + (02:47:27, 24 May 2025)