TAC:07727
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
From | |
MONTHYEARML20205H9841976-07-0606 July 1976
[table view]Forwards Draft Amends 18 & 23 to Licenses DPR-24 & DPR-27, Respectively, & Safety Evaluation.Amends Revise Tech Specs to Add Surveillance Requirements & Place Limit on Max Weight of Spent Fuel Shipping Cask Used ML20041C7351982-02-25025 February 1982 Forwards Tentative Schedule for Submittal of 6-month & 9-month Repts on Outstanding Response Items Concerning NUREG-0612 Re Control of Heavy Loads,Per NRC 820201 Request ML20054G6221982-06-16016 June 1982 Forwards Response to NRC Question Attachment 1-5 Re Interfacing Lift Point Evaluation.Info Provided as Revised Pages to 9-month Response to NUREG-0612, Control of Heavy Loads ML20054L0981982-06-30030 June 1982 Submits Addl Info for Draft Technical Evaluation Rept on Util Response to NUREG-0612, Control of Heavy Loads, Per 820520 Telcon ML20069D5931982-09-16016 September 1982 Forwards Response to NRC Question Attachment 1-1 Re Manufacturer Design Info on Single Failure Proof Cranes & Revised Response to NRC Attachment 1-5 Concerning Interfacing Lift Point Evaluation ML20065S1291982-10-22022 October 1982 Requests Expeditious Review & Approval of Revision 3 to Ederer,Inc Generic Rept EDR-1, Nuclear Safety-Related Extra-Safety & Monitoring (X-SAM) Cranes to Assist in Completing Auxiliary Bldg Crane Upgrade in Timely Manner ML20066K0641982-11-22022 November 1982 Forwards Revised Pages 10,11 & 11a to Response to NRC Question 2.3-4-b Re Control of Heavy Loads,Including Results of Reactor Pressure Vessel Head Drop Analysis.Info Should Be Included in 9-month Response ML20072K8201983-06-17017 June 1983 Control of Heavy Loads (C-10),Point Beach Nuclear Plants Units 1 & 2, Draft Final Technical Evaluation Rept ML20080M9231983-09-28028 September 1983 Forwards Addl Info Requested in 830810 Telcon Re Franklin Research Ctr 830617 Draft Technical Evaluation Rept on Util Response to Phase 1 of NUREG-0612, Control of Heavy Loads at Nuclear Power Plants ML20086T8821984-03-0202 March 1984 Control of Heavy Loads (C-10) Wisconsin Electric Power Co Point Beach Nuclear Plant Units 1 & 2 1982-06-16 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:07727&oldid=3327513"