Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- AECM-81-104, Final Deficiency Rept Re Reactor Pressure Vessel Feedwater Nozzle Deficiency,Originally Reported 800417.Evaluation Determined Deficiency Not Reportable Per 10CFR50.55e + (01:23:24, 24 December 2024)
- 05000312/LER-1981-009, Forwards LER 81-009/03L-0 + (01:23:28, 24 December 2024)
- 05000325/LER-1981-028-03, /03L-0:on 810211,during Reactor Instrumentation Isolation Valves Functional Cycling Test,Pt 2.2.1a,RIP Valve X68C Would Not Open.Caused by Defective Control Switch. Switch Module Replaced & Valve Tested + (01:23:31, 24 December 2024)
- 05000333/LER-1981-020-03, /03L-0:on 810213,during Normal Operation,Hpci Controller Indicated Possible Controller Failure.Sys Declared Inoperable.Caused by Failure of Two Transistors in Amplifier.Controller Replaced & Returned to Svc + (01:23:34, 24 December 2024)
- ML19350A954 + (01:23:35, 24 December 2024)
- 05000333/LER-1981-020, Forwards LER 81-020/03L-0 + (01:23:37, 24 December 2024)
- 05000325/LER-1981-028, Forwards LER 81-028/03L-0 + (01:23:39, 24 December 2024)
- ML19350A949 + (01:23:40, 24 December 2024)
- ML19350A945 + (01:23:44, 24 December 2024)
- 05000325/LER-1981-022-03, /03L-0:on 810209,during Test,Switch 2 of Main Steam Line Differential Switches 1-B21-dPIS-N006D & N007D, Actuated at Greater than Specified Allowable Flow.Caused by Instrument Drift.Instruments Recalibr + (01:23:45, 24 December 2024)
- ML19350A943 + (01:23:47, 24 December 2024)
- ML19350A942 + (01:23:48, 24 December 2024)
- ML19350A941 + (01:23:49, 24 December 2024)
- ML19350A940 + (01:23:50, 24 December 2024)
- 05000325/LER-1981-022, Forwards LER 81-022/03L-0 + (01:23:51, 24 December 2024)
- W3P81-0406, Forwards Amend 1 to OL Application.Amend Includes Supporting Financial Documentation + (01:23:52, 24 December 2024)
- ML19350A935 + (01:23:54, 24 December 2024)
- TAC:42594 + (01:23:55, 24 December 2024)
- ML19350A934 + (01:23:57, 24 December 2024)
- ML19350A933 + (01:23:58, 24 December 2024)
- ML19350A931 + (01:23:58, 24 December 2024)
- ML19350A930 + (01:23:59, 24 December 2024)
- ML19350A924 + (01:24:01, 24 December 2024)
- W3P81-0350, Forwards Amend 16 to Application for Ol,Containing Amend 16 to FSAR + (01:24:02, 24 December 2024)
- ML19350A921 + (01:24:04, 24 December 2024)
- 05000346/LER-1981-012-03, /03L-0:on 810212,control Rod 1-3 Absolute Position Indication Declared Inoperable Due to Fluctuating Signals Causing Asymmetric Rod Alarms.Exact Cause Undetermined,But Absolute Position Indication Leads Picking Up Noise + (01:24:06, 24 December 2024)
- 05000346/LER-1981-012, Forwards LER 81-012/03L-0 + (01:24:08, 24 December 2024)
- ML19350A916 + (01:24:09, 24 December 2024)
- ML19350A914 + (01:24:10, 24 December 2024)
- ML19350A915 + (01:24:10, 24 December 2024)
- ML19350A913 + (01:24:12, 24 December 2024)
- ML19350A912 + (01:24:13, 24 December 2024)
- ML19350A911 + (01:24:14, 24 December 2024)
- ML19350A910 + (01:24:14, 24 December 2024)
- ML19350A909 + (01:24:15, 24 December 2024)
- ML19350A906 + (01:24:16, 24 December 2024)
- IR 05000445/2019201 + (01:24:16, 24 December 2024)
- 05000327/LER-1981-021-03, /03L-0:on 810211,reactor Coolant Pumps 1 & 2 Were Stopped.Caused by RCS Pressure Going to Zero After RHR Containment Spray Isolation Valve Inadvertently Opened.Pumps Returned to Operable Status in Approx 1-h + (01:24:18, 24 December 2024)
- 05000327/LER-1981-021, Forwards LER 81-021/03L-0 + (01:24:21, 24 December 2024)
- ML19350A901 + (01:24:30, 24 December 2024)
- ML19350A900 + (01:24:32, 24 December 2024)
- PNO-IV-81-007, on 810310,three Contract Maint Workers Found Working in High Radiation Area W/O Health Physics Technician Supervision or Knowledge of Existing Radiation Hazards. Caused by Lax Administrative Controls for Area Door Keys + (01:24:34, 24 December 2024)
- ML19350A898 + (01:24:36, 24 December 2024)
- PNO-III-81-023, on 810228,facility Shut Down to Investigate Step Increase in Unidentified Leakage in Drywell.Caused by Packing Leaks in Reactor Feedwater Piping Check Valve. Further Repairs to Be Conducted + (01:24:38, 24 December 2024)
- ML19350A896 + (01:24:39, 24 December 2024)
- PNO-III-81-028, on 810309,resident Inspector Notified of Intent to Replace Boron Injection Tank.Caused by Leakage in Manway Liner & Pipe Nozzle Liners.Replacement of Tank to Extend Current Outage for Approx 4 Wks + (01:24:41, 24 December 2024)
- PNO-III-81-027, on 810307,controlled Power Reduction Initiated Due to Combustible Gases Found in Oil from Main Transformer.Cause Not Stated.Repair or Replacement of Transformer Expected to Take 1 Wk + (01:24:43, 24 December 2024)
- ML19350A891 + (01:24:45, 24 December 2024)
- PNO-III-81-025, on 810306,received Telcon Re Failure of Containment Integrated Leak Rate Test.Cause Traced to Excessive Leakage in Personnel Air Lock,Portions of TMI Sample Sys & TMI Wide Range Pressure Gauges + (01:24:45, 24 December 2024)
- PNO-I-81-034, on 810310,contents of 55-gallon Drum Used to Catch Radioactive Drains Flowed Into Storm Drain Sys Before Drains Were Plugged.Caused by Cooling Water Supply Valve Not Tightly Shut When Draining Lube Oil Cooler + (01:24:48, 24 December 2024)
- ML19350A889 + (01:24:48, 24 December 2024)