Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000293/LER-1999-006-02, :on 990705,both EDGs Were Inoperable.Caused by Ambient Air Temp Exceeding 88 Degrees Fahrenheit.Temporary Mods Tm 99-41 & Tm 99-42,implemented for EDG a Were Completed on 990706.With + (19:32:48, 23 May 2025)
- 05000423/LER-1986-029, :on 860329,turbine-driven Auxiliary Feedwater Pump Exceeded Temp Limit of 110 F by 11.2 F.Caused by Failure of Air Conditioning Unit.Equipment Repaired & Temp Under Limit within 12 H of Incident + (19:32:50, 23 May 2025)
- 05000395/LER-1986-006, :on 860402,turbine Generator Trip Caused Reactor Trip.Caused by Loss of Excitation to Main Generator Due to Worn Brushes on Outboard Collector Ring.Brushes Replaced & Slip Ring Buffed + (19:33:00, 23 May 2025)
- ML20210M952 + (19:33:06, 23 May 2025)
- 05000369/LER-1986-007-01, :on 860325,reactor Tripped on Steam Generator Lb lo-lo Level Signal.Caused by Failure of Bussman Fuses. Indicating Fuses Will Be Replaced W/Nonindicating Fuses + (19:33:09, 23 May 2025)
- ML20210M926 + (19:33:13, 23 May 2025)
- 05000302/LER-1997-020, :on 970718,identified Failure of CREVS in-place Testing of HEPA Filters to Meet Improved TS Surveillance Requirement.Caused by Cognitive Personnel Error.Will Revise Ventilation Filter Test Program + (19:33:22, 23 May 2025)
- ML20210M879 + (19:33:26, 23 May 2025)
- 05000483/LER-1997-006, :on 970719,degraded Field Supply Voltages & Loss of Several Main Control Board Annunciators Occurred. Caused by Lightning Strikes & Inadequate Procedural Guidance.Revised Applicable Procedures + (19:33:33, 23 May 2025)
- ML20210M836 + (19:33:37, 23 May 2025)
- ML20210M832 + (19:33:39, 23 May 2025)
- ML20210M818 + (19:33:42, 23 May 2025)
- ML20210M811 + (19:33:46, 23 May 2025)
- ML20210M804 + (19:33:51, 23 May 2025)
- ML20210M778 + (19:33:58, 23 May 2025)
- ML20210M772 + (19:33:59, 23 May 2025)
- ML20210M765 + (19:34:02, 23 May 2025)
- 05000354/LER-1997-016, :on 970716,notified by NRC That Surveillance Requirement Re Filtration,Recirculation & Ventilation Sys Failed to Comply W/Plant UFSAR Commitments.Caused by Failure to Clarify Ufsar.Completed 10CFR50.59 SE + (19:34:18, 23 May 2025)
- ML20210M613 + (19:35:12, 23 May 2025)
- ML20210M604 + (19:35:15, 23 May 2025)
- ML20210M573 + (19:35:23, 23 May 2025)
- ML20210M567 + (19:35:25, 23 May 2025)
- 05000266/LER-1997-035, :on 970516,discovered Inadequate Seismic Support for Reactor Coolant Pump Rotor Stand.Caused by Rotor Stand Being Stored Since Initial Plant Construction.Moved Rotor Stand & Verified as Seismically Adequate + (19:35:27, 23 May 2025)
- ML20210M521 + (19:35:36, 23 May 2025)
- ML20210M302 + (19:36:15, 23 May 2025)
- NRC-72-1044, 7-22-20 Order (DC Cir.)(Case No. 19-1198)(Consolidated with 20-1019) + (19:36:28, 23 May 2025)
- IR 05000413/1998013 + (19:37:00, 23 May 2025)
- TAC:M97091 + (19:37:22, 23 May 2025)
- TAC:L30988 + (19:37:35, 23 May 2025)
- NUREG-1212, Informs That Papers from Apr 1986 NEA Symposium in Japan Re Reduction of Scram Frequency Available for Public Insp at Pdr.Recently Published NUREG-1212 Presents NRC Findings Re Initial Phase of Maint & Surveillance Program + (19:37:54, 23 May 2025)
- TAC:L31146 + (19:38:31, 23 May 2025)
- IR 05000352/1986001 + (19:38:33, 23 May 2025)
- NUREG-0560, Forwards NRC Response to Congressman Matsui Re Broader Issues Related to B&W Design.Efforts to Enhance Response & Review of Events Underway.Plans to Reexam B&W Design in Progress + (19:38:36, 23 May 2025)
- NUREG-1195, Forwards Response to Re NRC Reexam of B&W Reactor Design.Review Efforts Intensified After TMI Accident.Nrr Reorganized Last Yr to Increase Attention to Major Vendor Product Lines.Action Plan Under Development for Rancho Seco + (19:38:44, 23 May 2025)
- L-97-005, Forwards Revised Typed Pages for TS Change Requests 213 & 80 Resulting from 970618-19 & 970626 Telcons,Requiring Addl Revs from Pages Submitted to NRC in + (19:39:00, 23 May 2025)
- L-97-004, Forwards FFD Program Six Month Rept for Period 970101-0630, Per 10CFR26.71(d) + (19:39:11, 23 May 2025)
- 05000361/LER-1997-010-01, Forwards LER 97-010-01 for Check Valve in Charging Subsystem Which Failed to Open Completely.Single Rept for Unit 2 Is Being Submitted as Condition Involved Same System,Cause & Corrective Actions Applicable to Units 2 & 3 + (19:39:54, 23 May 2025)
- IR 05000482/1985044 + (19:39:54, 23 May 2025)
- ML20210L067 + (19:40:42, 23 May 2025)
- IR 05000382/1986004 + (19:41:00, 23 May 2025)
- TAC:M97018 + (19:41:01, 23 May 2025)
- IR 05000275/1985045 + (19:41:57, 23 May 2025)
- ML20210K642 + (19:42:46, 23 May 2025)
- NUREG/CR-4405, Forwards Advance Copies of Draft NUREG/CR-4405, PRA Insights & Reliability & Risk Assessment Branch Draft Rept, Insights Gained from Pras, for Comments & Suggestions + (19:42:47, 23 May 2025)
- ML20210K602 + (19:42:57, 23 May 2025)
- IR 05000424/1985053 + (19:43:18, 23 May 2025)
- IR 05000413/1986024 + (19:43:23, 23 May 2025)
- 05000482/LER-1996-001-01, Forwards LER 96-001-01 Concerning Esfa & 10CFR50.73(a)(2)(i)(B) for Violation of TS + (19:43:36, 23 May 2025)
- 05000370/LER-1997-002, Forwards LER 97-002-00 Re RT Due to RCP Motor Failure,Per 10CFR50.73,Sections (a)(1) & (D) + (19:44:01, 23 May 2025)
- ML20210K283 + (19:44:13, 23 May 2025)
- ML20210K253 + (19:44:20, 23 May 2025)