ML20210M952

From kanterella
Jump to navigation Jump to search
Discusses Arrangements Made for Administration of Licensing Exams 50-413/97-300 & 50-414/97-300 on 971201-15.Staff Should Furnish Proposed Exam Outlines by 970922 in Order to Meet Exam Schedule
ML20210M952
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/13/1997
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Gordon Peterson
DUKE POWER CO.
References
NUDOCS 9708220303
Download: ML20210M952 (4)


See also: IR 05000413/1997300

Text

_

'

, ,>

August 13, 1997

Juke Power Company

{

KfTN: Mr. G. R. Peterson

l

Site Vice President

Ca_awba Site

'

4800 ConcWd PMd

l

York, SC W745MJe

SUB,8ECT:

REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS

CATAWBA NUCLEAR STATION 50-413/97-300 AND 50414/97 300

Dear Mr. Peterson:

l

In a telephone conversation on August 4,1997, between Mr. Scott Bradshaw, Operations

Training and Mr. D. Charles Payne, License Examiner, arrangements were made for the

l

administration oflicensinc examinations at the Catawba Nuclear Station during the weeks of

l

December 1 and Decemoer 15,1997.

Your staff will prepare the proposed examinations in accordance with the guidelines in Revision

8, of NUREG-1021, " Operator Licensing Examination Standards for Power Reactors." The

NRC regional office will discuss with your staff any examination changes that might be

necessary prior to their administration.

To meet the above scheduie, it will be necessary for your staff to furnish the proposed

examination outlines by September 22,1997. The proposed written examinations, operating

tests, Pnd the supporting reference materials identified in Attachment 2 of ES 201 will be due by

October 20,1997. Any delay in receiving the required reference and examination materials or

the submittal of inadequate or incomplete materials may result in the examinations being

rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to prov!de adequate space and accommodations in accordance with ES 402 and

to make the simulation facility available on the dates noted above in accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG 1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

Your staff should submit preliminary reactor operator and senior reactor operator license

applications and waiver requests at least 30 days before the first examination date so that the

NRC will be able to revi>w the applications and the medical certifications and evaluate any

reqyested waivers. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

9708220303 970813

D

(lll

3

g

  1. or

_

-

"

..

DPC

2

This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-

0101, which expires April 30,2000. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response,

including gathering, xeroxing and malling the required reference material; the estimated

average burden to prepare the examinations is 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />. Send comments regarding this

bu, den estimate or any other aspect of this collection of information, including suggestions for

reducing this burden, to the Information and Records Management Branch, Mail Stop T-6 F33,

Office of Information Resources Management, U.S. Nuclear Regulatory Commission,

Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of

Information and Regulatory Affairs, NEOB 10202, Office of Management and Budget,

Washington, D.C. 20503.

Thank you for your cooperation in this matter. Mr. Bradshaw has been advised of the policles

and guidelines referenced in this letter, if you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Payne at (404) 562-4647, or myself

at (404) 562-4638.

Sincerely,

(Original signed by T. A, Peebles)

Thomas A. Peebles, Chief

Operator Licensing and Human

Per~ormance Branch

Division of Reactor Safety

Docket Nos. 50-413,50-414

License Nos. NPF-35, NPF-52

cc:

M. S. Kitlan

Regulatory Compliance Manager

Duke Power Company

4800 Concord Road

York, SC 29745 9635

Paul R. Newton -

Duke Power Company

_j

422 South Church Street

]

Charlotte, NC 28242-0001

,

cc cont'd: {See page 2}

... ,

.

.

.

.

.

.

"

..

DPC

3

cc cont'd:

Robert P. Gruber

Karen E. Long

Executive Director

Assistant Attorney General

Public Staff NCUC

N. C. Department of Justice

P. O. Box 29520

P. Box 629

Raleigh, NC 27626-0520

Raleigh, NC 27602

J. Michael McGarry, Ill, Esq.

Saluda River Electric

Winston and Strawn

Cooperative, Inc.

1400 L Street, NW

P. O. Box 929

l

Washington, D. C, 20005

Laurens, SC 129360

!

North Carolina MPA 1

County Manager of York County

'

Suite 600

York County Courthouse

P. O. Box 29513

York, SC 29745

- Raleigh, NC 27626-0513

Piedmont Municipal Power Agency -

Max Batavia, Chief

121 Village Drive

Bureau of Radiological Health

Greer, SC 29651

S. C. Department of Health

and Environmental Control

G.A.Copp

2600 Bull Street

Licensing - EC050

Columbia, SC 29201

Duke Power Company

P. O. Box 1006

Richard P. Wilson, Esq.

Charlotte, NC 28201-1006

Assistant Attorney General

S. C. Attorney General's Office

T. Richard Puryear

P. O. Box 11549

Owners Group -

Columbia, SC 29211

North Carolina Electric

Membership Corporation

Michael Hirsch

4800 Concord Road

Federal Emergency Management

York, SC 29745

Agency

500 C Street, SW, Room 840

Ron Jones

Washington, D. C,- 20472

Plant Manager

Catawba Nuclear Station

North Carolina Electric

4800 Concord Road

Membership Corporation

York, SC 29745-9635

P. O. Box 27306

Raleigh, NC 27611

W. H. Miller -

Training Manager

Catawba Nuclear Station

4850 Concord Road

York, SC 29745

Distribution w/ encl; {See page 4} -

-

.

, , , . *

DPC

4

Distribution w/ encl:

P. Tam, NRR

R. Carroll, Ril

C. Payne, Rll

B. Michael, Rll

PUBLIC

NRC Resident inspector

U.S. Nuclear Regulator Commission

4830 Concord Road

York, SC 29745

!

__

0FFICE

tl[4h

Ril:DRS

Ril:DRP

RlltDRS

,

SIGNATURE

/N~

gy V

$M

Mg/

NM

D M M luo

OL POC

SSchaeffer

TPeebles'

DATE

S/ -)

/97-

8/ 7 /97

81 /l /97

8/_/2 /97

8/

/97

8/

/97

8/

/97

crev,

vrs # so >

vrs

e

/vre

no

QW

mo

vrs

no

vrs

no

vrs

no

0FilCIALREUDCOPY -

" DOC M N W : Ga\\LkWIT\\1200A300.DCP

j

)

.

.

-

- - - . -

-

.

.

-

,