Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000369/1986028 + (17:59:17, 23 May 2025)
- ML20211J343 + (17:59:36, 23 May 2025)
- ML20211J332 + (17:59:45, 23 May 2025)
- ML20211J316 + (17:59:54, 23 May 2025)
- ML20211J308 + (17:59:57, 23 May 2025)
- DCL-84-141, Forwards Response to 840406 Request for Info Re Allegations 92 & 93 (Sser 22) Concerning Tube Steel Used in Pipe Supports.Related Info Encl + (18:00:06, 23 May 2025)
- ML20211J278 + (18:00:32, 23 May 2025)
- ML20211J273 + (18:00:34, 23 May 2025)
- ML20211J245 + (18:00:55, 23 May 2025)
- ML20211J219 + (18:01:13, 23 May 2025)
- 05000483/LER-1997-008, :on 970909,SRO Not Present in Main Control Room During Mode 1 Operations Contrary to TS 6.2.2.b Due to Personnel Error.Caused by Lack of Effective Communication. Personnel Reminded of Need for Communication + (18:01:27, 23 May 2025)
- ML20211J178 + (18:01:52, 23 May 2025)
- ML20211J169 + (18:01:55, 23 May 2025)
- ML20211J161 + (18:01:57, 23 May 2025)
- ML20211J121 + (18:02:05, 23 May 2025)
- 05000289/LER-1997-003-01, Forwards LER 97-003-01 Re Potential Overpressurization of Makeup Pump Suction Piping,Due to Inadequate Test & Operating Procedures + (18:02:20, 23 May 2025)
- ML20211J007 + (18:02:34, 23 May 2025)
- ML20211H939 + (18:02:53, 23 May 2025)
- ML20211H931 + (18:02:55, 23 May 2025)
- IR 05000267/1986016 + (18:03:00, 23 May 2025)
- 05000293/LER-1997-011-01, Forwards LER 97-011-01 Re Svc Water Sys Single Failure Vulnerability.Ltr Contains Listed Commitments + (18:03:06, 23 May 2025)
- L-97-037, Forwards Rev 0 to Bvps,Unit 2, Probabilistic Risk Assessment,Ipeee,Summary Rept, in Response to GL 88-20, Supplement 4.Summary Rept Organized IAW IPEEE Submittal Guidance of NUREG-1407 + (18:03:14, 23 May 2025)
- 05000266/LER-1997-037, :on 970903,potential Failure of EDG Load Sequence Occurred.Caused by Inadequate Design of EDG Load Sequencing Logic.Mod Restored Operability of EDG During Load Sequencing + (18:03:17, 23 May 2025)
- ML20211H829 + (18:03:29, 23 May 2025)
- 05000416/LER-1997-003-01, Forwards LER 97-003-01 Re CR Envelope Leakage Potentially Exceeding License Condition 2.C(38) Limit + (18:03:34, 23 May 2025)
- 05000289/LER-1999-007-01, Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface + (18:04:51, 23 May 2025)
- 05000461/LER-1996-014-01, Forwards LER 96-014-01,containing Cause for Event & Corrective Actions to Prevent Recurrence Re Inadequately Tested Auxiliary Bldg Roof Plug.Commitments,Listed + (18:04:52, 23 May 2025)
- 05000461/LER-1997-009-01, Forwards LER 97-009-01 Re Identification of Surveillance Procedure Which Does Not Adequately Consider Accuracy of Installed Instrumentation in Meeting TS Requirements for Reactor Core Isolation Cooling Pump.Commitments,Liste + (18:05:33, 23 May 2025)
- IR 05000528/1986017 + (18:05:39, 23 May 2025)
- ML20211H267 + (18:05:52, 23 May 2025)
- IR 05000321/1986004 + (18:06:11, 23 May 2025)
- TAC:MA0534 + (18:06:15, 23 May 2025)
- 05000302/LER-1997-028, :on 970902,flow Element Accuracy Uncertainty That May Be Greater than Assumed Identified.Caused by Design Error.No Immediate Corrective Actions Necessary.Testing of Existing Flow Elements to Be Completed by 971031 + (18:06:18, 23 May 2025)
- ML20211H156 + (18:06:22, 23 May 2025)
- ML20211H131 + (18:06:28, 23 May 2025)
- ML20211H057 + (18:06:48, 23 May 2025)
- TAC:M97097 + (18:06:51, 23 May 2025)
- IR 05000424/1986060 + (18:07:03, 23 May 2025)
- ML20211G989 + (18:07:06, 23 May 2025)
- RBG-25207, Forwards Emergency Planning Exercise Scenario for 870225 Exercise,Per NRC 840209 Request.Scenario Package Contains Exercise Objectives,Observer Info,Narrative Summary & Onsite & Offsite Messages + (18:07:08, 23 May 2025)
- ML20211G974 + (18:07:10, 23 May 2025)
- ML20211G968 + (18:07:13, 23 May 2025)
- L-99-133, NPDES Monthly Discharge Monitoring Rept for July 1999 for Bvps,Units 1 & 2. with + (18:07:22, 23 May 2025)
- ML20211G730 + (18:08:08, 23 May 2025)
- ML20211G620 + (18:08:34, 23 May 2025)
- ML20211G527 + (18:08:57, 23 May 2025)
- DD-86-12, Advises That Time for Commission to Review Directors Decision DD-86-12 Expired.Commission Declined Review. Decision Became Final Agency Action on 861027.Served on 861030 + (18:08:59, 23 May 2025)
- IR 05000313/1986007 + (18:09:10, 23 May 2025)
- IR 05000155/1986001 + (18:09:15, 23 May 2025)
- 05000298/LER-1999-006, :on 990727,inadvertent half-group VII Isolation Was Noted.Caused by Deenergization of Relay.Reset PCIS-REL-K65 Relay & half-group VII Isolation + (18:09:16, 23 May 2025)
- IR 05000250/1986017 + (18:09:18, 23 May 2025)