Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20216F115 + (10:24:54, 23 May 2025)
- ML20216F068 + (10:25:13, 23 May 2025)
- ML20216F048 + (10:25:23, 23 May 2025)
- ML20216F015 + (10:25:31, 23 May 2025)
- 05000456/LER-1998-001-07, :on 980205,failed to Test ESF Logic Circuit Due to Oversight by Personnel Reviewing TS for Surveillance Requirements Prior to start-up of Either Unit.Effectiveness of CAs Will Be Evaluated + (10:25:32, 23 May 2025)
- 05000254/LER-1997-015-02, :on 970622,discovered That 10CFRE50,App G Pressure Testing Requirements Were Not Met.Caused by Failure of Station Personnel to Recognize All Organizational Challenges Which Could Occur in Controlling.Performed Test + (10:25:35, 23 May 2025)
- ML20216F005 + (10:25:37, 23 May 2025)
- LIC-97-0136, Comment on Proposed Rules 10CFR50 & 73, Frequency of Reviews & Audits for Emergency Preparedness Programs, Safeguards Contingency Plans & Security Programs for Nuclear Power Reactors + (10:25:41, 23 May 2025)
- ML20216E975 + (10:25:46, 23 May 2025)
- 05000461/LER-1998-011, :on 980312,CR Ventilation Sys Was Declared Inoperable Due to Broken/Missing Conduit Hold Down Restraints on VC Chiller Skids.Caused by Personnel Walking on Equipment.Generated Work Requests + (10:26:11, 23 May 2025)
- ML20216E922 + (10:26:16, 23 May 2025)
- 05000461/LER-1996-010-01, Forwards LER 96-010-01, Plant Shutdown Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit. Revised Rept Includes Cause of Event,Corrective Actions & Discussion of Similar Even + (10:26:31, 23 May 2025)
- 05000483/LER-1999-005, :on 990812,operating Conditions Exceeding Previously Analyzed Values Resulted in Inoperability of Both Offsite Sources.Caused by Inadequate Acs.Changed Transformer Tap Settings.With + (10:26:55, 23 May 2025)
- 05000295/LER-1997-018-01, Forwards LER 97-018-01,which Clarifies Info on Event Description,Root Causes & Safety Analysis.Corrective Actions Have Also Been Updated.Commitments Made within Ltr,Encl + (10:27:17, 23 May 2025)
- ML20216E819 + (10:27:18, 23 May 2025)
- ML20216E782 + (10:27:36, 23 May 2025)
- ML20216E740 + (10:27:50, 23 May 2025)
- IR 05000382/1997011 + (10:27:57, 23 May 2025)
- L-99-031, Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed + (10:27:58, 23 May 2025)
- IR 05000298/1997006 + (10:28:00, 23 May 2025)
- ML20216E691 + (10:28:14, 23 May 2025)
- L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with + (10:28:16, 23 May 2025)
- 05000295/LER-1997-016-01, Forwards LER 97-016-01,which Clarifies Info on Event Description,Root Causes & Safety Analysis.Cas Have Been Updated.Attachment a Provides Commitments Associated W/ Correspondence + (10:28:26, 23 May 2025)
- ML20216E661 + (10:28:34, 23 May 2025)
- ML20216E650 + (10:28:43, 23 May 2025)
- TXX-9810, LAR 98-005 to Licenses NPF-87 & NPF-89,incorporating Encl Change Into Plant,Units 1 & 2 Ts.Change Is Applicable to Unit 2 & Administrative for Unit 1.Affidavit,encl + (10:28:50, 23 May 2025)
- 05000483/LER-1999-003, :on 990811,pipe Rupture Occurred in Six Inch Drain Line Located Between D Moisture Separator Reheater First Stage Reheater Drain Tank.Caused by Flow Accelerated Corrosion.Ruptured Piping Replaced.With + (10:29:12, 23 May 2025)
- ML20216E560 + (10:29:16, 23 May 2025)
- ML20216E525 + (10:29:28, 23 May 2025)
- ML20216E513 + (10:29:41, 23 May 2025)
- ML20216E504 + (10:29:50, 23 May 2025)
- IR 05000424/1997011 + (10:29:57, 23 May 2025)
- 05000461/LER-1999-010, :on 990809,declared Div 2 EDG Inoperable Due to Fuel Leaking Into Lube Oil.Replaced Fuel Return Line from Engine Number 12 Cylinder on Div 2 Edg.With + (10:30:26, 23 May 2025)
- DD-98-03, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision DD-98-03 Has Expired.Commission Declined Review.Decision Became Final on 980413.W/Certificate of Svc.Served on 980415 + (10:30:31, 23 May 2025)
- 05000333/LER-1998-015-02, Forwards LER 98-015-02 Re Logic Sys Functional Test Inadequacies,Per 10CFR50.73(A)(2)(i)(B).Rept Revised to Reflect Scheduled Completion Date for Corrective Action 3 of Jan 15, 2000 & Updates Status of Other C/As as Complete + (10:30:34, 23 May 2025)
- ML20216E420 + (10:30:39, 23 May 2025)
- L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With + (10:30:41, 23 May 2025)
- IR 05000361/1997099 + (10:31:12, 23 May 2025)
- IR 05000313/1997004 + (10:31:17, 23 May 2025)
- ML20216E305 + (10:31:24, 23 May 2025)
- 05000336/LER-1997-022-01, Forwards LER 97-022-01 Which Documents Multiple Deficient Conditions Identified at Mnps,Unit 2,during Detailed Review of Units TS to Address Commitment B16076-2.List of Commitments Made within Ltr,Provided + (10:31:34, 23 May 2025)
- IR 05000424/1996011 + (10:31:49, 23 May 2025)
- ML20216E140 + (10:32:10, 23 May 2025)
- ML20216E132 + (10:32:13, 23 May 2025)
- TXX-9912, Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise + (10:32:32, 23 May 2025)
- 05000302/LER-1996-006-01, Informs That Due Date for NRC Commitment Contained in LER 96-006-01,has Been Missed.Completion of Commitment to Evaluate Plant Mods Is Dependent Upon Computer Models Being Developed for HPSI Upgrade Project + (10:32:38, 23 May 2025)
- IR 05000295/1997025 + (10:32:41, 23 May 2025)
- COM-101, Forwards from Ge,Requesting Amend to Export License XCOM-1019.Requested Amend Will Be Issued After Required Fifteen Day Waiting Period + (10:32:57, 23 May 2025)
- IR 05000282/1997023 + (10:33:11, 23 May 2025)
- 05000445/LER-1997-004-05, Forwards LER 97-004-05,re Issues Discovered During Review of GL 96-01,associated W/Ts Surveillances.Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 + (10:33:16, 23 May 2025)
- IR 05000440/1998001 + (10:33:28, 23 May 2025)