ML20216E661

From kanterella
Jump to navigation Jump to search
Forwards Vols 1-4 of Rev 28 to Surry Power Station UFSAR, Which Involves Reformatting Entire Document in Order to Utilize Electronic Means to Enhance Maint.Rev Includes Updates to Chapter 17,containing Operational QA Program
ML20216E661
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/03/1998
From: Ohanlon J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18151A173 List: ... further results
References
98-076, 98-76, NUDOCS 9803180119
Download: ML20216E661 (3)


Text

~..

WUINI A EI,ECTRIC AND POWER CmWANY RicuvmI>, Vnu: INIA 23261 March 3, 1998 4

United States Nuclear Regulatory Commission Serial No.98-076 Attention: Document Control Desk CM/RPC i

Washington, D.C. 20555 Docket Nos. 50-280 50-281

{

License Nos. DPR-32 DPR-37 i

Gentlemen:

In addition to the changes containing updated information, Revision 28 involves reformatting the entire document in order to utilize electronic means to enhance UFSAR maintenance. This revision also includes updates to Chapter 17 of the UFSAR which contains 'he Operational Quality Assurance (QA) Program. The changes to the program descriptien do not reduce the commitments contained therein.

One signed original and ten copies of Revision 28 to the UFSAR are enclosed. Each revision package contains replacement instructions, four volumes of Revision 28 pages, and a folded set of reference drawings. The Revision 28 pages replace the existing text, tables, figures, tabs, and binder spine labels as described in the instructions.

As a duly authorized officer of the Virginia Electric and Power Company, I hereby certify that the information given in the enclosed Revision 28 of the UFSAR accurately presents changes prepared pursuant to Commission requirements.

Very truly yours, W

James P. O'Hanlon Senior Vice President - Nuclear 0

\\\\\\

i' Enclosures h,fhhf lf 9903190119 990303

/

PDR ADOCK 05000280 K

PDR Y

i

g.,,

cc:

U. S. Nuclear Regulatory Commission Region ll

- Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303 Mr. R. A. Musser NRC Senior Resident inspector Surry Power Station

)

l

l COMMONWEALTH OF VIRGINIA

)

)

COUNTY OF HENRICO

)

1

- The foregoing document was acknowledged before me, in and for the County

]

and Commonwealth aforesaid, today by J. P. O'Hanlon, who is Senior Vice

' President - Nuclear, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document

' in behalf of that Company, and that the statements in the document are true to the best of his knowledge ar.d belief.

Acknowledged before me this 3 day of OL

.19 My Commission Expires: March 31,2000.

b OlthO $((_0DA

~

d Notary Public (SEAL)

__]