Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19351A696 + (23:36:33, 23 December 2024)
- ML19351A693 + (23:36:34, 23 December 2024)
- ML19351A692 + (23:36:35, 23 December 2024)
- ML19351A690 + (23:36:36, 23 December 2024)
- ML19351A689 + (23:36:37, 23 December 2024)
- ML19351A687 + (23:36:38, 23 December 2024)
- ML19351A685 + (23:36:39, 23 December 2024)
- ML19351A686 + (23:36:39, 23 December 2024)
- ML19351A684 + (23:36:40, 23 December 2024)
- ML19351A683 + (23:36:41, 23 December 2024)
- ML19351A682 + (23:36:42, 23 December 2024)
- ML19351A681 + (23:36:43, 23 December 2024)
- ML19351A680 + (23:36:45, 23 December 2024)
- ML19351A679 + (23:36:46, 23 December 2024)
- ML19351A678 + (23:36:47, 23 December 2024)
- ML19351A677 + (23:36:48, 23 December 2024)
- 05000458/LER-1989-038, :on 891113,unplanned Loss of Div I 125 Volt Dc Bus Occurred.Caused by Failure to Adequately Verify Clearance Boundaries.Power Restored to Bus & Isolations Reset + (23:36:50, 23 December 2024)
- 05000373/LER-1989-027-01, :on 891113,primary Containment Isolation Sys Group I Isolation Occurred While Performing Instrument Surveillance.Caused by Loss of Power to Leak Detection Sys Logic.Isolation Reset + (23:36:52, 23 December 2024)
- ML19351A674 + (23:36:54, 23 December 2024)
- 05000368/LER-1989-022-01, :on 891114,inadequate post-maint Test Controls Resulted in de-energizing 4,160 Volt Ac ESFs Electric Bus Uexpectedly.Caused by Inadequate post-maint Test Controls. Job Order Instructions Changed + (23:36:56, 23 December 2024)
- 05000301/LER-1989-009-01, :on 891115,unexpected Steam Generator a lo-lo Level & Steam Generator B lo-lo Level Reactor Trip Signals Experienced.Caused by Installation of Analog Signal Generator.Procedures Revised + (23:36:58, 23 December 2024)
- RBG-31935, Monthly Operating Rept for Nov 1989 for River Bend Station Unit 1 + (23:36:59, 23 December 2024)
- ML19351A670 + (23:37:02, 23 December 2024)
- IR 05000282/1989027 + (23:37:04, 23 December 2024)
- ML19351A667 + (23:37:06, 23 December 2024)
- ML19351A665 + (23:37:07, 23 December 2024)
- ML19351A664 + (23:37:08, 23 December 2024)
- ML19351A662 + (23:37:09, 23 December 2024)
- LIC-89-1145, Forwards Monthly Operating Rept for Nov 1989 for Fort Calhoun Station & Revised Operations Summary for Rept.Listed Supplemental Sections Deleted from Rept + (23:37:10, 23 December 2024)
- ML19351A661 + (23:37:10, 23 December 2024)
- RBG-31944, Special Rept:On 891114,trip Occurred on Div I Diesel Generator 1EGS*EG1A.Caused by Defective High Bearing Temp Detector & Water in Plastic Tubing Used to Connect Test Gauge.Shutdown Logic Board & Defective Connector Replaced + (23:37:12, 23 December 2024)
- ML19351A657 + (23:37:15, 23 December 2024)
- IR 05000206/1989027 + (23:37:28, 23 December 2024)
- ML19351A654 + (23:37:30, 23 December 2024)
- ML19351A652 + (23:37:31, 23 December 2024)
- ML19351A653 + (23:37:31, 23 December 2024)
- ML19351A651 + (23:37:32, 23 December 2024)
- PNO-II-89-079, on 891205,automatic Reactor Trip Experienced from Approx 7% Power from lo-lo Level in Steam Generator B Following Partial Loss of electro-hydraulic Control Sys Pressure.Outage Expected to Last from 7 to 10 Days + (23:37:34, 23 December 2024)
- ML19351A647 + (23:37:35, 23 December 2024)
- ML19351A645 + (23:37:36, 23 December 2024)
- IR 05000373/1989027 + (23:37:37, 23 December 2024)
- ML19351A641 + (23:37:39, 23 December 2024)
- 05000254/LER-1989-020-03, :on 891117,full Reactor Scram Occurred Due to Simultaneous Loss of Power to 1A & 1B 24/48-volt Distribution Panels During Panel Transfer.Caused by Personnel Error.Personnel Trained Re Event + (23:37:41, 23 December 2024)
- 05000245/LER-1989-022-01, :on 891117,analysis Indicated That Feedwater Coolant Injection Sys May Be Required to Deliver Flow in Excess of Sys Pump Flow Capabilities During LOCA W/Loss of Air.Backup Air Supply to Valves Added + (23:37:44, 23 December 2024)
- 05000423/LER-1989-028, :on 890524,fuel Bldg roll-up Door Opened While Fuel Movement in Progress,Causing Loss of Fuel Bldg Integrity.Caused by Miscommunication Between Personnel. Procedures Re Fuel Bldg Doors Strengthened + (23:37:47, 23 December 2024)
- AECM-89-0225, Forwards Response to Generic Ltr 89-21 Re Status of Implementation of USI Requirements at Facility + (23:37:48, 23 December 2024)
- TAC:66104 + (23:37:50, 23 December 2024)
- ML19351A633 + (23:37:53, 23 December 2024)
- ML19351A634 + (23:37:53, 23 December 2024)
- B13110, Application for Amend to License NPF-49,extending Interval That Accumulator Can Be Inoperable,Due to Boron Concentration Outside Required Limit or for Reason Other than Closed Isolation Valve from 1 H to 72 H + (23:37:54, 23 December 2024)
- ML19351A629 + (23:38:00, 23 December 2024)