ML19351A633

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re Limiting Condition for Operation & Surveillance Requirements for Accumulators in ECCS
ML19351A633
Person / Time
Site: Millstone 
Issue date: 12/11/1989
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML19351A632 List:
References
NUDOCS 8912200066
Download: ML19351A633 (2)


Text

'fr w

l i

D.ocket No. 50-423 B13110 1

i-L'-

!~

Attachment I Millstone Nuclear Power Station, Unit No. 3 Proposed Revision to Technical Specifications Accumulators L.

l December 1989 j$k22SDOCk

?c a

P 1

L-l

~

3/4.5 EMERGENCY CORE COOLING SYSTEMS 3/4.5.1 ACCUMULATORS LIMITING CONDITION FOR OPERATION 3.5.1 Each Reactor Coolant System (RCS) accumulator shall be OPERABLE with:

a.

The isolation valve open and power removed, b.

A contained borated water volume of between 6618 and 6847 gallons, c.

.A boron concentration of between 2200 and 2600 ppm, and d.

A nitrogen cover-pressure of between 636 and 694 psia.

APPLICABILITY: MODES 1, 2, and 3*.

ACTION:

a.

With one accumulator inoperable, except as a result of a closed isolation valve or boron concentration, restore the inoperable accumulator to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less than 1000 psig within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b.

With one accumulator inoperable due to the isolation valve being closed, either immediately open the isolation valve or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less than 1000 psig within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, c.

With the boron concentration of one accumulator outside the required limit, restore the boron concentration to within the required limits within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less than 1000 psig within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE RE0VIREMENTS 4.5.1.1 Each accumulator shall be demonstrated OPERABLE:

a.

At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by:

1)

Verifying the contained borated water volume and nitrogen cover-pressure in the tanks to be within the above limits, and L

2)

Verifying that each accumulator isolation valve is open.

b.

At least once per 31 days and within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after each solution volume increase of greater than or equal to 1% of tank volume by i

verifying the boron concentration of the accumulator solution; and

  • Pressurizer pressure above 1000 psig.

MILLSTONE - UNIT 3 3/4 5-1