- PNO-II-81-043, on 810616,plant Tripped Due to Offsite Power Loss.Caused by Lightning Strike on 230kv Feeder Line Supplying Startup Transformer.Testing Verified That No Damage Occurred.Transformer re-energized & Sys Restored + (15:16:14, 23 December 2024)
- ML20005A062 + (15:16:18, 23 December 2024)
- ML20005A063 + (15:16:18, 23 December 2024)
- ML20005A061 + (15:16:20, 23 December 2024)
- ML20005A060 + (15:16:21, 23 December 2024)
- 0CAN068108, Responds to Generic Ltr 81-07 Re NUREG-0612, Control of Heavy Loads.... Work on Interim Actions Completed.Extension of Select Response Dates Requested.Addl Info on Crane Design Compliance for Overhead Load Handling Sys Encl + (15:16:24, 23 December 2024)
- ML20005A056 + (15:16:24, 23 December 2024)
- ML20005A054 + (15:16:29, 23 December 2024)
- 05000321/LER-1981-051-03, /03L-0:810607,turbine Failed to Trip at Less than or Equal to 5,000 Rpm During Testing.Caused by Broken Turbine Trip Ball,Scored Trip Piston & Out of Calibr Diaphragm Oil Control Valve.Ball Replaced & Valve Cleaned + (15:16:31, 23 December 2024)
- ML20005A051 + (15:16:33, 23 December 2024)
- 05000369/LER-1981-064-03, /03L-0:on 810421,during Mode 3 Initial Fuel Loading,Wrong semi-daily Surveillance Item Checklists Run on Two Successive Shifts.Caused by Use of Wrong Procedures. Correct Checklist Completed & Personnel Cautioned + (15:16:34, 23 December 2024)
- 05000369/LER-1981-064, Forwards LER 81-064/03L-0 + (15:16:36, 23 December 2024)
- 05000369/LER-1981-063-03, /03L-0:on 810422,outer Door of Lower Personnel Air Lock Closed,But Locking Pins Stuck & Seals Failed to Inflate.Caused by Missing Shear Pin on Limit Switch Actuating Shaft.Pin Replaced & Door Declared Operable + (15:16:38, 23 December 2024)
- 05000321/LER-1981-051, Forwards LER 81-051/03L-0 + (15:16:40, 23 December 2024)
- 05000369/LER-1981-063, Forwards LER 81-063/03L-0 + (15:16:42, 23 December 2024)
- ML20005A042 + (15:16:43, 23 December 2024)
- ML20005A041 + (15:16:44, 23 December 2024)
- ML20005A039 + (15:16:45, 23 December 2024)
- 05000321/LER-1981-049-03, /03L-0:on 810605,reactor Core Isolation Cooling Valve Would Not Open by Control Switch During Testing.Caused by Relay Cover Binding on Logic Relay.Relay Cover Installed Correctly + (15:16:46, 23 December 2024)
- 05000369/LER-1981-059-03, /03L-0:on 810418,during Mode 3,while Settling Pond Water Being Released,Conventional Waste Water Discharge Flow Meter Strip Chart Recorder Did Not Match Meter Digital Readout.Caused by Switch Not Set to Level + (15:16:48, 23 December 2024)
- 05000321/LER-1981-049, Forwards LER 81-049/03L-0 + (15:16:50, 23 December 2024)
- 05000369/LER-1981-059, Forwards LER 81-059/03L-0.Detailed Event Analysis Encl + (15:16:52, 23 December 2024)
- ML20005A032 + (15:16:53, 23 December 2024)
- AECM-81-192, Final Deficiency Rept Re Seismically Unqualified 24-inch Starter/Breaker plug-in Drawers,Initially Reported on 810227.Drawers to Be Replaced W/Qualified Drawers of Varying Sizes + (15:16:54, 23 December 2024)
- ML20005A030 + (15:16:56, 23 December 2024)
- W3P81-1517, Forwards Matl Re SER Open Items 48, Reanalysis of Category 1 Structures & 49, Re-Evaluate Foundation Mat for Changes in Value of Subgrade Modulus + (15:16:58, 23 December 2024)
- ML20005A028 + (15:17:00, 23 December 2024)
- ML20005A026 + (15:17:02, 23 December 2024)
- ML20005A025 + (15:17:03, 23 December 2024)
- ML20005A023 + (15:17:04, 23 December 2024)
- ML20005A022 + (15:17:05, 23 December 2024)
- 05000369/LER-1981-066-03, /03L-0:on 810424,while in Mod 3,during Liquid Waste Release from Waste Monitor Tank,Chart Recorder Observed Not Functioning.Caused by Inadvertent Isolation of Flow Transmitter Associated W/Pump.Release Terminated + (15:17:06, 23 December 2024)
- 05000369/LER-1981-066, Forwards LER 81-066/03L-0.Detailed Event Analysis Encl + (15:17:08, 23 December 2024)
- 05000369/LER-1981-062-03, /03L-0:on 810421,while in Mode 3,Channel 4 of Steam Generator 1D Narrow Range Level Indicator Failed High. Caused by Loose Plug on Bellow Housing & Condensed Steam Draining from Impulse Line.Plug Tightened + (15:17:11, 23 December 2024)
- 05000369/LER-1981-062, Forwards LER 81-062/03L-0.Detailed Event Analysis Encl + (15:17:16, 23 December 2024)
- 05000338/LER-1981-046-03, /03L-0:on 810527,svc Water Supply Header B to Unit 1 & 2 Charging Pumps Was Isolated to Repair Leak in Supply Line.Probably Caused by Sulfate Reducing Bacteria in Svc Water Piping.Piping Replaced.Investigation Underway + (15:17:18, 23 December 2024)
- 05000366/LER-1981-049-03, /03L-0:on 810602,hi Hi Setpoints for Reactor Bldg Vent Radiation Monitors Were Discovered High.Caused by Setpoint Drift.Setpoint Changed + (15:17:20, 23 December 2024)
- A01482, Informs of Inability to Submit Info by 810622 Re Control of Heavy Loads in Response to to All Licensees of Operating Plants,Applicants for OLs & Holders of Cps. Response to Be Submitted by 810713 + (15:17:22, 23 December 2024)
- 05000338/LER-1981-046, Forwards LER 81-046/03L-0 + (15:17:26, 23 December 2024)
- 05000321/LER-1981-046-03, /03L-0:on 810603,reactor Water Level Switch 1B21-NO17C Found to Actuate Outside Tech Spec.Caused by Switch Setpoint Drift.Switch Recalibr + (15:17:28, 23 December 2024)
- 05000366/LER-1981-049, Forwards LER 81-049/03L-0 + (15:17:30, 23 December 2024)
- GO2-81-128, Responds to IE Bulletin 79-02,Revision 2, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. Results of Analysis on Plate Flexibility Sampling Testing Work Will Be Issued in First Quarter of 1982 + (15:17:31, 23 December 2024)
- 05000321/LER-1981-046, Forwards LER 81-046/03L-0 + (15:17:34, 23 December 2024)
- ML20005A004 + (15:17:36, 23 December 2024)
- ML20005A003 + (15:17:37, 23 December 2024)
- 05000369/LER-1981-029-03, /03L-0:on 810310,during Routine Insp,Flow Meter for Conventional Waste Water Treatment Discharge Line Was Not Operating Properly.Caused by Improper Setting of Select Switch.Flow Terminated & Select Switch Properly Set + (15:17:38, 23 December 2024)
- 05000369/LER-1981-029, Forwards LER 81-029/03L-0.Detailed Event Analysis Encl + (15:17:40, 23 December 2024)
- ML20004G129 + (15:17:42, 23 December 2024)
- ML20004G128 + (15:17:44, 23 December 2024)
- 05000369/LER-1981-032-03, /03L-0:during 810310-30,portions of Fire Detection Sys Were Inoperable for Periods Exceeding One Hour.Caused by Const in Area.Fire Watches & Patrols Were Established as Required + (15:17:45, 23 December 2024)
- ML20004G126 + (15:17:50, 23 December 2024)