ML20005A042
| ML20005A042 | |
| Person / Time | |
|---|---|
| Site: | Bellefonte |
| Issue date: | 06/05/1981 |
| From: | Mills L TENNESSEE VALLEY AUTHORITY |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8106290287 | |
| Download: ML20005A042 (2) | |
Text
_
c TENNESSEE VALLEY AUTHORlIY$ I?
CH ATTANCOG A. TENNESS EE 37 f.01 400 Chestnut Street Tower II. 7, 4
June 5, 1981
'd BLRD-50-438/81-35 4
e BLRD-50-439/81-38 s'
/
NL JUil 2 G E
- d Mr. James P. O'Reilly, Director u.s.ea gn a,, $, " " J Office of Inspection and Enforcement U.S. Nuclear Regulatory Cosmiission Region II - Suite 3100 cU IN 101 Marietta Street j 1.:'
Atlanta, Georgia 30303
Dear Mr. O'Reilly:
BE1.LEFONTE NUCLEAR PLANT UNITS 1 AND 2 - AUI
'ARY BUILDING FUEL HANDLING ZONE VElffILIATION FANS - BLRD-50-438/81-35, BLRD-50-439/81 FIRST I!ffERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector R. V. Crienjak on May 6,1981 in acccedance with 10 CFR 50.55(e) as NCR BLN BLP 8111. Enclosed is our first interim report. We expect to submit our next report by December 16, 1981.
If you have any questions concerning this matter, please get in touch with D. L. Lambert at FTS 857-2581.
Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Regulation and Safety Enclosure cet Mr. Victor Stello, Jr., Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulstory Commission Washington, DC 20S55 ts 10 6 29 () M I$
S
\\
ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 AUXILARY BUILDING FUEL HANDLING ZONE VENTILATION FANS BLRD-50-438/81-35, BLRD-50-439/81-38 10 CFR 50.55(e)
FIRST INTERIM REPORT Description of Deficionc?
The auxiliary building fuel handling zone ventilation supply air fans are mounted inside the conson zone air intake plenums on elevation 686' along with hot water heating coils and chilled water cooling coils. Since these fans provide ventilation and cooling of fuel handling areas, they are an enginJered safety feature (ESF). The heating and cooling coils are not qualified for seismic conditions since they were purchased nonseismic.
s Interim Action TVA is continuing its investigation of this deficiency.
l e
t i
_ _, _. _