Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20010A657 + (12:31:33, 21 December 2024)
- ML20010A656 + (12:31:37, 21 December 2024)
- IR 05000302/1981007 + (12:31:44, 21 December 2024)
- ML20010A651 + (12:31:46, 21 December 2024)
- ML20010A650 + (12:31:47, 21 December 2024)
- ML20010A649 + (12:31:48, 21 December 2024)
- ML20010A648 + (12:31:49, 21 December 2024)
- ML20010A646 + (12:31:50, 21 December 2024)
- ML20010A645 + (12:31:51, 21 December 2024)
- 05000237/LER-1981-043-03, /03L-0:on 810702,relay 590-123B Did Not Drop Out When Turbine First Stage Pressure Exceeded 45% of Normal During Routine Load Increase.Caused by Defective Pressure Switch.Pressure Switch Defective Wiring Removed & Replaced + (12:31:54, 21 December 2024)
- ML20010A642 + (12:32:01, 21 December 2024)
- 05000213/LER-1981-009-01, /01T-0:on 810723,during Assessment of SEP Topic II-1.B,determined That Low Population Zone Distance Not in Conformance w/10CFR100.11.Caused by Error in Interpretation. Design Basis Events Being re-evaluated + (12:32:02, 21 December 2024)
- 05000237/LER-1981-016-03, /03X-1:on 810408,noted That off-stream Liquid Effluent Monitor Had Not Been Functionally Tested on Monthly Basis.Caused by Deletion of Surveillance After Replacing on-stream Monitor w/off-stream Monitor + (12:32:07, 21 December 2024)
- 05000237/LER-1981-043, Forwards LER 81-043/03L-0 + (12:32:10, 21 December 2024)
- 05000321/LER-1981-075, Forwards LER 81-075/03L-0 + (12:32:12, 21 December 2024)
- ML20010A635 + (12:32:13, 21 December 2024)
- 05000237/LER-1981-016, Forwards LER 81-016/03X-1 + (12:32:24, 21 December 2024)
- 05000213/LER-1981-009, Forwards LER 81-009/01T-0 + (12:32:26, 21 December 2024)
- PNO-I-81-085, on 810805,circuit Breaker for Safety Injection Sys Motor Operated Valve Indicated Off Position.Indicating Lights for Boron Injection Tank Bypass Valve Were Out on Main & Redundant Control Boards + (12:32:28, 21 December 2024)
- 05000335/LER-1981-037-03, /03L-0:on 810705,measured Discard Containment Pressure Transmitter Alarmed Intermittently & Finally Failed.Cause Unknown.Transmitter Repaired by Replacing Oscillator & Force Motor + (12:32:30, 21 December 2024)
- ML20010A628 + (12:32:31, 21 December 2024)
- 05000220/LER-1981-032-03, /03L-0:on 810705,during Normal Operation,Automatic Reactor Scram Occurred on Low Reactor Water Level.Caused by Time Delay Due to Malfunctioning HPCI Controller.Controller Replaced & New Controller Tested Properly + (12:32:32, 21 December 2024)
- LD-81-040, Forwards Summary of 810622-25 SER Meeting in Windsor,Ct W/Mechanical Engineering Branch & Aps/Bechtel Re CESSAR-F, Chapter 3 + (12:32:34, 21 December 2024)
- ML20010A626 + (12:32:34, 21 December 2024)
- 05000335/LER-1981-037, Forwards LER 81-037/03L-0 + (12:32:36, 21 December 2024)
- 05000220/LER-1981-032, Forwards LER 81-032/03L-0 + (12:32:38, 21 December 2024)
- JAFP-81-0633, Advises That Revision of Instrument Maint Procedures Associated W/Ie Insp Rept 50-333/80-05 Cannot Be Completed by 810630.Revised Commitment Date Is 810815 + (12:32:40, 21 December 2024)
- ML20010A615 + (12:32:42, 21 December 2024)
- ML20010A614 + (12:32:43, 21 December 2024)
- 05000369/LER-1981-107-03, /03L-0:on 810704,auxiliary Feedwater Flow Gauges for Steam Generator C & D Declared Inoperable.On 810706, Plant Entered Mode 3 from Mode 4.Caused by External Source Tied Into Instrument Loops Causing Power Supply to Fail + (12:32:44, 21 December 2024)
- ML20010A612 + (12:32:45, 21 December 2024)
- ML20010A611 + (12:32:46, 21 December 2024)
- 05000318/LER-1981-032-03, /03L-0:on 810704,during Operator Insp,Operator Noted Water Dripping from Reactor Coolant Pump 22 Bay.Cause Unknown.Repair Will Be Initiated When Sys Becomes Available for Maint + (12:32:47, 21 December 2024)
- ML20010A608 + (12:32:48, 21 December 2024)
- 05000369/LER-1981-107, Forwards LER 81-107/03L-0.Detailed Event Analysis Encl + (12:32:50, 21 December 2024)
- IR 05000139/1981005 + (12:32:52, 21 December 2024)
- 05000331/LER-1981-030-03, /03L-0:on 810701,torus Atmosphere Sampling Line Isolation Valve SV-8108A Would Not Close During Testing. Caused by Rust in Mechanical Portion of Solenoid,Impeding Proper Operation.Solenoid Dismantled & Cleaned + (12:32:54, 21 December 2024)
- 05000318/LER-1981-032, Forwards LER 81-032/03L-0 + (12:32:56, 21 December 2024)
- ML20010A599 + (12:32:57, 21 December 2024)
- ML20010A597 + (12:32:58, 21 December 2024)
- 05000331/LER-1981-030, Forwards LER 81-030/03L-0 + (12:32:59, 21 December 2024)
- ML20010A594 + (12:33:01, 21 December 2024)
- ML20010A593 + (12:33:02, 21 December 2024)
- ML20010A592 + (12:33:03, 21 December 2024)
- 05000272/LER-1981-069-03, /03L-0:on 810703,while Adjusting Svc Water Flow Through Component Cooling Water Heat Exchanger,Operator Found Flow Control Valve 12SW127 Would Not Open.Caused by Marred Sealing Surface of Valve Tube Bundle.Bundle Cut Back + (12:33:04, 21 December 2024)
- ML20010A589 + (12:33:05, 21 December 2024)
- ML20010A587 + (12:33:06, 21 December 2024)
- ML20010A586 + (12:33:07, 21 December 2024)
- 05000237/LER-1981-044-03, /03L-0:on 810703,average Power Range Monitor 6 Failed to Initiate Rod Block During Normal Operation.Caused by Failure of K-2 Relay Which Prevented Proper Operation of Relay K5.Monitor Bypassed & Relay Replaced + (12:33:10, 21 December 2024)
- 05000272/LER-1981-069, Forwards LER 81-069/03L-0.Detailed Event Analysis Encl + (12:33:12, 21 December 2024)
- ML20010A581 + (12:33:14, 21 December 2024)