ML20010A587
| ML20010A587 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 07/16/1981 |
| From: | Brey H PUBLIC SERVICE CO. OF COLORADO |
| To: | Kuzmycz G Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20010A588 | List: |
| References | |
| FSV-24C, FSV-SYS-21, P-81-188, NUDOCS 8108110580 | |
| Download: ML20010A587 (1) | |
Text
7 Pubile ervlee company or celomeo
' 21 12015 East 46th Avenue, Suite 440; Deaver, CO 80239 Eh A2.a July 16, 1981 Q N J,h. '. / \\
/f U
'T Fort St. Vrain Unit No. 1 1
P-81188 gp AUG 101981** I4 jG V-3 YS-2 I
{ ~ u.a na gny'
~
(#3 V' 94G S
Mr. George Kuzmycz, Project Manager 4
e N
Special Projects Branch Division of Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Docket No. 50-267
Subject:
Primary Coolant Auxiliary System Loop Split Modification
Dear Mr. Kuzmycz:
Attached (30 copies) is the Safety Analysis Report for the Pri-mary Coolant Auxiliary System Loop Split Modification to be in-stalled at Fort St. Vrain. The design of the subject modifica-tion was presented to the NRC at the November 1,1979 and January 27, 1981 meetings held at the Fort St. Vrain Site. This Safety Analysis Report has been reviewed by the Fort St. Vrain Plant Operating Review Committee, and the cummittee has determined that the modification is not safety significant and that it does not represent an unreviewed safety question.
Installation of the subject modification is presently scheduled to begin in September 1981 and should be completed by the end of December 1981.
If you have any questions, please contact me.
Very truly yours, l
H. L. Brey, Manager Nuclear Engineering Division OOI HLB /FWT:pa
.s
///
8108110580 810716 PDR ADOCK 05000267-P PDR.
,