Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20011D478 + (09:39:08, 21 December 2024)
- ML20011D477 + (09:39:09, 21 December 2024)
- 3F1289-11, Forwards Rev 1 to 03-0920-1186, Pipe Rupture Analysis Criteria Outside Reactor Bldg Crystal River Unit 3. High Energy Line break-related Mods Remain on Schedule for Completion by End of Refuel 7 + (09:39:12, 21 December 2024)
- ML20011D471 + (09:39:14, 21 December 2024)
- ML20011D470 + (09:39:15, 21 December 2024)
- ML20011D468 + (09:39:20, 21 December 2024)
- ML20011D463 + (09:39:26, 21 December 2024)
- ML20011D462 + (09:39:27, 21 December 2024)
- PNO-I-89-097A, Augmented Insp Team Completed Onsite Event Review.Plant Reactor Protection Sys Sensors Did Not Experience Condenser Vacuum Below Scram Setpoint & Control Room Operators Responded Adequately + (09:39:29, 21 December 2024)
- PNO-IV-89-070, on 891214,contamination Discovered at Private Residence in Riverton,Wy.Addl Surveying Around House Indicated That Elevated Levels Were Consistently Found within 4 Ft of Such Structures.Doe Will Be Notified + (09:39:31, 21 December 2024)
- ML20011D458 + (09:39:36, 21 December 2024)
- PNO-IV-89-071, on 891216,problem Discovered W/Diesel Generator 11 Voltage Regulator While Performing 31-day Surveillance Test & Essential Chiller 12C Electrical Breaker Would Not Trip.Shutdown Initiated.Relay Replaced + (09:39:38, 21 December 2024)
- 05000289/LER-1989-003-02, :on 891129,rapid Reduction in Turbine Load Occurred Resulting in High Temp & Pressure in RCS & Reactor Trip.Caused by Loose Shield Wire on Input to Speed Error Circuit.Connections in EHC Cabinet Checked + (09:39:39, 21 December 2024)
- IR 05000482/1989028 + (09:39:42, 21 December 2024)
- ML20011D451 + (09:39:43, 21 December 2024)
- ML20011D450 + (09:39:44, 21 December 2024)
- ML20011D448 + (09:39:45, 21 December 2024)
- ML20011D446 + (09:39:46, 21 December 2024)
- ML20011D440 + (09:39:47, 21 December 2024)
- 05000482/LER-1989-020, :on 891117,determined That as-built Configuration of Housing for Both Trains of Containment Cooling Fan HXs Not Seismically Qualified to Withstand Sse. Addl Seismic Restraints Installed + (09:39:49, 21 December 2024)
- ML20011D437 + (09:39:53, 21 December 2024)
- ML20011D436 + (09:39:54, 21 December 2024)
- ML20011D435 + (09:39:55, 21 December 2024)
- ST-HL-AE-3216, Application for Amends to Licenses NPF-76 & NPF-80,revising Tech Specs 6.5.1.2 & 6.5.2.2 Re Plant Operations Review Committee & Nuclear Safety Review Board Composition + (09:39:55, 21 December 2024)
- BSEP-89-1095, Suppl to Part 21 Rept Re Completion of Replacement of Unit 1 CR205 Series Auxiliary Contacts w/CR305 Contacts.Initially Reported on 871030.Implementation of Five of Six Auxiliary Contacts Extended Until 900131 + (09:40:00, 21 December 2024)
- ML20011D431 + (09:40:02, 21 December 2024)
- NRC-89-0270, Forwards Endorsement 5 to Nelia Master Worker Certificates NW-42 & MW-90,per 10CFR140.15 + (09:40:03, 21 December 2024)
- ML20011D430 + (09:40:03, 21 December 2024)
- ML20011D427 + (09:40:04, 21 December 2024)
- ML20011D426 + (09:40:05, 21 December 2024)
- ML20011D425 + (09:40:06, 21 December 2024)
- ML20011D424 + (09:40:06, 21 December 2024)
- ELV-01065, Informs NRC That Qualified Life Based on Plant Location Different from That Presented at ASLB 860313 Hearing + (09:40:07, 21 December 2024)
- ML20011D423 + (09:40:07, 21 December 2024)
- ML20011D419 + (09:40:12, 21 December 2024)
- ML20011D418 + (09:40:13, 21 December 2024)
- ML20011D416 + (09:40:14, 21 December 2024)
- ML20011D417 + (09:40:14, 21 December 2024)
- AECM-89-0217, Forwards Response to Generic Ltr 89-10 Re safety-related motor-operated Valve Testing & surveillance.Motor-operated Valve Program Will Use Design Basis Verification & Industry Data to Establish Correct Switch Settings + (09:40:15, 21 December 2024)
- ML20011D414 + (09:40:17, 21 December 2024)
- ML20011D412 + (09:40:18, 21 December 2024)
- PY-CEI-NRR-1103, Proposed Tech Specs,Revising Section 4.0.2 & Bases Re Removal of 3.25 Limit on Extending Surveillance Intervals + (09:40:18, 21 December 2024)
- 05000344/LER-1989-027-01, Advises That Rev to LER 89-027-01 Delayed Until 900130 Due to Related Event & Expanding Scope of Investigation + (09:40:21, 21 December 2024)
- ML20011D407 + (09:40:22, 21 December 2024)
- ML20011D405 + (09:40:23, 21 December 2024)
- ML20011D406 + (09:40:23, 21 December 2024)
- LIC-89-1173, Forwards Application for Amend to License DPR-40,revising Limiting Conditions for Operation for Chemical & Vol Control Sys + (09:40:26, 21 December 2024)
- ML20011D401 + (09:40:28, 21 December 2024)
- ML20011D400 + (09:40:29, 21 December 2024)
- ML20011D395 + (09:40:36, 21 December 2024)
- ML20011D394 + (09:40:37, 21 December 2024)