Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20012B699 + (08:36:28, 21 December 2024)
- ML20012B698 + (08:36:29, 21 December 2024)
- ML20012B696 + (08:36:30, 21 December 2024)
- ML20012B694 + (08:36:31, 21 December 2024)
- ML20012B695 + (08:36:31, 21 December 2024)
- ML20012B693 + (08:36:32, 21 December 2024)
- ML20012B692 + (08:36:33, 21 December 2024)
- ML20012B691 + (08:36:34, 21 December 2024)
- ML20012B686 + (08:36:35, 21 December 2024)
- ML20012B684 + (08:36:36, 21 December 2024)
- ST-HL-AE-3394, Application for Amends to Licenses NPF-76 & NPF-80,changing Tech Spec 3.3.3.6 Re Pressurizer Level,Eliminating Requirement to Shutdown If One of Four Pressurizer Level post-accident Monitoring Channels Inoperable + (08:36:37, 21 December 2024)
- ML20012B679 + (08:36:39, 21 December 2024)
- ML20012B678 + (08:36:40, 21 December 2024)
- W3P90-0214, Responds to NRC Bulletin 88-011,Action 1.a Re Insp of Surge Line to Determine Discernible Distress or Structural Damage & Advises That Neither Surge Line Nor Affiliated Hardware Suffered Any Discernible Distress or Structural Damage + (08:36:41, 21 December 2024)
- ML20012B672 + (08:36:43, 21 December 2024)
- ML20012B671 + (08:36:45, 21 December 2024)
- ML20012B670 + (08:36:45, 21 December 2024)
- ML20012B668 + (08:36:46, 21 December 2024)
- RBG-32424, Discusses Evaluation of Particulate Sampling & Containment/ Drywell Header Where Samples Taken,Per Licensee 891017 Supplemental Response to Generic Ltr 88-14.Maint Work Orders Initiated to Inspect & Replace Filtration Media for CRD + (08:36:47, 21 December 2024)
- ML20012B667 + (08:36:47, 21 December 2024)
- B13466, Forwards Reg Guide 1.75 Compliance Review,Per NRC 900122 SER Committing Util to Submit Review in Support of Electrical Design of New Switchgear Bldg at Plant + (08:36:50, 21 December 2024)
- ML20012B657 + (08:36:52, 21 December 2024)
- ML20012B661 + (08:36:52, 21 December 2024)
- ML20012B654 + (08:36:54, 21 December 2024)
- ML20012B656 + (08:36:54, 21 December 2024)
- ML20012B653 + (08:36:56, 21 December 2024)
- ML20012B651 + (08:36:57, 21 December 2024)
- 05000374/LER-1990-002-06, :on 900209,Operating Surveillance LOS-TG-W1 Determined to Have Exceeded Required Testing Interval,Per Tech Spec 3/4.7.10.Caused by Personnel Error.Personnel Counseled & Ref Procedures Will Be Revised + (08:36:58, 21 December 2024)
- 05000445/LER-1990-001, :on 900209,reactor Protection Sys Actuation Occurred Due to Spike on Range Channel.Appropriate Source Range Procedures Revised to Require Insertion of Flux Doubling Signal Block Prior to Withdrawal + (08:37:00, 21 December 2024)
- ML20012B646 + (08:37:02, 21 December 2024)
- ML20012B647 + (08:37:02, 21 December 2024)
- ML20012B645 + (08:37:03, 21 December 2024)
- 05000339/LER-1990-001-02, :on 900215,inadvertent Partial Train a ESF Actuation of Containment Depressurization Sys Occurred. Caused by Human Error.Evaluation to Be Performed to Determine If Test Points Can Be Moved + (08:37:04, 21 December 2024)
- ML20012B641 + (08:37:06, 21 December 2024)
- ML20012B639 + (08:37:07, 21 December 2024)
- ML20012B640 + (08:37:07, 21 December 2024)
- ML20012B637 + (08:37:08, 21 December 2024)
- 3F0390-03, Forwards Rev 1 to Tech Spec Tables 3-2 & 3-3 Re Min Margin to Allowable for Various Components & Welds in Facility Racks,As Followup to Tech Spec Change Request 175, Spent Fuel Pool Storage Capacity + (08:37:12, 21 December 2024)
- ML20012B632 + (08:37:14, 21 December 2024)
- ML20012B631 + (08:37:15, 21 December 2024)
- ML20012B628 + (08:37:17, 21 December 2024)
- ML20012B627 + (08:37:17, 21 December 2024)
- ML20012B625 + (08:37:18, 21 December 2024)
- ML20012B621 + (08:37:19, 21 December 2024)
- ML20012B619 + (08:37:20, 21 December 2024)
- BVY-90-026, Provides Suppl Info to Clarify Position Re Leakage Detection & Conformance W/Position C of Reg Guide 1.45.Util Concludes That Combination of Existing Tech Specs & Administrative Controls Fully Comply W/Intent of Staff Position on Leakage + (08:37:21, 21 December 2024)
- BVY-90-027, Informs of Schedular Changes Made W/Regard to Plant Licensed Operator Requalification Training Program + (08:37:22, 21 December 2024)
- ML20012B611 + (08:37:24, 21 December 2024)
- ML20012B607 + (08:37:26, 21 December 2024)
- 05000271/LER-1990-001, :on 900209,primary Containment Isolation Sys Group III Isolation & Subsequent Standby Gas Treatment Sys Initiation Occurred.Caused by Personnel Error.Isolation Reset.Personnel Counseled on Proper Procedures + (08:37:27, 21 December 2024)
- NRC-90-0054, Responds to NRC 900212 Order Modifying License & Notice of Violation.Corrective Actions:Former Director of Nuclear Security No Longer Works for Util & Extensive Actions Taken to Improve Communications W/Nrc + (08:37:28, 21 December 2024)