Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20024E660 + (04:19:40, 21 December 2024)
- RBG-25-638, Final Deficiency Rept DR-101 Re Undersized Fillet Welds on Nf Pipe Supports.Initially Reported on 830223.Welds Determined to Be of Adequate Size to Sustain Loads But Will Be Corrected to Meet ASME Size Requirements + (04:19:41, 21 December 2024)
- ML20024E655 + (04:19:43, 21 December 2024)
- ML20024E657 + (04:19:43, 21 December 2024)
- ML20024E651 + (04:19:44, 21 December 2024)
- A03413, Submits Addl Info Re Steam Generator Tube Rupture Event Analyzed in Support of Cycle 6 Operation,Per 830725 Request. Current Steam Generator Tube Rupture Analysis Adequate to Support Cycle 6 Operation + (04:19:45, 21 December 2024)
- TAC:49798 + (04:19:45, 21 December 2024)
- ML20024E649 + (04:19:47, 21 December 2024)
- ML20024E647 + (04:19:48, 21 December 2024)
- IR 05000498/1983011 + (04:19:53, 21 December 2024)
- ML20024E644 + (04:19:55, 21 December 2024)
- 1CAN012002, License Amendment Request: Revise Loss of Voltage Relay Allowable Values + (04:19:56, 21 December 2024)
- ML20024E642 + (04:19:56, 21 December 2024)
- ML20024E635 + (04:19:58, 21 December 2024)
- 05000220/LER-1983-017-03, /03L-0:on 830707,HPCI Feedwater Booster Pumps 11 & 13 Taken Out to Svc to Inspect Impellers Due to Similar Problem on nonsafety-related Pump.Parts of Strainer Found in Pumps But Pumps Undamaged + (04:19:59, 21 December 2024)
- ML20024E632 + (04:20:00, 21 December 2024)
- ML20024E630 + (04:20:04, 21 December 2024)
- ML20024E628 + (04:20:05, 21 December 2024)
- 05000309/LER-1983-028-01, /01T-0:during Review of Feedwater Trip Sys Design, Util Determined Loss of Station Battery 3 During Major Steam Line Break Accident Would Prevent Isolation of Feedwater to Steam Generator 3.Defect to Be Corrected + (04:20:09, 21 December 2024)
- BECO-83-213, Informs That Payment Submitted to Cover Filing Fee for Proposed Tech Spec Change 83-05 Re Power Flow Map + (04:20:10, 21 December 2024)
- IR 05000264/1983002 + (04:20:12, 21 December 2024)
- ML20024E618 + (04:20:14, 21 December 2024)
- ML20024E616 + (04:20:16, 21 December 2024)
- ML20024E617 + (04:20:16, 21 December 2024)
- ML20024E615 + (04:20:17, 21 December 2024)
- ML20024E613 + (04:20:18, 21 December 2024)
- ML20024E612 + (04:20:19, 21 December 2024)
- ML20024E610 + (04:20:20, 21 December 2024)
- ML20024E608 + (04:20:21, 21 December 2024)
- NUREG-0978, Informs That CRGR Meeting 44 on 830803 Rescheduled for 830810 in Bethesda,Md.Proposed NUREG-0978 Re Generic Issue B-10, Behavior of BWR Mark III Containments, Will Be Discussed + (04:20:22, 21 December 2024)
- ML20024E606 + (04:20:23, 21 December 2024)
- ML20024E605 + (04:20:24, 21 December 2024)
- ML20024E604 + (04:20:25, 21 December 2024)
- ML20024E603 + (04:20:26, 21 December 2024)
- NUREG/CR-3300, Informs That Results of Sandia & BNL Probabilistic Safety Study Review Contained in Draft NUREG/CR-3300,Vols I & Ii. W/O Encl + (04:20:27, 21 December 2024)
- ML20024E601 + (04:20:29, 21 December 2024)
- ML20024E599 + (04:20:30, 21 December 2024)
- CNRO-2020-00006, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 2 + (04:20:31, 21 December 2024)
- ML20024E596 + (04:20:31, 21 December 2024)
- ML20024E595 + (04:20:33, 21 December 2024)
- ML20024E593 + (04:20:33, 21 December 2024)
- ML20024E592 + (04:20:34, 21 December 2024)
- ML20024E590 + (04:20:35, 21 December 2024)
- ML20024E586 + (04:20:37, 21 December 2024)
- ML20024E585 + (04:20:38, 21 December 2024)
- ML20024E583 + (04:20:39, 21 December 2024)
- ML20024E582 + (04:20:40, 21 December 2024)
- ML20024E580 + (04:20:41, 21 December 2024)
- ML20024E577 + (04:20:44, 21 December 2024)
- ML20024E576 + (04:20:47, 21 December 2024)
- RBG-15-640, Advises That,Due to Consultant Assistance in Control of Heavy Loads Evaluation,Phase 1 Completion Rescheduled for Feb 1984 & Phase 2 for Oct 1984 + (04:20:49, 21 December 2024)