Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20027B213 + (02:53:49, 21 December 2024)
- 05000416/LER-1982-036-03, /03L-0:on 820803,zone 1-23 Smoke Detector in Upper Cable Spreading Room Deactivated Via Security Computer.Caused by Spurious Alarm W/O Smoke or Fumes.Hourly Fire Watch Established.Smoke Detector Cleaned & Reset + (02:53:51, 21 December 2024)
- ML20027B210 + (02:53:52, 21 December 2024)
- ML20027B208 + (02:53:53, 21 December 2024)
- ML20027B207 + (02:53:53, 21 December 2024)
- 05000416/LER-1982-036, Forwards LER 82-036/03L-0 + (02:53:55, 21 December 2024)
- IR 05000346/1982022 + (02:53:58, 21 December 2024)
- RBG-13-277, Interim Deficiency Rept Re Linear Indications Found in RHR Sys HX Supports Supplied by Teledyne Brown.Initially Reported on 820809.Investigation Continuing.Next Rept Will Be Provided by 821020 + (02:53:59, 21 December 2024)
- IR 05000416/1982062 + (02:54:01, 21 December 2024)
- ML20027B196 + (02:54:03, 21 December 2024)
- 05000278/LER-1982-013-03, /03L-0:on 820807,torus Narrow Range Level Indicator Failed Downscale.Caused by Failure of Linkage on Foxboro Level Transmitter.Linkage Replaced & Transmitter Recalibr + (02:54:04, 21 December 2024)
- ML20027B194 + (02:54:05, 21 December 2024)
- 05000373/LER-1982-065-01, /01T-0:on 820722,util Notified Region 3 & NRR of Potential 10CFR50.55e Assessment Involving post-LOCA Chugging Phenomena W/Suppression Chamber to Drywell Vacuum Breakers.Written Response Will Be Issued + (02:54:06, 21 December 2024)
- ML20027B190 + (02:54:08, 21 December 2024)
- 05000278/LER-1982-014-03, /03L-0:on 820811,loss of Channels 1 & 2 Required for Indication of Drywell Temp Occured During Surveillance Testing.Caused by Failed Detector Cards Due to Defective Power Supply for Indicator.Power Supply & Cards Replaced + (02:54:09, 21 December 2024)
- 05000373/LER-1982-065, Forwards LER 82-065/01T-0 + (02:54:12, 21 December 2024)
- IR 05000289/1982010 + (02:54:14, 21 December 2024)
- ML20027B181 + (02:54:17, 21 December 2024)
- 05000280/LER-1982-090-01, /01T-0:on 820826,during Sampling of Gas Stripper Surge Tank Gaseous Effluent,High Spike Observed on vent-vent Gaseous Monitor.Caused by Gas Leak Through Damaged Quick Disconnect on Vessel.Disconnects Will Be Replaced + (02:54:19, 21 December 2024)
- 05000311/LER-1982-079-03, /03L-0:on 820811,control Room Operator Determined by Containment Sump Pump Run Times,Unidentified Leakage of Greater than 1 Gpm.Caused by Valve 24GBS & Steam Generator Steam Flow Trap Leaking + (02:54:21, 21 December 2024)
- 05000272/LER-1982-059-03, /03L-0:on 820809,source Range Neutron Flux Channel 1N31 Indication Failed Low.Channel Declared Inoperable Since Reactor Trip Breakers Open.Caused by Failure of High Voltage Power Supply.Power Supply Replaced + (02:54:22, 21 December 2024)
- 05000277/LER-1982-022-03, /03L-0:on 820820,main Control Room Intake Air Radiation Monitor B Failed Downscale.Caused by Defective Geiger-Mueller tube,194X927GO11.Tube & Associated Electronics Replaced.Detector Recalibr + (02:54:27, 21 December 2024)
- AECM-82-380, Third Interim Deficiency Rept Re Div II Diesel Generator Trip.Initially Reported on 820322.Generator & Rear Crankcase Cover Bolts Replaced.Final Rept Expected by 821030 + (02:54:28, 21 December 2024)
- ML20027B173 + (02:54:30, 21 December 2024)
- 05000280/LER-1982-090, Forwards LER 82-090/01T-0 + (02:54:32, 21 December 2024)
- RBG-13-276, Interim Rept Re Cracking & Spalling of Surface Concrete Around Penetrations in Drywell Wall.Initially Reported on 820806.Investigation Incomplete.Next Rept to Be Submitted by 821007 + (02:54:33, 21 December 2024)
- ML20027B167 + (02:54:35, 21 December 2024)
- 05000311/LER-1982-079, Forwards LER 82-079/03L-0.Detailed Event Analysis Encl + (02:54:36, 21 December 2024)
- 05000272/LER-1982-059, Forwards LER 82-059/03L-0.Detailed Event Analysis Encl + (02:54:38, 21 December 2024)
- 05000338/LER-1982-056-03, /03L-0:on 820808,insp of 1A Reactor Coolant Pump Impeller End of Pump & Pump Casing Revealed Seven Failed Socket Head Cap Screws to Diffuser Adapter.Cause Under Investigation.Screws Replaced + (02:54:39, 21 December 2024)
- ML20027B161 + (02:54:40, 21 December 2024)
- RBG-13-275, Interim Deficiency Rept Re Valen Engineering Ltd Valve Stud Matl Not Recognized for Use Under ASME Section 3.Initially Reported on 820629.Investigation Incomplete.Next Rept to Be Submitted on 821014 + (02:54:41, 21 December 2024)
- 05000338/LER-1982-056, Forwards LER 82-056/03L-0 + (02:54:46, 21 December 2024)
- ML20027B156 + (02:54:47, 21 December 2024)
- ML20027B154 + (02:54:54, 21 December 2024)
- ML20027B153 + (02:54:55, 21 December 2024)
- 05000302/LER-1982-053-03, /03L-0:on 820808,outer Door of Reactor Bldg Personnel Hatch Reported Inoperable.Caused by Failure of Cam Roller Bearings in Mechanical Interlock.Bearings Replaced.Mod to Eliminate Problem Completed on 820831 + (02:54:56, 21 December 2024)
- ML20027B149 + (02:55:00, 21 December 2024)
- ML20027B148 + (02:55:01, 21 December 2024)
- 05000302/LER-1982-053, Forwards LER 82-053/03L-0 + (02:55:02, 21 December 2024)
- ML20027B145 + (02:55:03, 21 December 2024)
- ML20027B144 + (02:55:03, 21 December 2024)
- 05000335/LER-1982-034-03, /03L-0:on 820804,refueling Water Tank Level Transmitter LT-07-2B Failed High.Caused by Leakage Past Diaphragm.Transmitter Dismantled,Reassembled & Tested Satisfactorily + (02:55:04, 21 December 2024)
- 05000272/LER-1982-060-03, /03L-0:on 820807,control Operator Attempting to Perform Containment Pressure Relief,Discovered Valve 1VC5 Would Not Open from Control Console.Caused by Failure of Control Air Solenoid Valve on Actuator.Solenoid Replaced + (02:55:06, 21 December 2024)
- ML20027B141 + (02:55:07, 21 December 2024)
- ML20027B140 + (02:55:08, 21 December 2024)
- IR 05000321/1982023 + (02:55:10, 21 December 2024)
- 05000335/LER-1982-034, Forwards LER 82-034/03L-0 + (02:55:12, 21 December 2024)
- 05000325/LER-1982-070-03, /03L-0:on 820809,review Revealed That Operability Surveillance of Fire Hose Stations Required Once Per 18 Months Not Provided for in Fire Protection Sys Surveillance Procedures.Caused by Personnel Oversight + (02:55:13, 21 December 2024)
- 05000272/LER-1982-060, Forwards LER 82-060/03L-0.Detailed Event Analysis Encl + (02:55:15, 21 December 2024)
- ML20027B131 + (02:55:17, 21 December 2024)