Forwards IE Insp Repts 50-321/82-23 & 50-366/82-21 on 820721-23.No Noncompliance Noted
ML20027B131
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/18/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20027B132 List:
References
NUDOCS 8209160463
Download: ML20027B131 (2)


See also: IR 05000321/1982023

Text

August 18, 1982

Georgia Power Company

ATTN:

Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

/

Subject

Report Nos. 50-321/82-23 and 50-366/82-21

This refers to the routine safety inspection conducted by Mr. B. R. Crowley

of this office on July 21-23, 1982, of activities authorized by NRC Operating

License No. DPR-57 and License No. NPF-5 for the Hatch facility and to the

discussion of our findings held with Mr. T. V. Green, Assistant Plant Manager,

of your staff at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the r.nclosure wfll

be placed in the NRC's Public Document Room unless you notify t' is office, ty

telephone, within ten days of the date of this letter and submit ,<ritten appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

(original signed by HCDance)

H. C. Dance, Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure:

See Page 2

8209160463 820818

PDR ADOCK 05000321

.Ib O(

0

,

.eorgia Power Company

2

August 18, 1982

Enclosure:

Inspection Report Nos. 50-321/82-23

and 50-366/82-21

cc w/ enc 1:

J. T. Beckham, Vice Presider.t and

General Manager-Nuclear Ger.eration

H. C. Nix, Plant Manager

C. E. Belflower, Site QA Supervisor

bcc w/ encl:

NRC Resident Inspector

Hugh S. Jordan, Executive Secretary

Document Management Branch

State of Georgia

RII

~

$

SJg

RII

RII

60

'

\\l

cl/l0

j

BRCrowley:ht

NEco etnos

AHHerdt

JRodge

HCDance

6/\\\\/82

R/ /82

8/ 1/82

SQ/82

8/f/82

/

\\