ML20027B145

From kanterella
Jump to navigation Jump to search
Third Interim Deficiency Rept Re Omissions to Auxiliary Feedwater Pump Drawings.Initially Reported on 820225.Pump Vents,Drains & Turbine Bearing Cooling Water Piping Designed & Incorporated on Design Criteria Diagram
ML20027B145
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 09/07/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8209160476
Download: ML20027B145 (2)


Text

r-A' TENNESSEE VALLEY AUTHORITY CHATTANOOGA, TENNESSEE 374ol 400 Chestnut Street Tower II September 7, 1982 BLRD-50-438/82-20 BLRD-50-439/82-18 U.S. Nuclear Regulatory Commission Region II Attn:

Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 cu

Dear Mr. O'Reilly:

ro g-.

.n

-w BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - OMISSIONS TO AUXILIARY FEEDWQER y PUMP DRAWINGS - BLRD-50-438/82-20, BLRD-50-439/82 THIRD INTERIM -

yo REPORT J3 d

6M The subject deficiency was initially reported to NRC-0IE Inspector co n9 W'7 R. V. Crlenjak on February 25, 1982 in accordance with 10 CFR 50.55(e) as NCR BLN BLP 8207. This was followed by our interim reports dated

.c.

March 25 and July 20, 1982. Enclosed is our third interim report. We0 s**

expect to submit our next report by December 15, 1982.

If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY k

L. M. Mills, Manager Nuclear Licensing Enclosure cc:

Mr. Richard C. DeYoung, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 vFHCIAL COPY

~

'_ w -

8209160476 820907 PDR ADOCK 05000438 f g Qf PDR 4

S An Equal Ooportunity Employe-

a ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 OMISSIONS TO AUXILIARY FEEDWATER PUMP DRAWINGS NCR BLN BLP 8207

~

BLRD-50-438/82-20, BLRD-50-439/82-18 10 CFR 50.55(e)

THIRD INTERIM REPORT Description of Deficiency The auxiliary feedwater ( AFW) pumps were purchased without vent, drain, and turbine bearing cooling water interconnecting piping.

Connections to the pumps and turbines were supplied by the respective manufacturer with the understanding that TVA would provide the necessary piping design drawings and materials to meet TVA's and the pump specifications. The vents, drains, and turbine bearing cooling water interconnecting piping were not designed.

Interim Progress The auxiliary feedwater pump vents, drains, and turbine bearing cooling water interconnecting piping have been designed and incorporated on design criteria diagram (3BWO618-CA-01) and piping design drawing (3BWO418-CA-04, -08, and -12).

The turbine bearing cooling piping requires rigorous analysis, and therefore the design has been placed on hold until this analysis is issued.

i' i

4 1

l 1

~

.