ML20027B161
| ML20027B161 | |
| Person / Time | |
|---|---|
| Site: | Bellefonte |
| Issue date: | 09/07/1982 |
| From: | Mills L TENNESSEE VALLEY AUTHORITY |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8209160494 | |
| Download: ML20027B161 (2) | |
Text
TENNESSEE VALLEY AUTHORITY r
CHATTANOOGA, TENNESSEE 374o1
.400 Chestnut Street Tower II September 7, 1982 BLRD-50-438/81-65 BLRD-50-439/81-63 U.S. Nuclear Regulatory Commission Region II Attn:
Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - TURBINE DRIVEN AUXILIARY FEEDWATER PUMP ROOM TEMPERATURE - BLRD-50-438/81-65, BLRD-50-439/81 THIRD N M
INTERIM REPORT M
N-o bZ The subject deficiency was initially reported to NRC-0IE Inspector C
I$
R. V. Crlenjak on October 6,1981 in accordance with 10 CFR 50.55(e)
?n as NCR BLN BLP 8124. This was followed by our interim reports dated 3:n oin November 3, 1981 and April 28, 1982. Enclosed is our third interim Co m2 report. We expect to submit our next report by June 27, 1983
',iS
.a.
a --
If you have any questions concerning this matter, please get in touch" b'
r with R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY l
L. M. Mills, Fanager Nuclear Licensing l
Enclosure
(
cc:
Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Mashington, D.C.
20555 i
f'0FF}g1hMLO '#
8209160494 820907 PDR ADOCK 05000438 4
S PDR
/ S Al An Equal Opportunity Employer
ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 TURBINE DRIVEN AUXILIARY FEEDWATER PUMP ROOM TEMPERATURE NCR BLN BLP 8124 BLRD-50-438/81-65, BLRD-50-4;9/81-63 10 CFR 50.55(e)
THIRD INTERIM REPORT Description of Deficiency Additional piping was routed through the turbine-driven auxiliary feedwater pump room. During extended periods of operating the pump, the turbing-driven auxiliary feedwater pump room maximum upset temperature of 120 F, as specified in TVA environmental design criteria N4-50-D749, may be exceeded based on the calculated room cooling load.
Interim Progress TVA has initiated engineering change gotice (ECN) 1435 to alleviate the problem of possibly exceeding the 120 F design maximum upset te=perature in the turbine-driven auxiliary feedwater pump room. TVA drawings have been revised and issued showing ventilation fans that will be installed by this engineering change to provide the necessary cooling. TVA is still awaiting receipt of information from the fan vendor that will be incorporated on the pertinent electrical drawings.
l i
l l
I j
e B
1
-