Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20029C774 + (21:49:41, 20 December 2024)
- 05000295/LER-1994-004-06, :on 930326,defeated Safeguards Actuation Signal Occurred Due to Lifted Leads on Two Motor Operated Valves. Caused by Personnel Error.Individuals Involved Counselled + (21:49:43, 20 December 2024)
- ML20029C770 + (21:49:44, 20 December 2024)
- ML20029C769 + (21:49:45, 20 December 2024)
- BSEP-94-0152, Responds to NRC Re Violations Noted in Insp Repts 50-324/94-04 & 50-325/94-02.Corrective Action:Temporary Rev Was Made to Periodic Test 4.1.1 to Ensure CAC-V216 Would Isolate on Group 6 Isolation Signal + (21:49:50, 20 December 2024)
- ML20029C762 + (21:49:52, 20 December 2024)
- ML20029C765 + (21:49:52, 20 December 2024)
- ML20029C761 + (21:49:53, 20 December 2024)
- ML20029C757 + (21:49:54, 20 December 2024)
- ML20029C756 + (21:49:55, 20 December 2024)
- ML20029C755 + (21:49:56, 20 December 2024)
- NG-94-1391, Responds to NRC Bulletin 93-002,suppl 1, Debris Plugging of Emergency Core Cooling Suction Strainers + (21:49:57, 20 December 2024)
- ML20029C751 + (21:49:58, 20 December 2024)
- 05000354/LER-1994-001, :on 940305,ESF Actuation/Isolation & Loss of Shutdown Cooling Occurred.Caused by Personnel Error. Technician Counseled + (21:50:00, 20 December 2024)
- ML20029C749 + (21:50:01, 20 December 2024)
- ML20029C746 + (21:50:04, 20 December 2024)
- NRC-94-0035, Responds to NRC Re Violations Noted in Insp Rept 50-341/93-02.Corrective Actions:Existing Sys Realigned to Allow Backflushing of Clogged Strainers + (21:50:05, 20 December 2024)
- ML20029C744 + (21:50:05, 20 December 2024)
- L-94-019, Forwards Rev 8 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) + (21:50:08, 20 December 2024)
- GO2-94-082, Forwards Amend to Rev 11 to Security Training & Qualification Plan.Amend Withheld + (21:50:09, 20 December 2024)
- ML20029C739 + (21:50:12, 20 December 2024)
- ML20029C736 + (21:50:13, 20 December 2024)
- ML20029C738 + (21:50:13, 20 December 2024)
- ML20029C735 + (21:50:15, 20 December 2024)
- ML20029C734 + (21:50:19, 20 December 2024)
- ML20029C733 + (21:50:20, 20 December 2024)
- ML20029C731 + (21:50:24, 20 December 2024)
- ML20029C730 + (21:50:25, 20 December 2024)
- ML20029C729 + (21:50:26, 20 December 2024)
- PY-CEI-NRR-1791, Responds to NRC Bulletin 93-002,Suppl 1, Debris Plugging of Emergency Core Cooling Suction Strainers + (21:50:26, 20 December 2024)
- ML20029C727 + (21:50:28, 20 December 2024)
- TAC:M86075 + (21:50:29, 20 December 2024)
- ML20029C725 + (21:50:29, 20 December 2024)
- 05000245/LER-1994-011, :on 940322,RV Low Level Scram Setpoint & Low Level ECCS Setpoint Were Potentially Nonconservative.Caused by Failure of Plant Design.Setpoint Change Performed for Both Low Level Scram Setpoints + (21:50:31, 20 December 2024)
- ML20029C722 + (21:50:32, 20 December 2024)
- 05000298/LER-1992-020, :on 920130,containment Level Instruments Were Removed & re-installed Without Being Declared Inoperable. Caused by Personnel Failure to Follow Procedures.Operators Retrained + (21:50:33, 20 December 2024)
- ML20029C718 + (21:50:35, 20 December 2024)
- ML20029C720 + (21:50:35, 20 December 2024)
- RA-93-022, Cy Containment Isolation Failure Probability + (21:50:37, 20 December 2024)
- B14801, Provides Response to NRC Request for Addl Info Re Individual Plant Exam,Per GL 88-20.Rev 0 to CY-PRA-93-022 Rept Encl + (21:50:39, 20 December 2024)
- ML20029C714 + (21:50:41, 20 December 2024)
- ML20029C712 + (21:50:42, 20 December 2024)
- SNRC-2165, Submits Technical Info on Biological Shield Wall Blocks to Be Surveyed + (21:50:43, 20 December 2024)
- 05000295/LER-1994-003-07, :on 940323,discovered That Sensing Lines on All of Safety Related Pressure Transmitters Were Capped Off. Cause Was Management/Qa Deficiency.Corrective Action: Removing Pipe Caps & Labeling Units + (21:50:46, 20 December 2024)
- ML20029C708 + (21:50:47, 20 December 2024)
- ML20029C707 + (21:50:48, 20 December 2024)
- 05000263/LER-1994-001-01, :on 940323,missed Surveillance on SRV Low-Low Set Logic.Caused by Incorrect Surveillance Procedure Prerequisite.Corrective Action:Removed Incorrect Prerequisites,Trained on Procedure Review + (21:50:50, 20 December 2024)
- 05000213/LER-1994-008, :on 940324,auxiliary Feedwater Hydraulic Control Sys Setpoints Found Low.Cause Under Investigation. Switches Recalibrated & Monitoring Increased + (21:50:52, 20 December 2024)
- 05000213/LER-1994-009, :on 940328,automatic Reactor Trip Occurred While Performing Nop.Caused by Equipment Failure.Corrective Action:Procedure Rev & Repair/Reinstallment of Breaker 309-1A + (21:50:55, 20 December 2024)
- 05000321/LER-1994-002-03, :on 940325,personnel Error Resulted in ESF Actuations.Personnel Counseled & Trained & EDG Control Circuit Wire Repaired + (21:50:57, 20 December 2024)
- ML20029C696 + (21:50:58, 20 December 2024)