Forwards TS Change Request 215,deleting Audit Program Frequency Requirements from TS 6.5.3 & Utilize Operational QA Plan as Controlling Document
ML20029C751
Person / Time
Site: Oyster Creek
Issue date: 04/15/1994
From: J. J. Barton
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20029C752 List:
References
C321-94-2042, NUDOCS 9404290033
Download: ML20029C751 (2)


Text

[F l

.)

y, GPU Nuclear Corporation 3 0. Nuclear

": ?n:

88 Forked River, New Jersey 08731-0388 609 971-4000 Writer's Direct Dial Number:

C321-94-2042 April 15, 1994 U. S. Nuclear Regulatory Commission Att: Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

Oyster Creek Nuclear Generating Station (OCNGS)

Docket No. 50-219 Technical Specification Change Request (TSCR) No. 215 -

QA Audit Frequencies In accordance with 10 CFR 50.4(b)(1), enclosed is Technical Specification Change Request (TSCR) No. 215.

Also enclosed is a Certificate of Service for this request certifying service to the chief executives of the township and county in which the facility is

-located, as well as the designated official of the State of New Jersey Bureau-of Nuclear Engineering.

The purpose of this TSCR is to request the deletion of the audit program frequency requirements from Technical Specification 6.5.3 and to utilize the Operational Quality Assurance (0QA) Plan as the controlling document. This change will introduce more flexibility into audit scheduling to consider plant activities and performance.

In addition, a minor editorial-change'has been incorporated into this TSCR correcting a reference in TS 6.5.1.14 in response to a finding in the Operational Safety Team Inspection report of December 23,1993.

The 0QA Plan is part of GPU Nuclear's' Safety Analysis Report (SAR) and subject-totheprovisionsof10CFR50.54(a). A formal review of the changes was conducted considering the requirements of 10 CFR 50.54(a). The review l

concluded that measures being introduced enhance the overall program.

% f>: U'I 9404290033 940415 PDR ADDCK 05000219 hg P

PDR

'=

GPU Nuclear Corporation is a subsidiary of General Public Utilities Corporation v-

C321-94-2042 Page 2 However, in a quantitative sense, the changes represent a reduction in committment.

Therefore, the changes to the 0QA Plan are being submitted with this TSCR for review and approval. The 10 CFR 50.54(a) analysis and the revised 0QA Plan pages arc attached.

Furthermore, since the 0QA Plan applies equally to Three Mile Island Nuclear Station, a TSCR to Operating License No.-

DPR-50 is being submitted concurrently.

If the amendments are approved, GPU Nuclear will submit similar changes to the THI Unit 2 Technical Specifications and the PDMS QA Plan.

GPU Nuclear considers this TSCR to be a Cost Beneficial Licensing Action (CBLA).

It is estimated that implementation of this change could result in a savings of $860,000 for the duration of the current license.

Pursuant to 10 CFR 50.91(a)(1), enclosed is an analysis applying the standards in 10 CFR 50.92 to make a determination of no significant hazards consideration, Sincerely,

/

f\\ O M

fv' J

J. darton i

resident and Director, yster Creek JJB\\DK(plp

'l Attachments cc: Administrator, Region 1 Oyster Creek NRC Project Manager Sr. Resident Inspector THI-l Senior Project Manager i