MONTHYEARML20202H8821997-12-0303 December 1997 Final Response to FOIA Request for Documents.Records in App a Being Made Available in PDR & Encl IA-97-428, Final Response to FOIA Request for Documents.Records in App a Being Made Available in PDR & Encl1997-12-0303 December 1997 Final Response to FOIA Request for Documents.Records in App a Being Made Available in PDR & Encl ML20202H8981997-10-27027 October 1997 FOIA Request for Listed Pages from Section 19 of General Electric ABWR SSAR ML20210J3591997-08-11011 August 1997 Transmits Revised Fda for Us ABWR Std Design,Per App 0 of 10CFR52.FDA Allows ABWR Std Design to Be Ref in Application for Const Permit or Operating License,Per 10CFR50 or in Application for Combined License,Per 10CFR52 ML20149J7101997-07-23023 July 1997 Requests That R Simard Be Removed from Service Lists & R Bell Be Added to Svc Lists,Due to Recent NEI Reorganization NUREG-1503, Forwards Suppl 1 to NUREG-1503, FSER Re Certification of ABWR, Provided for Info & Use.Suppl Documents NRC Review of ABWR Design Since Issuance of FSER in Jul 19941997-06-19019 June 1997 Forwards Suppl 1 to NUREG-1503, FSER Re Certification of ABWR, Provided for Info & Use.Suppl Documents NRC Review of ABWR Design Since Issuance of FSER in Jul 1994 ML20148A5701997-05-0202 May 1997 Forwards Affirmation Ltr Complying W/Filing Requirements of 10CFR52.45(d) & 50.30(b) Re Application for Review of ABWR Design Control Document,Rev 4 for Design Certification ML20196F8771997-03-28028 March 1997 Forwards Licensee ABWR Design Control Document,Rev 4 to Incorporate Changes Needed to Reflect Commission SRM Decisions & Subsequent Discussion W/Staff & to Support Ssar ML20137G3161997-03-28028 March 1997 Forwards Rev 4 to GEs ABWR Design Control Document to Incorporate Changes That Are Needed to Reflect Commission SRM Decisions & Subsequent Discussions W/Staff ML20147C1041997-01-23023 January 1997 Responds to Requesting Opportunity to Review Design Certification Rule for ABWR Before Sent to Ofc of Fr for Publication.Request Denied ML20133A9791996-12-18018 December 1996 Approves Rules Certifying Asea Brown Boveri-Combustion Engineering Sys 80+ & General Electric Nuclear Energy Advanced Boiling Water Reactor ML20133B0191996-12-18018 December 1996 Informs of Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energys Advanced BWR ML20133A9901996-12-18018 December 1996 Informs That NRC Has Approved Asea Brown Boveri CE Sys 80+ & GE Nuclear Energy ABWR as Evolutionary Reactor Designs ML20133A9871996-12-18018 December 1996 Informs of NRC Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-CE Sys 80+ & GE Nuclear Energy ABWR ML20133A9811996-12-18018 December 1996 Informs That NRC Has Approved Rules Certifying Two Evolutionary Reactor Designs:Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energy ABWR ML20128P4981996-09-23023 September 1996 Forwards Proposed Rule Language for 3 Design Certifications Discussed at 960827 NRC Briefing ML20128N6001996-09-16016 September 1996 Provides Addl Info in Response to Several Questions Raised by Commission During 960827 Briefing on Design Certification Rulemaking ML20117H3311996-08-30030 August 1996 Forwards GE ABWR Dcd,Rev 3 (Filed in Category A),Abwr Cdm, Rev 8 (Filed in Category a) & ABWR Ssar,Amend 37,Rev 9 (Filed in Category K) to Incorporate Changes Ref in 960701 & s from Jf Quirk ML20115C0861996-07-0101 July 1996 Forwards GE Providing Background for Need for Proposed Changes to ABWR Design Control Document (Dcd), Markups Incorporating Comments Resulting from Interactions W/Nrc & DCD Markups for Addl Proposed Change ML20115G2201996-06-10010 June 1996 Provides Comments from Two NRR Organizations on Cdm & SSAR Change Pages.Markups of DCD & SSAR Encl ML20108D4481996-04-26026 April 1996 Responds to Staff Ltr Re ABWR DCD Change Package Which Recommends That GE Submit All Changes Identified by Foake Program.Ltr Contrary to Previous Understandings ML20107H3241996-04-16016 April 1996 Forwards marked-up Proposed Changes to ABWR Design Description Resulting from Info Developed in Course of ABWR Engineering Program ML20108D3111996-04-0303 April 1996 Forwards Marked Up Proposed Changes to ABWR Design Description Resulting from Info Developed in Course of ABWR First-Of-A-Kind Engineering Program ML20101G9021996-03-22022 March 1996 Forwards Amend 36 to Rev 8 to 23A6100, ABWR SSAR & Rev 7 to 25A5447, Certified Design Matl ML20101P1231996-03-15015 March 1996 Expresses Appreciation for Opportunity on 960308 to Brief Commission on Views on Design Certification Rules, Particularly W/Respect to Issue of Applicable Regulations ML20092G0171995-09-15015 September 1995 Forwards Missing Pp 103-117 from Attachment B of from SR Specker on Behalf of GE Nuclear Energy Re Response to Proposed RM for Std Design Certification of Us Advanced BWR Design LD-95-041, Forwards Response to Ocre 950812 Comment on Design Features of GE Abwr.Disagrees W/Any Suggestion That NRC Extend Favorable Consideration of Comment to Sys 80+ Std Plant Design1995-09-0505 September 1995 Forwards Response to Ocre 950812 Comment on Design Features of GE Abwr.Disagrees W/Any Suggestion That NRC Extend Favorable Consideration of Comment to Sys 80+ Std Plant Design ML20092B6431995-09-0101 September 1995 Forwards Analysis of Ocre 950812 Supplemental Comments on Design of Abwr,Notice of Final Rule & Statement of Considerations,In Order to Ensure That NRC Has Complete Technical Info on Subj ML20086G7981995-07-12012 July 1995 Informs of Changes to Svc List,Per Request of Jn Fox ML20084Q0621995-05-31031 May 1995 Forwards Revised Effective Page Listing for ABWR Design Control Document ML20078F4271995-01-26026 January 1995 Provides Info for Closure of ABWR FSER Confirmatory Item F1.2.2-2 Previously Addressed in 941222 Closure Ltr ML20077R9141995-01-17017 January 1995 Forwards Rev 2 to ABWR Design Control Document. Rev of Design Control Document Accompanied by List of Currently Effective Pages.List Provided as Attachment 2 ML20081K9361994-12-22022 December 1994 Documents Closure of ABWR FSER Confirmatory Items ML20080D3341994-12-22022 December 1994 Forwards Rev 1 to Advanced BWR Design Control Document ML20077A7471994-11-23023 November 1994 Forwards Revised Fda for Us ABWR Std Design,Per App O of 10CFR52 & Notice of Issuance of Fda ML20081K9031994-11-18018 November 1994 Forwards Rev 0 to Technical Support Document (Tsd) for ABWR & Updated ABWR SSAR App 19P Markup.Updated Version of App 19P Incorporated as Attachment a to Tsd,As Agreed During 941006 Meeting W/Nrc ML20073M7221994-11-0404 November 1994 Forwards Proposed Rev to Section 3.8 of DCD Introduction for ABWR Re GE Meeting on 941102 ML20078E6391994-11-0101 November 1994 Forwards Description of Proposed Process for Controlling Changes to Severe Accident Evaluations & Explains Bases for Proposed Process ML20149G9751994-10-31031 October 1994 Requests That Encl Ltrs Be Distributed to Controlled Copy of Licensee QA Program ML20149G7081994-10-28028 October 1994 Forwards Rev 0 to ABWR Design Control Document (Dcd). DCD Comprised of Introduction,Certified Design Matl & Approved Safety Analysis Matl.Responses to NRC Comments Requested by Also Encl ML20081K8881994-10-13013 October 1994 Maintains That Proposition That GE Be Designated in Notice of Proposed Rulemaking as Source from Which Public Could Request Copies of Design Control Document (DCD) Inappropriate.Public Should Obtain Access to DCD from NRC ML20076F8451994-10-0505 October 1994 Responds to Re Root Cause & Corrective Measures on Unidentified Changes That Occurred in Design Control Document ML20081K8721994-09-20020 September 1994 Requests That ABWR Final Design Approval (Fda) Be Amended to Provide for Term of 15 Years from Date of Issuance & That,As Provided in SRM on COM-SECY-95-025,FDA Be Updated as Needed to Conform to Any Changes Resulting from Certification RM ML20149F7681994-09-0707 September 1994 Forwards Rev 0 to Advanced BWR Design Control Document ML20072T2691994-08-30030 August 1994 Advises That Industry Intends to Comment in Opposition to Applicable Regulations Approach & Proposed Text of Applicable Regulations in Design Certification Rulemaking Proceeding for Both ABWR & Sys 80+ ML20072Q2811994-08-30030 August 1994 Submits mark-up of Previous Version of Design Control Document Introduction Together W/Typed Rev ML20072C9821994-08-12012 August 1994 Responds to Re NRC Fee Regulations for Design Certification & Request Confirmation of Understanding of 10CFR170 ML20072E3381994-08-0909 August 1994 Requests Addition of Author Name to Svc List for Advanced BWR ML20072A8451994-08-0303 August 1994 Forwards Chapter 21 17x22 Inch Drawings to Replace Temporary 11x17 Drawings Provided in ML20071Q9091994-08-0202 August 1994 Forwards Ten Copies of Draft ABWR Design Control Document 1997-08-11
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20202H8981997-10-27027 October 1997 FOIA Request for Listed Pages from Section 19 of General Electric ABWR SSAR ML20149J7101997-07-23023 July 1997 Requests That R Simard Be Removed from Service Lists & R Bell Be Added to Svc Lists,Due to Recent NEI Reorganization ML20148A5701997-05-0202 May 1997 Forwards Affirmation Ltr Complying W/Filing Requirements of 10CFR52.45(d) & 50.30(b) Re Application for Review of ABWR Design Control Document,Rev 4 for Design Certification ML20196F8771997-03-28028 March 1997 Forwards Licensee ABWR Design Control Document,Rev 4 to Incorporate Changes Needed to Reflect Commission SRM Decisions & Subsequent Discussion W/Staff & to Support Ssar ML20137G3161997-03-28028 March 1997 Forwards Rev 4 to GEs ABWR Design Control Document to Incorporate Changes That Are Needed to Reflect Commission SRM Decisions & Subsequent Discussions W/Staff ML20128P4981996-09-23023 September 1996 Forwards Proposed Rule Language for 3 Design Certifications Discussed at 960827 NRC Briefing ML20128N6001996-09-16016 September 1996 Provides Addl Info in Response to Several Questions Raised by Commission During 960827 Briefing on Design Certification Rulemaking ML20117H3311996-08-30030 August 1996 Forwards GE ABWR Dcd,Rev 3 (Filed in Category A),Abwr Cdm, Rev 8 (Filed in Category a) & ABWR Ssar,Amend 37,Rev 9 (Filed in Category K) to Incorporate Changes Ref in 960701 & s from Jf Quirk ML20115C0861996-07-0101 July 1996 Forwards GE Providing Background for Need for Proposed Changes to ABWR Design Control Document (Dcd), Markups Incorporating Comments Resulting from Interactions W/Nrc & DCD Markups for Addl Proposed Change ML20115G2201996-06-10010 June 1996 Provides Comments from Two NRR Organizations on Cdm & SSAR Change Pages.Markups of DCD & SSAR Encl ML20108D4481996-04-26026 April 1996 Responds to Staff Ltr Re ABWR DCD Change Package Which Recommends That GE Submit All Changes Identified by Foake Program.Ltr Contrary to Previous Understandings ML20107H3241996-04-16016 April 1996 Forwards marked-up Proposed Changes to ABWR Design Description Resulting from Info Developed in Course of ABWR Engineering Program ML20108D3111996-04-0303 April 1996 Forwards Marked Up Proposed Changes to ABWR Design Description Resulting from Info Developed in Course of ABWR First-Of-A-Kind Engineering Program ML20101G9021996-03-22022 March 1996 Forwards Amend 36 to Rev 8 to 23A6100, ABWR SSAR & Rev 7 to 25A5447, Certified Design Matl ML20101P1231996-03-15015 March 1996 Expresses Appreciation for Opportunity on 960308 to Brief Commission on Views on Design Certification Rules, Particularly W/Respect to Issue of Applicable Regulations ML20092G0171995-09-15015 September 1995 Forwards Missing Pp 103-117 from Attachment B of from SR Specker on Behalf of GE Nuclear Energy Re Response to Proposed RM for Std Design Certification of Us Advanced BWR Design LD-95-041, Forwards Response to Ocre 950812 Comment on Design Features of GE Abwr.Disagrees W/Any Suggestion That NRC Extend Favorable Consideration of Comment to Sys 80+ Std Plant Design1995-09-0505 September 1995 Forwards Response to Ocre 950812 Comment on Design Features of GE Abwr.Disagrees W/Any Suggestion That NRC Extend Favorable Consideration of Comment to Sys 80+ Std Plant Design ML20092B6431995-09-0101 September 1995 Forwards Analysis of Ocre 950812 Supplemental Comments on Design of Abwr,Notice of Final Rule & Statement of Considerations,In Order to Ensure That NRC Has Complete Technical Info on Subj ML20086G7981995-07-12012 July 1995 Informs of Changes to Svc List,Per Request of Jn Fox ML20084Q0621995-05-31031 May 1995 Forwards Revised Effective Page Listing for ABWR Design Control Document ML20078F4271995-01-26026 January 1995 Provides Info for Closure of ABWR FSER Confirmatory Item F1.2.2-2 Previously Addressed in 941222 Closure Ltr ML20077R9141995-01-17017 January 1995 Forwards Rev 2 to ABWR Design Control Document. Rev of Design Control Document Accompanied by List of Currently Effective Pages.List Provided as Attachment 2 ML20080D3341994-12-22022 December 1994 Forwards Rev 1 to Advanced BWR Design Control Document ML20081K9361994-12-22022 December 1994 Documents Closure of ABWR FSER Confirmatory Items ML20081K9031994-11-18018 November 1994 Forwards Rev 0 to Technical Support Document (Tsd) for ABWR & Updated ABWR SSAR App 19P Markup.Updated Version of App 19P Incorporated as Attachment a to Tsd,As Agreed During 941006 Meeting W/Nrc ML20073M7221994-11-0404 November 1994 Forwards Proposed Rev to Section 3.8 of DCD Introduction for ABWR Re GE Meeting on 941102 ML20078E6391994-11-0101 November 1994 Forwards Description of Proposed Process for Controlling Changes to Severe Accident Evaluations & Explains Bases for Proposed Process ML20149G9751994-10-31031 October 1994 Requests That Encl Ltrs Be Distributed to Controlled Copy of Licensee QA Program ML20149G7081994-10-28028 October 1994 Forwards Rev 0 to ABWR Design Control Document (Dcd). DCD Comprised of Introduction,Certified Design Matl & Approved Safety Analysis Matl.Responses to NRC Comments Requested by Also Encl ML20081K8881994-10-13013 October 1994 Maintains That Proposition That GE Be Designated in Notice of Proposed Rulemaking as Source from Which Public Could Request Copies of Design Control Document (DCD) Inappropriate.Public Should Obtain Access to DCD from NRC ML20076F8451994-10-0505 October 1994 Responds to Re Root Cause & Corrective Measures on Unidentified Changes That Occurred in Design Control Document ML20081K8721994-09-20020 September 1994 Requests That ABWR Final Design Approval (Fda) Be Amended to Provide for Term of 15 Years from Date of Issuance & That,As Provided in SRM on COM-SECY-95-025,FDA Be Updated as Needed to Conform to Any Changes Resulting from Certification RM ML20149F7681994-09-0707 September 1994 Forwards Rev 0 to Advanced BWR Design Control Document ML20072Q2811994-08-30030 August 1994 Submits mark-up of Previous Version of Design Control Document Introduction Together W/Typed Rev ML20072T2691994-08-30030 August 1994 Advises That Industry Intends to Comment in Opposition to Applicable Regulations Approach & Proposed Text of Applicable Regulations in Design Certification Rulemaking Proceeding for Both ABWR & Sys 80+ ML20072C9821994-08-12012 August 1994 Responds to Re NRC Fee Regulations for Design Certification & Request Confirmation of Understanding of 10CFR170 ML20072E3381994-08-0909 August 1994 Requests Addition of Author Name to Svc List for Advanced BWR ML20072A8451994-08-0303 August 1994 Forwards Chapter 21 17x22 Inch Drawings to Replace Temporary 11x17 Drawings Provided in ML20071Q9091994-08-0202 August 1994 Forwards Ten Copies of Draft ABWR Design Control Document ML20070H9651994-07-20020 July 1994 Forwards Rev 7 to 23A6100, ABWR Ssar, Amend 35 & Rev 6 to 25A5447, ABWR Certified Design Matl ML20070D9381994-07-12012 July 1994 Forwards D-RAP Design Description & ITAAC for Inclusion in Section 3.6 of Cdm & Cdm & SSAR Markups Addressing Minor Corrections ML20069Q3001994-06-23023 June 1994 Forwards Rev 6 for SSAR Amend 35 & Rev 5 for Certified Design Matl ML20070E1981994-06-0808 June 1994 Forwards SSAR Markup Indicating Applicable Edtion to UBC, AISI SG-673 & NEMA FB1 to ABWR Ssar.Changes Will Be Included in Amend 35 Mod Package.Notifies That Applicable Edition of Bechtel Rept BC-TOP-3-A Is Rev 3 ML20070E1891994-06-0808 June 1994 Forwards Ssar Markup of Section 1A.2.34 Which Responds to TMI Item III.D.1(1).Mod Makes Section Consistent W/Ts 5.5.2.2.Change Will Be Included in Amend 35 Mod Package Scheduled for Distribution Later This Month ML20070D9331994-05-26026 May 1994 Forwards Results of Analyses to Assess Impact of Drywell Spray Actuation Following LOCA to Ensure Bounding Scenario ML20069H2101994-05-25025 May 1994 Forwards 25A5447,Rev 4, ABWR Certified Design Matl & Nonproprietary & Proprietary Version of 23A6100,Rev 5, ABWR Ssar. Proprietary Version of SSAR Withheld ML20069G9301994-05-25025 May 1994 Submits non-proprietary SSAR Amend 35 & Certified Design Material Rev 4 to Listed NRR Recipients ML20069B1831994-05-25025 May 1994 Resubmits Affidavit for GE Abwr,Proprietary Info Section 18H, Supporting Analysis for Emergency Control Operation Info ML20069A7371994-05-20020 May 1994 Forwards Proprietary SSAR Sections 11A.2 & 11A.4 to Specified NRR Recipients Listed on Attachment 1.Encl Withheld ML20029D4211994-04-29029 April 1994 Forwards Revised Ssar Markups Responding to Commitments Made at 940415 Meeting in Rockville,Md,Including Addl Info Reflecting Locking Mechanisms of Subassemblies & European Experience & Finalized TS for CRD Removal - Refueling 1997-07-23
[Table view] |
Text
f
' ~
GE Nuclear Energy a.... _ ____.-~ _. - _ -- -.- -
GeneralCectric Ccmpany 115 Curtxt A,enue, San Jose. CA 95125 April 25,1994 Docket No.52-001 Chet Poslusny, Senior Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of the Nuclear Reactor Regulation
Subject:
Submittal Supporting Accelerated ABWR Schedule - HVAC Information
Dear Chet:
Enclosed are the SSAR markups resulting from our April 20,1994 telephone call. These changes will be incorporated into the next amendment.
Please provide a copy of this transmittal to Jim Lyons.
Sincerely, ubd Jack Fox Advanced Reactor Programs cc:
Alan Deard GE Gary Ehlert GE)
)
Norman Fletcher DOE)
Joe Quirk GE)
-l ON
\\
{
num 2800'3 tl 9404280237 940425 PDR ADOCK 05200001 A
PDR
23A6100 Rev. 4 ABWR scad:rd sacty An:tysis Rep:rt (d) On manualinitiation, the clean area HVAC system can be put into high radiation mode. On switch over, exhaust fans stop and emergency filter train starts. System pressurizes clean areas of the senice building.
(e) Instrumentation is provided for the monitoring system operating variable during normal station operating conditions. The loss of airflow, high and low system temperature, and high differential pressure across various filters are annunciated on the local control panel. Trouble on the local panelis annunciated in the main control room.
(8) All power and water is provided from non-safety-related sources.
(9) The COL applicant will provide a detailed P&ID, system flow rates an equipment list, and compliance with RG 1.140 and toxic gas protection requirements for the Senice Building HVAC system, including the TSC and the OSC, for NRC review. (See Subsection 9.4.10.1 for COL L.icense Information.)
9.4.8.3 Safety Evaluation (1) The Senice Building HVAC System is not safety-related and is not required to assure either the integrity of the reactor coolant pressure boundary or the capability to shut down the reactor and maintain it in a safe shutdown conditions.
(2) Pressure control dampers are employed between clean and potentially contaminated areas and are of the backflow type and fail closed. This minimizes the backflow of contaminated air to clean areas when there is a loss of power and subsequent fan sptem shutdown.
(3) The system incorporates features to assure its reliable operation over the full range of normal station conditions.
(4) Clean areas are provided with emergency filtration system and a high radiation mode of operation.
> iNssRT A 9.4.8.4 Testing and Inspection All equipment is factoryinspected and tested in accordance with the applicable equipment specifications and codes. System ductwork and erection of equipment is inspec:ed during various construction stages. Preoperational tests are performed on all mechanical components and the system is balanced for the design air, and water flows and system operating pressures. Controls, interlocks and safety devices on each system -
are checked, adjusted, and tested to ensure the proper sequence of operation. A final integrated preoperational test is conducted with all equipment and controls operational to verify the system performance.
9.4 36 Air Conditioning. Heating. Cooling anci Ventilating Systems - Amendment 34 L
.i
.l s
INSERT A
.1 (5)
Since there are no sources of radioactivity inside the Service Building, automatic isolation provisions are not required. However, if radiation levels inside the Service Building are found to be high due to leakage from the secondary containment or from the Turbine Building, the Service Building HVAC system can be manually isolated to prevent releases to the environment.
i
'l i
i 4
i i
i l
,.m
..... _.. ~
. ~. ~
7,.
23A6100 Rav. 4
-ABWR standardsafetyAnalysis Report -
t 4
i Table 9.4-4f HVAC System Component Descriptions (Response to Question 430.243) (Continued)
Non-Safety Related Equipment Ust Cooling.
. Heating l
Heating / Cooling Coils Quantity (MJ/h)
(MJ/h) l R/B Secondary Containment HVAC (1 bank) 6435.95 9601.17 l
RIP ASD HVAC Division A 1
2110.15 l
RIP ASD HVAC Division B 1
2110.15 Table 9.4-4g HVAC System Component Descriptions (Response to Question 430.243) (Continued)
Non Safety-Related Equipment Ust 3
l Fans Quantity.
Capacity (m /h)
R/B Secondary Containment Supply Fans 3 (1 on standby) 84,250 R/B Secondary Containment Exhaust Fans 3 (1 on standby) '
86,250 i
R/B Primary Containment Supply Fan 1
22,000 R/B Primary Containment Exhaust Fan 1
22,000 l
RIP ASD Division A Supply Fans 2 (1 on standby) 50,000 l
RIP ASD Division B Supply Fans 2 (1 on standby) 50,000 Table 9.4-4h HVAC System Component Descriptions 4 -
(Response to Question 430.243)
' Non-Safety Related Equipment Ust 3
l' Filters Quantity Capacity (m /h).
R/B Secondary Containment HVAC (1 bank) 172,500 R/B Primary Containment intake HEPA Filter 1
22,000 l
Ii;I A5D nvAL, vivision A T
ov,GGG w o.
l Mir A50 l,/AC 0;
- un 5 56,0GE-
--g t
r Air Conditioning. Hesting, Cooling and Ventilating Systems - Amendment 34 9.447
.w 3...
+
-.n
- a
'...p.
j
?*
~' '
23A6100 Rev. 4 ABWR standard SafetyAnalysis Report
.l l,
Table 9.4-4i HVAC System Component De,scriptions -
(Response to Question 430.243) l Non Safety Related Equipment List l-Non-Safety Related Fan Coll Units Quantity Capacity (MJ/h) l Main Steam Tunnel 2
628.02 l
Refueling Mac ine Control Room 1
83.74 l
ISIRoo 2
54.43 l
MG Set Room A 2
1047.96 l
C/B Non Safety-Related Electric Room 1
211.01 l
R/B FPC Room 2
28.47' l
CRD Replacement Room 1
18.42 j.
RIP /CRD/FMCRD Repair Area -
2 18.42 l
PCV t/T Measurement Room 1
. 0.042 l
Plant Stack Monitor Room 1
0.461 l
R/B SPCU Room 1-42.29 l
- The COL applicant shall supply equipment lists for the Service Building HVAC and the Radwaste Building HVAC System. See Subsection 9.4.10.1 for the Service Building, and 9.4.10.2 for the Radwaste Building.
l 1
o 9448 Air Conditioning Heating, Cooling and Ventilating Systems - Amendment 34