MONTHYEARML20211G3041999-08-26026 August 1999 Suppl 981002 to LAR-98-006 to Licenses NPF-87 & NPF-89, Amending Tech Specs 4.0.6, SG Surveillance Requirements Which Provides Tube Insp Requirements & Acceptance Criteria to Determine Level of Degradation ML20210R6881999-08-13013 August 1999 Supplemental Application to License Amend Request LAR 98-010,for Licenses NPF-87 & NPF-89,correcting Existing Errors in Calculations of Original Lar.Revised Ts,Encl ML20209E1781999-07-0909 July 1999 Supplemental Application for LAR 99-002 for Licenses NPF-87 & NPF-89,proposing to Add Reactor Core Safety Limit Figures to Section 5.6.5 (COLR) of TSs TXX-9913, LAR 99-005 to Licenses NPF-87 & NPF-89,revising EDG Start to Emergency Start Instead of Normal Start Following Loss of Offsite Power1999-06-23023 June 1999 LAR 99-005 to Licenses NPF-87 & NPF-89,revising EDG Start to Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5311999-06-0404 June 1999 Supplemental Application for Amend to Licenses NPF-87 & NPF-89,proposing Addl Editorial Corrections.Corrections Are to Be Considered Administrative ML20195B6411999-05-27027 May 1999 LAR 99-004 to Licenses NPF-87 & NPF-89 by Incorporating Attached Change Re Plant Battery Surveillance Into TS ML20195B6571999-05-24024 May 1999 LAR 99-002 to Licenses NPF-87 & NPF-89,adding to COLR & Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206T5231999-05-14014 May 1999 Application for Amends to Licenses NPF-87 & NPF-89,changing Corporate Name of Licensee Texas Utilities Electric Co to Txu Electric Co. Marked-up OL Pages,Encl ML20206G7051999-05-0404 May 1999 LAR 99-001 for Amends to Licenses NPF-87 & NPF-89,revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections TXX-9826, Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl1998-12-21021 December 1998 Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl ML20195F1611998-11-13013 November 1998 LAR 98-08 to Licenses NPF-87 & NPF-89,changing Suppl to LAR 96-06,original Description & Assessment Provided in Ltr Dtd 960802,revised to Reflect Addition of Configuration Risk Mgt Program ML20195F5191998-11-11011 November 1998 LAR 98-007 to Licenses NPF-87 & NPF-89,revising Reactor Trip Setpoint for Cycle 5 ML20154C8971998-10-0202 October 1998 Application for Amends to Licenses NPF-87 & NPF-89,revising TS 4.0.6, SG Sr. Encls Contain Supporting Tss,Proprietary TR WCAP-15004,non-proprietary TR WCAP-15005 & W Proprietary Authorization Ltr.Proprietary Encl,Withheld TXX-9810, LAR 98-005 to Licenses NPF-87 & NPF-89,incorporating Encl Change Into Plant,Units 1 & 2 Ts.Change Is Applicable to Unit 2 & Administrative for Unit 1.Affidavit,encl1998-04-0909 April 1998 LAR 98-005 to Licenses NPF-87 & NPF-89,incorporating Encl Change Into Plant,Units 1 & 2 Ts.Change Is Applicable to Unit 2 & Administrative for Unit 1.Affidavit,encl ML20216B1321998-04-0606 April 1998 Application for Amend to License NPF-89,requesting Enforcement Discretion to Allow Plant to Continue to Operate W/O Having Performed Portions of Listed SRs ML20217A3841998-03-18018 March 1998 LAR 98-004 to Licenses NPF-87 & NPF-89,requesting Enforcement Discretion to Allow Units 1 & 2 to Perform Shutdown Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power ML20248L3161998-03-12012 March 1998 Application for Amends to Licenses NPF-87 & NPF-89,re Enforcement of Discretion & Compliance W/Ts 4.8.1.1.2f ML20216D5841998-03-0909 March 1998 Revised LAR 98-002 for Licenses NPF-87 & NPF-89,temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a), for Unit 2 Only TXX-9803, Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint1998-02-27027 February 1998 Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint ML20203J4921998-02-25025 February 1998 Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Attached Change Into TS to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements ML20212C3801997-10-24024 October 1997 Application for Amends to Licenses NPF-87 & NPF-89, Incorporating Encl Changes Re Reactor Trip Setpoint for Cycle 7 Into TS TXX-9711, Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint1997-05-16016 May 1997 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint ML20141C9271997-05-15015 May 1997 Application for Amends to Licenses NPF-87 & NPF-89,adding License Conditions to Address SRs Not Previously Performed by Existing Requirements or Tests.Attachments 1-20 Encl ML20116F0421996-08-0202 August 1996 LAR 96-006 to Licenses NPF-87 & NPF-89,increasing Allowed Outage Time for Charging Pump from 72 H to 7 Days ML20116F3561996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,revising Unit 1 Rx Trip Setpoints & Incorporating TU Electric SBLOCA TR on COLR Ts,Applicable to Both Units ML20116E8471996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,modifying Inverter/Battery Chargers by Incorporating Attached Changes Into CPSES Units 1 & 2 TSs ML20115E7991996-07-10010 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.7.11 to Revise Lco,Actions & SRs to Take Credit for Addition of Train Oriented Fan Coil Units for Each UPS & Distribution Room ML20115C9271996-07-0909 July 1996 LAR 96-003 to Licenses NPF-87 & NPF-89,increasing Allowable Value for Steam Line pressure-low for Cpses,Unit 1 ML20113B5831996-06-21021 June 1996 Application for Amends to Licenses NPF-87 & NPF-89,removing Request to Relocate MSIV Full Closure Time Requirement to Program Administratively Controlled by TS & Revising Associated Bases to Include Addl Info TXX-9600, Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.6.1 & Adding TS 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J, Option B1996-03-12012 March 1996 Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.6.1 & Adding TS 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J, Option B ML20100J0611996-02-22022 February 1996 Application for Amends to Licenses NPF-87 & NPF-89,revising TS LCO 3.9.4 to Allow Both Door of Pal to Remain Open If One Is Capable of Being Closed ML20096B3181996-01-0505 January 1996 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of LAR 96-001 Revising TS Re Wide Range RCS Temp.-Th Remote Shutdown Indication.Changes Submitted on CPSES Unit 1 for Administrative Purposes Only TXX-9528, LAR 95-008 to License NPF-87 & NPF-89,incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints,Resulting from Reload Analyses for CPSES Unit 2,Cycle 31995-11-21021 November 1995 LAR 95-008 to License NPF-87 & NPF-89,incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints,Resulting from Reload Analyses for CPSES Unit 2,Cycle 3 ML20094N6161995-11-21021 November 1995 Application for Amends to Licenses NPF-87 & NPF-89,allowing Containment Personnel Airlock Doors to Remain Open During Movement of Irradiated Fuel & During Core Alterations for Plant ML20087K1721995-08-15015 August 1995 Requests Amend to Licenses NPF-87 & NPF-89,consisting of Change Request 95-05,moving Shutdown Margin Limits from TS to COLR & Providing Guidelines for Removal of cycle-specific Parameter Limits from TS ML20087J7921995-08-15015 August 1995 LAR 95-04 to Licenses NPF-87 & NPF-89,moving Overtemp N-16 Limits from TS to Colr,Per GL 88-16.Changes in LAR 95-04 Originally Submitted in LAR 95-03 on 950512.LAR 95-03 Being Divided Into Four Separate LARs for Ease in Processing ML20087E2521995-08-11011 August 1995 Suppl to Application for Amends to Licenses NPF-37,NPF-66, NPF-72 & NPF-77,revising TS 3.6.1.7, Containment Purge Ventilation Sys ML20083M8531995-05-12012 May 1995 Application for Amend to Licenses NPF-87 & NPF-89,consisting of LAR 95-03,removing cycle-specific Parameter Limits from Ts,Per GL 88-16 TXX-9509, Application for Amends to Licenses NPF-87 & NPF-89.Amends Would Reduce Min Fuel Oil Vol Requirement During Modes 5 & 6 for Operable EDGs1995-05-0101 May 1995 Application for Amends to Licenses NPF-87 & NPF-89.Amends Would Reduce Min Fuel Oil Vol Requirement During Modes 5 & 6 for Operable EDGs ML20082C6401995-04-0303 April 1995 Suppl to Application for Amends to Licenses NPF-87 & NPF-89 Re Quadrant Power Tilt Ratio TXX-9505, LAR 95-001 to Licenses NPF-87 & NPF-89,changing TS to Address Performance Requirements of Containment Spray Pumps1995-02-28028 February 1995 LAR 95-001 to Licenses NPF-87 & NPF-89,changing TS to Address Performance Requirements of Containment Spray Pumps ML20079B4721994-12-30030 December 1994 LAR 94-022 to Licenses NPF-87 & NPF-89,incorporating Changes to TS to Increase Spent Fuel Storage Capacity.Rev 0 of CPSES Fuel Storage Licensing Rept,Cpses Expansion of Spent Fuel Storage Capacity Encl ML20078R8071994-12-19019 December 1994 Application for Amends to Licenses NPF-87 & NPF-89 to Allow Testing of RPS & ESFAS W/Channel Under Test in Bypass ML20078S0891994-12-19019 December 1994 Application for Amends to Licenses NPF-87 & NPF-89, Requesting Approval of Converted TSs to Format & Content of Improved STSs ML20077F0881994-12-0707 December 1994 License Amend Request 94-020 to Licenses NPF-87 & NPF-89, Revising TS LCO for MSIVs to Increase Allowed Outage Time in Mode 1 & Relocate MSIVs to Full Closure Time Requirement to Program Administratively Controlled ML20077F1951994-12-0606 December 1994 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of LAR 94-021,revising TS to Allow Appropriate Remedial Action for High Particulate Levels in DG Fuel Oil & Other out-of-limit Properties in New DG Fuel Oil ML20077A7071994-11-18018 November 1994 LAR 94-019 to Licenses NPF-87 & NPF-89,removing Accelarated Testing & Special Reporting Requirements for EDGs from TS, Based on GL 94-01 ML20078K7461994-11-18018 November 1994 LAR 94-018 to Licenses NPF-87 & NPF-89,revising TS Re Heat Flux Hot Channel Factor ML20078G7281994-11-11011 November 1994 Application for Amends to Licenses NPF-87 & NPF-89,revising TSs Re Exclusion of Failures from Total Number of Failures Used to Determine Diesel Generator Test Frequency ML20073B6491994-09-19019 September 1994 Application for Amends to Licenses NPF-87 & NPF-89, Incorporating Encl Change Into Licensee Units 1 & 2 TSs 1999-08-26
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20211J4031999-08-27027 August 1999 Errata to Amends 66 & 66 to Licenses NPF-87 & NPF-89, Respectively.Footnote on TS Page 3.8-26 Was Incorrectly Deleted ML20211G3041999-08-26026 August 1999 Suppl 981002 to LAR-98-006 to Licenses NPF-87 & NPF-89, Amending Tech Specs 4.0.6, SG Surveillance Requirements Which Provides Tube Insp Requirements & Acceptance Criteria to Determine Level of Degradation ML20210R6881999-08-13013 August 1999 Supplemental Application to License Amend Request LAR 98-010,for Licenses NPF-87 & NPF-89,correcting Existing Errors in Calculations of Original Lar.Revised Ts,Encl ML20209E1781999-07-0909 July 1999 Supplemental Application for LAR 99-002 for Licenses NPF-87 & NPF-89,proposing to Add Reactor Core Safety Limit Figures to Section 5.6.5 (COLR) of TSs TXX-9913, LAR 99-005 to Licenses NPF-87 & NPF-89,revising EDG Start to Emergency Start Instead of Normal Start Following Loss of Offsite Power1999-06-23023 June 1999 LAR 99-005 to Licenses NPF-87 & NPF-89,revising EDG Start to Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5311999-06-0404 June 1999 Supplemental Application for Amend to Licenses NPF-87 & NPF-89,proposing Addl Editorial Corrections.Corrections Are to Be Considered Administrative ML20195B6411999-05-27027 May 1999 LAR 99-004 to Licenses NPF-87 & NPF-89 by Incorporating Attached Change Re Plant Battery Surveillance Into TS ML20195B6571999-05-24024 May 1999 LAR 99-002 to Licenses NPF-87 & NPF-89,adding to COLR & Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206T5231999-05-14014 May 1999 Application for Amends to Licenses NPF-87 & NPF-89,changing Corporate Name of Licensee Texas Utilities Electric Co to Txu Electric Co. Marked-up OL Pages,Encl ML20206G7051999-05-0404 May 1999 LAR 99-001 for Amends to Licenses NPF-87 & NPF-89,revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections TXX-9826, Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl1998-12-21021 December 1998 Application for Amends to Licenses NPF-87 & NPF-89,proposing Increase in Licensed Power for Operation of Cpses,Unit 2 to 3445 Mwt (Approx 1%) & Changes Administratively for Unit 1.Supporting TSs & TR WCAP-10263,encl ML20195F1611998-11-13013 November 1998 LAR 98-08 to Licenses NPF-87 & NPF-89,changing Suppl to LAR 96-06,original Description & Assessment Provided in Ltr Dtd 960802,revised to Reflect Addition of Configuration Risk Mgt Program ML20195F5191998-11-11011 November 1998 LAR 98-007 to Licenses NPF-87 & NPF-89,revising Reactor Trip Setpoint for Cycle 5 ML20154C8971998-10-0202 October 1998 Application for Amends to Licenses NPF-87 & NPF-89,revising TS 4.0.6, SG Sr. Encls Contain Supporting Tss,Proprietary TR WCAP-15004,non-proprietary TR WCAP-15005 & W Proprietary Authorization Ltr.Proprietary Encl,Withheld TXX-9810, LAR 98-005 to Licenses NPF-87 & NPF-89,incorporating Encl Change Into Plant,Units 1 & 2 Ts.Change Is Applicable to Unit 2 & Administrative for Unit 1.Affidavit,encl1998-04-0909 April 1998 LAR 98-005 to Licenses NPF-87 & NPF-89,incorporating Encl Change Into Plant,Units 1 & 2 Ts.Change Is Applicable to Unit 2 & Administrative for Unit 1.Affidavit,encl ML20216B1321998-04-0606 April 1998 Application for Amend to License NPF-89,requesting Enforcement Discretion to Allow Plant to Continue to Operate W/O Having Performed Portions of Listed SRs ML20217A3841998-03-18018 March 1998 LAR 98-004 to Licenses NPF-87 & NPF-89,requesting Enforcement Discretion to Allow Units 1 & 2 to Perform Shutdown Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power ML20248L3161998-03-12012 March 1998 Application for Amends to Licenses NPF-87 & NPF-89,re Enforcement of Discretion & Compliance W/Ts 4.8.1.1.2f ML20216D5841998-03-0909 March 1998 Revised LAR 98-002 for Licenses NPF-87 & NPF-89,temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a), for Unit 2 Only TXX-9803, Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint1998-02-27027 February 1998 Application for Amends to Licenses NPF-87 & NPF-89, Increasing RWST low-low Level Setpoint ML20203J4921998-02-25025 February 1998 Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Attached Change Into TS to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements ML20212C3801997-10-24024 October 1997 Application for Amends to Licenses NPF-87 & NPF-89, Incorporating Encl Changes Re Reactor Trip Setpoint for Cycle 7 Into TS TXX-9711, Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint1997-05-16016 May 1997 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint ML20141C9271997-05-15015 May 1997 Application for Amends to Licenses NPF-87 & NPF-89,adding License Conditions to Address SRs Not Previously Performed by Existing Requirements or Tests.Attachments 1-20 Encl ML20116F0421996-08-0202 August 1996 LAR 96-006 to Licenses NPF-87 & NPF-89,increasing Allowed Outage Time for Charging Pump from 72 H to 7 Days ML20116F3561996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,revising Unit 1 Rx Trip Setpoints & Incorporating TU Electric SBLOCA TR on COLR Ts,Applicable to Both Units ML20116E8471996-07-31031 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,modifying Inverter/Battery Chargers by Incorporating Attached Changes Into CPSES Units 1 & 2 TSs ML20115E7991996-07-10010 July 1996 Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.7.11 to Revise Lco,Actions & SRs to Take Credit for Addition of Train Oriented Fan Coil Units for Each UPS & Distribution Room ML20115C9271996-07-0909 July 1996 LAR 96-003 to Licenses NPF-87 & NPF-89,increasing Allowable Value for Steam Line pressure-low for Cpses,Unit 1 ML20113B5831996-06-21021 June 1996 Application for Amends to Licenses NPF-87 & NPF-89,removing Request to Relocate MSIV Full Closure Time Requirement to Program Administratively Controlled by TS & Revising Associated Bases to Include Addl Info TXX-9600, Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.6.1 & Adding TS 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J, Option B1996-03-12012 March 1996 Application for Amends to Licenses NPF-87 & NPF-89,changing TS 3/4.6.1 & Adding TS 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J, Option B ML20100J0611996-02-22022 February 1996 Application for Amends to Licenses NPF-87 & NPF-89,revising TS LCO 3.9.4 to Allow Both Door of Pal to Remain Open If One Is Capable of Being Closed ML20096B3181996-01-0505 January 1996 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of LAR 96-001 Revising TS Re Wide Range RCS Temp.-Th Remote Shutdown Indication.Changes Submitted on CPSES Unit 1 for Administrative Purposes Only ML20094N6161995-11-21021 November 1995 Application for Amends to Licenses NPF-87 & NPF-89,allowing Containment Personnel Airlock Doors to Remain Open During Movement of Irradiated Fuel & During Core Alterations for Plant TXX-9528, LAR 95-008 to License NPF-87 & NPF-89,incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints,Resulting from Reload Analyses for CPSES Unit 2,Cycle 31995-11-21021 November 1995 LAR 95-008 to License NPF-87 & NPF-89,incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints,Resulting from Reload Analyses for CPSES Unit 2,Cycle 3 ML20087J7921995-08-15015 August 1995 LAR 95-04 to Licenses NPF-87 & NPF-89,moving Overtemp N-16 Limits from TS to Colr,Per GL 88-16.Changes in LAR 95-04 Originally Submitted in LAR 95-03 on 950512.LAR 95-03 Being Divided Into Four Separate LARs for Ease in Processing ML20087K1721995-08-15015 August 1995 Requests Amend to Licenses NPF-87 & NPF-89,consisting of Change Request 95-05,moving Shutdown Margin Limits from TS to COLR & Providing Guidelines for Removal of cycle-specific Parameter Limits from TS ML20087E2521995-08-11011 August 1995 Suppl to Application for Amends to Licenses NPF-37,NPF-66, NPF-72 & NPF-77,revising TS 3.6.1.7, Containment Purge Ventilation Sys ML20083M8531995-05-12012 May 1995 Application for Amend to Licenses NPF-87 & NPF-89,consisting of LAR 95-03,removing cycle-specific Parameter Limits from Ts,Per GL 88-16 TXX-9509, Application for Amends to Licenses NPF-87 & NPF-89.Amends Would Reduce Min Fuel Oil Vol Requirement During Modes 5 & 6 for Operable EDGs1995-05-0101 May 1995 Application for Amends to Licenses NPF-87 & NPF-89.Amends Would Reduce Min Fuel Oil Vol Requirement During Modes 5 & 6 for Operable EDGs ML20082C6401995-04-0303 April 1995 Suppl to Application for Amends to Licenses NPF-87 & NPF-89 Re Quadrant Power Tilt Ratio TXX-9505, LAR 95-001 to Licenses NPF-87 & NPF-89,changing TS to Address Performance Requirements of Containment Spray Pumps1995-02-28028 February 1995 LAR 95-001 to Licenses NPF-87 & NPF-89,changing TS to Address Performance Requirements of Containment Spray Pumps ML20079B4721994-12-30030 December 1994 LAR 94-022 to Licenses NPF-87 & NPF-89,incorporating Changes to TS to Increase Spent Fuel Storage Capacity.Rev 0 of CPSES Fuel Storage Licensing Rept,Cpses Expansion of Spent Fuel Storage Capacity Encl ML20078R8071994-12-19019 December 1994 Application for Amends to Licenses NPF-87 & NPF-89 to Allow Testing of RPS & ESFAS W/Channel Under Test in Bypass ML20078S0891994-12-19019 December 1994 Application for Amends to Licenses NPF-87 & NPF-89, Requesting Approval of Converted TSs to Format & Content of Improved STSs ML20077F0881994-12-0707 December 1994 License Amend Request 94-020 to Licenses NPF-87 & NPF-89, Revising TS LCO for MSIVs to Increase Allowed Outage Time in Mode 1 & Relocate MSIVs to Full Closure Time Requirement to Program Administratively Controlled ML20077F1951994-12-0606 December 1994 Application for Amends to Licenses NPF-87 & NPF-89, Consisting of LAR 94-021,revising TS to Allow Appropriate Remedial Action for High Particulate Levels in DG Fuel Oil & Other out-of-limit Properties in New DG Fuel Oil ML20078K7461994-11-18018 November 1994 LAR 94-018 to Licenses NPF-87 & NPF-89,revising TS Re Heat Flux Hot Channel Factor ML20077A7071994-11-18018 November 1994 LAR 94-019 to Licenses NPF-87 & NPF-89,removing Accelarated Testing & Special Reporting Requirements for EDGs from TS, Based on GL 94-01 ML20078G7281994-11-11011 November 1994 Application for Amends to Licenses NPF-87 & NPF-89,revising TSs Re Exclusion of Failures from Total Number of Failures Used to Determine Diesel Generator Test Frequency 1999-08-27
[Table view] |
Text
FE Log # TXX-94048 File # 916 (5.0) r = 10010 1UELECTRIC 10hfk
% illiam J. Cahill, Jr.
c,~,mur,,w,,
April 22, 1994 -
U. S. Nuclear Regulatory Commission (NRC)
Attn: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 SUBMITTAL OF LICENSE AMENDMENT REQUEST 94-009 INCREASE IN FUEL ENRICHMENT l
REF: 1) TU Electric letter logged TXX-92468 from W. J. Cahill, Jr., :
j to the NRC, dated October 16, 1992 '
- 2) NRC letter from Thomas A. Bergman to William J. Cahill, Jr., <
dated July 6, 1993 Gentlemen:
Pureuint to 10CFR50.90, TU Electric hereby requests an amendment to the i CP3dS Unit 1 and Unit 2 Operating Licenses (NPF-87 and NPF-89) by j incorporating the attached change into the CPSES Units 1 and 2 Technical ;
Specifications.
The proposed change revises the CPSES Units 1 and 2 Technical Specifications !
by increasing the allowable fuel enrichment from 4.3 weight percent to 5.0 t weight percent. This change is being made to improve the overall fuel cycle efficiency. Analyses provided in Reference 1, to allow an increase in fuel enrichment from 3.5 weight percent to 4.3 weight percent, support an enrichment up to 5.0 weight percent. Those analyses are applicable to this 4 request and are again included as part of this submittal (Enclosure 1). '
Reference 2 documented the NRC's review of those analyses.
Attachment 2 provides a detailed description of the proposed change, a safety analysis of the change, and TV Electric's determination that the ,
proposed change does not involve a significant hazard consideration. -l Attachment 3 provides the affected Technical Specification pages (NUREG-1468), marked-up to reflect the proposed change.
2b(2bC A i 9404290022 940422 ADOCK 05000445
=
PDR p PDR i w}]- I 400 N. Olive Street LI). 8 i Dallas, Texas 75201 -
1
4 TXX-94048 Page 2 of 2 The initial use of fuel enriched to greater than 4.3 weight percent is currently planned for the fifth fuel cycle (Cycle 5) for Unit 1. -Cycle 5 for Unit 1 is presently scheduled to start following the Spring, 1995 Unit 1 outage. The initial fuel receipt in support of this outage is expected in November 1994. TU Electric requests approval of this proposed license amendment by November 1, 1994, with implementation of the Technical Specification change to occur prior to initial receipt of fuel enriched to greater than 4.3 weight percent.
In accordance with 10CFR50.91(b), TV Electric is providing the State of Texas with a copy of this proposed amendment.
If you have any questions, please contact Mr. Bob Dacko at (214) 812-8228.
Sincerely, 1 )
William J. Cahill, Jr.
Group Vice President, Nuclear By: M a Roger'D. Walker Regulatory Affairs Manager BSD Attachments: 1. Affidavit
- 2. Description and Assessment
- 3. Affected Technical Specification page (NUREG-1468) as revised by all approved license amendments
Enclosure:
- 1. Criticality Safety Evaluation of Comanche Peak Fuel Storage facilities with Fuel of 5% Enrichment c- Mr. L. J. Callan, Region IV Mr. T. A. Bergman, NRR Mr. L. A. Yandell, Region Resident Inspectors, CPSES s2)
Mr. D. K. Lacker Bureau of Radiation Control Texas Department of Public Health 1100 West 49th Street Austin, Texas 78704
A O
Attachment 1 to TXX-94048 Page 1 of 1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )
)
Texas Utilities Electric Company ) Docket Nos. 50-445
) 50-446 (Comanche Peak Steam Electric ) License Nos. NPF-87 Station Units 1 & 2) ) NPF-89 AFFIDAVIT Roger D. Walker being duly sworn, hereby deposes and says that he is Regulatory Affairs Manager for TU Electric, the licer.see herein; that he is duly authorized to sign and file with the Nuclear Regulatory Commission this License Amendment Request 94-009; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to tte best of his knowledge, information and belief.
/ W Roger D'. Walker Regulatory Affairs Manager STATE OF TEXAS )
)
COUNTY OF DALLAS )
Subscribed and sworn to before me, on this 22nd day of A Pril ,
1994.
_] 101 Notary blic f.0 '
._____________q
, Gayle R. Peck >
. . l Notary Pubhc. State of Tcus ,
My Comm. Expres 01/06/98 L..:
]
Attachment 2 to TX/-94048 Page 1 of 6 DESCRIPTION AND ASSESSMENT I. BACKGROUND TV Electric requested and was granted an increase in the maximum uranium-235 (U-235) enrichment for reload fuel assemblies to 4.3 weight percent (w/o) from 3.5 w/o to support extended fuel cycles (18 months)
The analyses provided in support of that starting (with Unit 1.
request Reference 1)Cycle 4.
were performed for a 5.0 w/o fuel enrichment. The submittal did not request an increase to 5.0 w/o at that time because 4.3 w/o was sufficient-for an 18 month cycle and because the expected design of the proposed high density spent fuel racks was_not consistent with fuel enrichments above 4.3 w/o. The design of the proposed high density rack is being revised and is now expected to accommodate spent fuel with up to 5.0 w/o initiitl enrichment.
In order to realize the signif icant fuel cycle efficiency improvements i afforded by higher enrichment, TU Electric proposes to increase the .
maximum U-235 enrichment for reload fuel assemblies to 5.0 w/o from the !
current' maximum of 4.3 w/o. Tht. current allowance for fuel irradiation up to 60,000 megawatt days per me.tric ton of uranium (MWD /MTU) remains appropriate. The NRC evaluated this allowance fJr fuel-irradiation as '
documented in Reference 2. l This technical specification change is required to allow receipt and storage of fuel with enrichments over 4.3 w/o at CPSES. _
II. DESCRIPTION OF TECHNICAL SPECIFICATION CHANGE REQUEST The proposed change will revise the CPSES Technical Specificatior M REACTOR CORE, Section 5.3.1 to reflect the new enrichment limit.
Specifically, the sentence " Reload fuel shall be similar in phy!ical design to the initial core loading and shall have a maximum entichment not to exceed 4.3 weight percent U-235" will be changed to "RO oad fuel shall be similar in physical design to the initial core loading and shall have a maximum enrichment not to exceed 5.0 weight percent U-235."
III. ANALYSIS This analysis considers only the impact of the higher fuel enrichment on the handling and storage of fresh fuel and spent fuel. The use of.the fuel 11 the reactor core is analyzed each cycle in the reload safety analy',is which is reviewed in accordance with the requirements of 10CFR50.59. The analysis below addresses only the existing fuel rack configurations. Future fuel rack configurations will be analyzed and approved prior to use.
Attachment 2 to TXX-94048 Page 2 of 6 TV Electric prcvided analyses to the NRC to increase the allowable U-235 enrichment from 3.5 w/o to 4.3 w/o and to increase the al' ;e of' fuel irradiation up to 60,000 MWD /MTU (Reference 1). The char es were necessary to support an 18 month fuel cycle. The NRC approved the higher enrichment and higher fuel irradiation in Reference 2. The analyses provided in the Reference 1 submittal already support a 5.0 w/o fuel enrichment. Thus, the following discussions are essentially the same as those provided in Reference 1 updated to remove discussions relating to increasing the allowance of fuel irradiation (which is not being changed).
The fresh fuel storage racks at Comanche Peak Steam Electric Station consist of full-length annealed stainless steel storage cans with an inner dimension of 9.00 inches and a wall thickness of approximately 0.075 inches. The fresh fuel storage racks are designed so that there are seven groupings (sections) of two rows each, with a center-to-center spacing between assemblies within a row of 21 inches, and 21 inches between rows within a grouping. The center-to-center distance between nearest rows of assemblies in adjacent groupings is 36 inches. Three of the groupings have +en assemblies per row; the remainder, nine (See Figure 1). TFe freeh fuel storage racks can accommodate .132 fuel ,
assemblies. F resh f..el storage is normally dry. The fresh fuel storage' racks are designed so that it is not possible to insert a fuel assembly in any position witnin the rack array not intended for fuel. The fresh fuel storage racks are currently licensed at an enrichment' limit of 4.3 w/o U-235 and are capable of storing Westinghouse 17 x 17, Standard and Optimized, and Siemens 17 x 17 large and small diameter fuel rod designs.
The spent fuel storage racks provide a center-to-center distance between -l fuel assemblies of 16 inches. The racks employ full length annealed stainless steel cans with an inner dimension of 9.00 inches and a wall thickness of approximately 0.075 inches. These racks do not contain any additional poison material and rely on the water gap to maintain .
sub-criticality. Comanche Peak has two spent fuel storage pools I designed to contain spent fuel storage racks (including the damaged fuel containers) that have a total capacity of 1116 fuel assemblies. Pool number 1 is designed to contain twelve 6x5 rack modules, seven 5x5 rack modules, and one modified 5x5 rack module which can store 19 fuel assemblies and two damaged fuel containers. Pool number 2 is designed to contain twelve 6x5 rack modules and eight 5x5 rack modules. In both spent fuel' storage pools, the space between storage positions is blocked H to prevent insertion of fuel. The spent fuel pools are currently l partially racked with a total of 553 storage cell locations. The spent H fuel storage racks are currently designed to store Westinghouse 17 x 17, Standard and Optimized, and Siemens 17 x 17 large and small diameter fuel rod designs.
l
Attachment 2 to TXX-94048 Page 3 of 6 The containment refueling cavity of each unit has. additional interim age space consisting of one 5x5 rack nodule. The in-containment s.orage racks are identical in design to the spent fuel storage racks.
HOLTEC International has performed criticality safety. analyses (Reference 3) which verify the acceptability of an enrichmer t limit of 5.0 w/o U-235 for the fresh fuel, spent fuel, and in-containment storage racks.. The analyses bound the following fuel types: 1) Westinghouse 17 x 17 Standard and Optimized, and 2) Siemens 17 x 17 1arge and small diameter fuel rod designs. The computer codes KEN 05a and CASMG-3 were used. KEN 05a is a full three-dimensional analytical tool using transport theory to determine the reactivity of fuel storage rack geometries. CASMO-3 is a two-dimensional multi-group transport theory assembly computer code used in the criticality safety analyses to determine the most reactive fuel type and to investigate the reactivity effects of mechanical and material tolerances. The fresh fuel storage rack analyses considered the effect of full density water from a postulated flooding accident and low density water for optimum moderation scenarios. The spent fuel and in-containment storage racks were evaluated under normal storage conditions and postulated accident conditions. Criticality safety analyses of the fresh fuel, spent fuel, and in-containment storage racks using the most reactive fuel.at 5.0 w/o U-235 resulted in k,,, values which were less than the acceptance criteria identified in NRC guidance documents. The criticality safety analyses confirmed that the CPSES fuel storage facilities can safely accommodate fuel up to 5.0 w/o U-235. No burnup restrictions or checkerboarding of fuel assemblies is required.
1 IV. SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION TU Electric has evaluated the significant hazards consideration. involved with the proposed change by focusing on the three standards set forth in 10 CFR 50.92 (c) as discussed below:
Does the proposed change:
l (1) Involve a significant increase in the probability or. consequences I of an accident previously evaluated?
There is no increase in the probability or consequences of misplacing fuel assemblies in the fresh fuel, spent fuel, and in-containment storage racks. These racks are designed to prevent the insertion of a fuel assembly in any position within a rack'not intended for fuel. In the current partially racked configuration of the spent fuel pools, a mis-positioned fuel assembly could accidentally be situated adjacent to a row of stored fuel.or an-inside corner adjacent to.two rack modules. The postulated-assembly mi.s-positioning accident was analyzed taking credit for the presence of boron in the pool water. The presence of 2000 ppm concentration boron in the pool water' assures a k,,, much less than 0.95.
e
- - - .. . . - , -- ~. . ,
} .
Attachment 2 to TXX-94048
. Page 4 of 6 2
The probability of a fuel handling _ accident, such as dropping a spent fuel assembly does not increase, since the mass of the fuel assembly does not increase when the U-235 enrichment is increased.
, The consequences of a spent fuel assembly-drop accident'do not.
increase significantly due to an increase in enrichment since-fission product inventories in the fuel. assembly do not change significantly due to an increase in the fuel enrichment. ' Fission' product inventories are primarily a function of recent. power history and fuel irradiation and are relatively insensitive'to initial enrichment. The impact of increasing the allowance for fuel irradiation to the current limit of 60,000 (MWD /MTU) was previously analyzed and found to be acceptable in Reference 1.
The results of this analysis for enrichments up to 4.3 w/o remain valid for an increase in the enrichment limit to 5.0 w/o. Thus, the proposed change does-not significantly increase the consequences of a fuel handling accident.
5 This increase in fuel enrichment does not result in an increase in the probability or consequences of an event which introduces optimum moderation conditions in the fresh fuel storage racks.
The fresh fuel storage racks have been analyzed for a range of moderation conditions from fully flooded to optimum moderation at an enrichment of 5,0 w/o U-235. These analyses demonstrate that-the fresh fuel storage racks-remain subcritical under such moderation conditions.
There is no increase in the probability of an accident involving loss of bulk cooling capability in the spent fuel storage pool-as a result of increasing fuel enrichment from 4.3 w/o to 5.0 w/o.- 3 The decay ~ heat' loads are primarily a function of fission product '
inventory.and, as discussed above, are relatively insensitive to initial enrichment. Decay heat loads for the 5.0 w/o enriched '
fuel may increase slightly, however, conservative analyses presented in the CPSES FSAR remain valid.
Thus the proposed change does not involve a significant increase in the probability or consequences of an accident previously
, analyzed.
(2) Create the possibility of a new or different kind of accident from any accident previously evaluated?
4
, The possibility of a new or unique accident not previously evaluated is not created by the proposed change. Spent fuel handling accidents and loss of heat removal capability in the spent fuel storage pools have.already been analyzed'and documented in the CPSES FSAR. The types of criticality accidents in either !
l i
II
- . - - _. . . - - . --m___
O i
I l
Attachment ~2 to TXX-94048 Page 5 of 6 l
the fresh fuel storage racks or the spent fuel storage racks are l not new. The enrichment limit upgrade does not create any !
different types of accidents than those already analyzed and documented in the CPSES FSAR.
(3) Involve a significant reduction in the margin of safety?
The proposed change does not involve a significant reduction in the margin of safety. The increase in enrichment from 4.3 w/o to 5.0 w/o U-235 reduces the margin to criticality when the fresh fuel is placed in the storage areas. However, criticality analyses performed for the fresh fuel storage racks demonstrate subcriticality under a range of moderation conditions from fully flooded to optimum moderation. Criticality analyses of the spent fuel and in-containment storage racks demonstrate that fuel with enrichments up to 5.0 w/o U-235 can be safely accommodated within y the NRC guidelines. The spent fuel storage pool will be at least- '
five percent subtritical under accident conditions with soluble boron (2000 ppm) present in the pool water. Thus, the increase .in fuel enrichment does not result in a significant reduction in the margin of safety.
V. ENVIRONMENTAL EVALUATION TU Electric has evaluated the proposed change and has det. ermined-that the change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amount of any effluent that may be released off-site,.or-(iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed change meets the eligibility criterionforcategoricalexclusionsetforthin10CFR51.22(c).
Therefore, pursuant to 10 CFR 51.22(b), an environmental assessment of the proposed change is not required.
VI. REFERENCES
- 1. TV Electric letter logged TXX-92468 from W. J. Cahill, Jr., to the NRC, dated October 16, 1992
- 2. NRC letter from Thomas A. Bergman to William J. Cahill, Jr.,
dated July 6, 1993
- 3. " Criticality Safety Evaluation of Comanche Peak Fuel Storage facilities with fuel of 5% Enrichment," HOLTEC Report HI-92880, September, 1992.
Attachment 2 to TXX-94048 1* Page 6 of 6 1
e r --
BOOOO0DOO O O O O O O O O O .,
w j OOOOOOOOO "
21*
O O O O O O O Q,,0. " i OOOOOOOOO 000000000 ;
O0000C.000 -
\
000000000 _
l s
5 OOOOOOOOOO 1
g 0000000000 i
OOO0000000 OOOOOOOOOO OOOOOOOOO O b
D00000000 0 32- :
3.. .
i 9