Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000305/LER-1981-034, Forwards LER 81-034/03L-0 + (06:32:54, 20 December 2024)
- ML20038A998 + (06:32:55, 20 December 2024)
- 05000237/LER-1981-065-01, /01T-0:on 811103,during Quarterly Surveillance, MSIVs 2-203-1A,1B & 1D Had Closure Times Less than Tech Specs.Caused by Misadjusted Timing Mechanism Due to Damper Seal Misalignment.Msiv 1B Due to Normal Operation + (06:32:56, 20 December 2024)
- ML20038A995 + (06:32:57, 20 December 2024)
- 05000237/LER-1981-065, Forwards LER 81-065/01T-0.Detailed Event Analysis Encl + (06:32:59, 20 December 2024)
- ML20038A992 + (06:33:00, 20 December 2024)
- ML20038A990 + (06:33:01, 20 December 2024)
- 05000270/LER-1981-017-01, /01T-0:on 810919,while Attempting to Initiate Decay Heat Cooling to Stop Steam Generator Tube Leak,Valve 2LP-2 Failed to Open Electrically or Manually.Apparently Caused by Bent Valve Stem.Valve Stem Replaced + (06:33:02, 20 December 2024)
- ML20038A988 + (06:33:04, 20 December 2024)
- 05000270/LER-1981-017, Forwards LER 81-017/01T-0.Detailed Event Analysis Encl + (06:33:05, 20 December 2024)
- 05000296/LER-1981-029-03, Fire Protection Preaction Sprinkler Sys for Reactor Bldg Elevations 565-593 & 621 Found Isolated.Caused by Personnel Lack of Familiarity W/ Isolation Valve Operating Characteristics.Valve Opened + (06:33:07, 20 December 2024)
- ML20038A984 + (06:33:08, 20 December 2024)
- ML20038A982 + (06:33:08, 20 December 2024)
- ML20038A979 + (06:33:11, 20 December 2024)
- 05000260/LER-1981-056-03, /03L-0:on 811021,bearings on 2B Dihydrogen Dioxide Sample Return Pump Seized.Pump & Motor Replaced + (06:33:13, 20 December 2024)
- ML20038A977 + (06:33:14, 20 December 2024)
- PNO-III-81-100, on 811110,craft Welders Informed Erector of Containment Steel That Welders Had Been Directed to Mask Defects or Possible Defects to Prevent Detection by QA Insp Program.Stop Work Order Issued + (06:33:19, 20 December 2024)
- ML20038A974 + (06:33:19, 20 December 2024)
- ML20038A973 + (06:33:20, 20 December 2024)
- PNO-III-81-096, on 811103,licensee Commenced Reactor Shutdown to Investigate & Correct Excessive Water Leakage in Drywell. Caused by Defective Recirculation Pump Outer Seal.Seal Being Replaced.Reactor Startup to Occur on 811107 + (06:33:22, 20 December 2024)
- ML20038A971 + (06:33:24, 20 December 2024)
- PNO-II-81-102, on 811114,control Rod Failed to Insert Fully During Controlled Shutdown.Cause Suspected to Be Electrical Connector Problem on Drive Mechanism.Rod de-energized & Dropped Into Core + (06:33:26, 20 December 2024)
- ML20038A969 + (06:33:27, 20 December 2024)
- ML20038A968 + (06:33:28, 20 December 2024)
- PNO-II-81-100, on 811110,Xe-133 Released in Auxiliary Bldg. Caused by Radwaste Evaporator Loop Seal Blowing.No Max Permissible Concentration Limits Exceeded.Eleven Workers Slightly Contaminated & Decontaminated + (06:33:29, 20 December 2024)
- 05000260/LER-1981-056, Forwards LER 81-056/03L-0 + (06:33:31, 20 December 2024)
- ML20038A964 + (06:33:32, 20 December 2024)
- ML20038A963 + (06:33:33, 20 December 2024)
- ML20038A961 + (06:33:34, 20 December 2024)
- ML20038A962 + (06:33:34, 20 December 2024)
- ML20038A960 + (06:33:35, 20 December 2024)
- ML20038A959 + (06:33:36, 20 December 2024)
- ML20038A958 + (06:33:37, 20 December 2024)
- ML20038A957 + (06:33:37, 20 December 2024)
- ML20038A956 + (06:33:38, 20 December 2024)
- ML20038A955 + (06:33:39, 20 December 2024)
- TXX-3437, Confirms 811029 Hand Delivered Test Rept, Fire Qualification Test of Protective Envelope Sys. Requests Review of Rept for Acceptability + (06:33:39, 20 December 2024)
- ML20038A953 + (06:33:41, 20 December 2024)
- ML20038A952 + (06:33:42, 20 December 2024)
- ML20038A951 + (06:33:43, 20 December 2024)
- ML20038A950 + (06:33:44, 20 December 2024)
- ML20038A949 + (06:33:44, 20 December 2024)
- ML20038A947 + (06:33:46, 20 December 2024)
- FVY-81-165, Responds to Request for Clarification of Util Position Re Implementation of NUREG-0737 Item II.B.1 Re RCS Vents.Bwr Owners Group Submittal Endorsed as Util Response to Item + (06:33:47, 20 December 2024)
- ML20038A946 + (06:33:47, 20 December 2024)
- ML20038A944 + (06:33:49, 20 December 2024)
- ML20038A942 + (06:33:50, 20 December 2024)
- ML20038A940 + (06:33:51, 20 December 2024)
- ML20038A941 + (06:33:51, 20 December 2024)
- ND-20-0075, Request for License Amendment and Exemption: Unit 3 Auxiliary Building Wall 11 Seismic Gap Requirements (LAR-20-001) + (06:33:52, 20 December 2024)
- ML20038A938 + (06:33:53, 20 December 2024)