ML20038A961
| ML20038A961 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 11/19/1981 |
| From: | Crouse R TOLEDO EDISON CO. |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| References | |
| 759, NUDOCS 8111240527 | |
| Download: ML20038A961 (1) | |
Text
sn 6
,[
r(
5 1
(Q' L J.1 b
)
a] NOV2 4198148 j'6fggq u s.
ytons,
Docket No. 50-346
- 1.,,A fN(8' V.
Floono P. Cnotme vc.w. m M, g'/'; gf 6,-
[]
License No. NPF-3 Serial No. 759 November 19, 1981 Director of Nuclear Reactor Regulation Attention:
Mr. John F. Stolz Operating Reactors Branch No. 4 Division of Operating Reactors United "*ates Nuclear Regulatory Commission Washingtti, D.C.
20555
Dear Mr. Stolz:
Our letter, Serial No. 755 dated November 5, 1981, transmitted revision 2 to the Davis-Besse Nuclear Power Station Unit 1 Cycle 2 reload report comprising several Technical Specification changes to permit complete withdrawal of the Axial Power Shaping Rods (APSRs) at 250_+10 effective full power days (EFPD).
In conversation with Mr. Guy Vissing on November 18, 1981, we were requested to document the basis for the differences between the existing Technical Specifications figures 3.1-5b and 3.1-5d (APSR position limits for four and three pump oi, ration) and revision to these figures proposed by our submi' tal ref erenced above.
The existing Technical Specification APSR position limits fer operation beyond 150 EFPD were set with conservative margin at low powe.r levels.
These low power position limits are generally set by conservative extra-polations, whereas the determination of the position limit at the higher power levels is much more rigorous.
During the reanalysis of the peaking behavior for revision 2 of the reload report, these lower limits were examined in detail, primarily to reduce possibilities of significant power reduction to permit complete withdrawal of APSR at 250+10 EFPD. This investigation resulted in the modification of the lower power APSR withdrawal limits for the period from 150 to 250 EFPD for four and three pump operation.
Based on the above, these changes are totally justified and adequate margin to LOCA kw/ft limits is maintained.
Yours very truly, A M/p-e RPC:SCJ: sic.
I d
cc: DB-1 NRC Resident Inspector THE TCREDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO OHIO 43652 8111240527 811119"
PDR ADOCK 05000344:
P PDR)
_ _ _ _ _ _ _ _ _ _ _ _ _ _