Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20038B029 + (06:32:25, 20 December 2024)
- 05000325/LER-1981-077-03, /03L-0:on 811030,during Reactor Startup,Control Rod 34-39 Did Not Have RTGB Positon Indication at Position 6.Probably Caused by Defective Position Indication Probe Reed Switch + (06:32:26, 20 December 2024)
- 05000325/LER-1981-077, Forwards LER 81-077/03L-0 + (06:32:28, 20 December 2024)
- 05000315/LER-1981-050-03, /03L-0:on 811021,peak Acceleration Recorder for Cd Diesel Generator Room Floor Found Removed from Concrete Pad. Probably Caused by Const Activity in Area.Metal Cage Installed Over Recorder + (06:32:35, 20 December 2024)
- 05000315/LER-1981-050, Forwards LER 81-050/03L-0 + (06:32:36, 20 December 2024)
- 05000316/LER-1981-057-03, /03L-0:on 811024-1105,steam Generator 4 Blowdown Isolation Valve DCR-340 Failed to Meet Tech Spec Closing Time.Caused by Improperly Aligned Light Switch,Scored Stem Packing & Gasket & Leaking Asco Solenoid Valve + (06:32:38, 20 December 2024)
- 05000316/LER-1981-056-03, /03L-0:on 811019,review Revealed 811018 Mode Change Took Place W/O Surveillance on N Train Battery Current as Required.Caused by Lack of Signoff of Plant Heatup Procedure + (06:32:40, 20 December 2024)
- ML20038B013 + (06:32:41, 20 December 2024)
- ML20038B011 + (06:32:42, 20 December 2024)
- ML20038B010 + (06:32:44, 20 December 2024)
- ML20038B009 + (06:32:45, 20 December 2024)
- ML20038B008 + (06:32:45, 20 December 2024)
- 05000265/LER-1981-024-03, /03L-0:on 811019,temp Switches 2-1360-17B,16C & 17C Found to Trip in Excess of Tech Specs.Caused by Instrument Setpoint Drift.Switches Replaced + (06:32:48, 20 December 2024)
- ML20038B004 + (06:32:49, 20 December 2024)
- 05000265/LER-1981-024, Forwards LER 81-024/03L-0 + (06:32:50, 20 December 2024)
- 05000305/LER-1981-034-03, /03L-0:on 811018,during Normal operations,1B Zone SV Fan Started Automatically.Caused by Solenoid Failure Due to Burned Out Coil in Safe Position Automatically Starting Fan & Opening Damper.Coil Replaced + (06:32:52, 20 December 2024)
- 05000305/LER-1981-034, Forwards LER 81-034/03L-0 + (06:32:54, 20 December 2024)
- ML20038A998 + (06:32:55, 20 December 2024)
- 05000237/LER-1981-065-01, /01T-0:on 811103,during Quarterly Surveillance, MSIVs 2-203-1A,1B & 1D Had Closure Times Less than Tech Specs.Caused by Misadjusted Timing Mechanism Due to Damper Seal Misalignment.Msiv 1B Due to Normal Operation + (06:32:56, 20 December 2024)
- ML20038A995 + (06:32:57, 20 December 2024)
- 05000237/LER-1981-065, Forwards LER 81-065/01T-0.Detailed Event Analysis Encl + (06:32:59, 20 December 2024)
- ML20038A992 + (06:33:00, 20 December 2024)
- ML20038A990 + (06:33:01, 20 December 2024)
- 05000270/LER-1981-017-01, /01T-0:on 810919,while Attempting to Initiate Decay Heat Cooling to Stop Steam Generator Tube Leak,Valve 2LP-2 Failed to Open Electrically or Manually.Apparently Caused by Bent Valve Stem.Valve Stem Replaced + (06:33:02, 20 December 2024)
- ML20038A988 + (06:33:04, 20 December 2024)
- 05000270/LER-1981-017, Forwards LER 81-017/01T-0.Detailed Event Analysis Encl + (06:33:05, 20 December 2024)
- 05000296/LER-1981-029-03, Fire Protection Preaction Sprinkler Sys for Reactor Bldg Elevations 565-593 & 621 Found Isolated.Caused by Personnel Lack of Familiarity W/ Isolation Valve Operating Characteristics.Valve Opened + (06:33:07, 20 December 2024)
- ML20038A984 + (06:33:08, 20 December 2024)
- ML20038A982 + (06:33:08, 20 December 2024)
- ML20038A979 + (06:33:11, 20 December 2024)
- 05000260/LER-1981-056-03, /03L-0:on 811021,bearings on 2B Dihydrogen Dioxide Sample Return Pump Seized.Pump & Motor Replaced + (06:33:13, 20 December 2024)
- ML20038A977 + (06:33:14, 20 December 2024)
- PNO-III-81-100, on 811110,craft Welders Informed Erector of Containment Steel That Welders Had Been Directed to Mask Defects or Possible Defects to Prevent Detection by QA Insp Program.Stop Work Order Issued + (06:33:19, 20 December 2024)
- ML20038A974 + (06:33:19, 20 December 2024)
- ML20038A973 + (06:33:20, 20 December 2024)
- PNO-III-81-096, on 811103,licensee Commenced Reactor Shutdown to Investigate & Correct Excessive Water Leakage in Drywell. Caused by Defective Recirculation Pump Outer Seal.Seal Being Replaced.Reactor Startup to Occur on 811107 + (06:33:22, 20 December 2024)
- ML20038A971 + (06:33:24, 20 December 2024)
- PNO-II-81-102, on 811114,control Rod Failed to Insert Fully During Controlled Shutdown.Cause Suspected to Be Electrical Connector Problem on Drive Mechanism.Rod de-energized & Dropped Into Core + (06:33:26, 20 December 2024)
- ML20038A969 + (06:33:27, 20 December 2024)
- ML20038A968 + (06:33:28, 20 December 2024)
- PNO-II-81-100, on 811110,Xe-133 Released in Auxiliary Bldg. Caused by Radwaste Evaporator Loop Seal Blowing.No Max Permissible Concentration Limits Exceeded.Eleven Workers Slightly Contaminated & Decontaminated + (06:33:29, 20 December 2024)
- 05000260/LER-1981-056, Forwards LER 81-056/03L-0 + (06:33:31, 20 December 2024)
- ML20038A964 + (06:33:32, 20 December 2024)
- ML20038A963 + (06:33:33, 20 December 2024)
- ML20038A961 + (06:33:34, 20 December 2024)
- ML20038A962 + (06:33:34, 20 December 2024)
- ML20038A960 + (06:33:35, 20 December 2024)
- ML20038A959 + (06:33:36, 20 December 2024)
- ML20038A958 + (06:33:37, 20 December 2024)
- ML20038A957 + (06:33:37, 20 December 2024)
- ML20038A956 + (06:33:38, 20 December 2024)