Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20039B099 + (05:23:49, 20 December 2024)
- ML20039B100 + (05:23:49, 20 December 2024)
- 05000271/LER-1981-031, Forwards LER 81-031/03L-0 + (05:23:51, 20 December 2024)
- ML20039B096 + (05:23:53, 20 December 2024)
- IR 05000206/1981039 + (05:23:54, 20 December 2024)
- ML20039B093 + (05:23:55, 20 December 2024)
- ML20039B091 + (05:23:56, 20 December 2024)
- ML20039B088 + (05:23:59, 20 December 2024)
- AECM-81-503, Forwards Response to Human Factors Engineering Branch Concerns Re Facility Control Room Review.Response to Remaining Open Items Will Be Submitted 60 Days Prior to Full Power OL Issuance + (05:24:00, 20 December 2024)
- ML20039B084 + (05:24:04, 20 December 2024)
- ML20039B083 + (05:24:05, 20 December 2024)
- 05000278/LER-1981-017-03, /03L-0:on 811109,reactor Core Isolation Cooling High Steam Flow Isolation Switch Exceeded Tech Spec Limit. Caused by Setpoint Drift of Barton Model 288 Dpis.Instrument Recalibr + (05:24:07, 20 December 2024)
- ML20039B081 + (05:24:08, 20 December 2024)
- ML20039B080 + (05:24:09, 20 December 2024)
- ML20039B079 + (05:24:10, 20 December 2024)
- 05000029/LER-1981-030-03, /03L-0:on 811111,primary Vent Stack Gaseous & Iodine Radiation Monitor Rate Meters Failed High & Channel Inoperable for Approx 9.6-h.Caused by Moisture in Detectors Due to Need to Bypass Dryers Because of Low Flow Condition + (05:24:12, 20 December 2024)
- ML20039B077 + (05:24:13, 20 December 2024)
- ML20039B076 + (05:24:14, 20 December 2024)
- 05000029/LER-1981-030, Forwards LER 81-030/03L-0 + (05:24:15, 20 December 2024)
- ML20039B072 + (05:24:17, 20 December 2024)
- ML20039B073 + (05:24:17, 20 December 2024)
- 05000293/LER-1981-063-04, /04T-0:on 811130,Yankee Atomic Environ Lab Rept Received Indicating Reportable Concentration of Cs-137 in Cranberry Sample from Manomet Point Bog.Apparently Caused by Previous Weapons Testing & Inadequate Potassium in Soil + (05:24:19, 20 December 2024)
- ML20039B070 + (05:24:20, 20 December 2024)
- ML20039B069 + (05:24:21, 20 December 2024)
- ML20039B067 + (05:24:22, 20 December 2024)
- 05000293/LER-1981-063, Forwards LER 81-063/04T-0 + (05:24:23, 20 December 2024)
- ML20039B064 + (05:24:24, 20 December 2024)
- 05000318/LER-1981-052-03, /03L-0:on 811113,reactor Protective Sys Channel B Trip Units for Higher Power,Thermal Margin/Low Pressure & Axial Shape Index Bypassed for Corrective Maint.Caused by delta-T Potentiometer Malfunction Due to Normal Wear + (05:24:26, 20 December 2024)
- ML20039B062 + (05:24:27, 20 December 2024)
- 05000318/LER-1981-052, Forwards LER 81-052/03L-0 + (05:24:28, 20 December 2024)
- 05000249/LER-1981-039-01, /01T-0:on 811130,HPCI Room Fire Sys Initiation Alarm Sounded & Fire Protection Deluge Sys Actuated.Caused by High Concentration of Humidity/Steam Vapor in HPCI Room. Sys to Be Reviewed to Improve Reliability + (05:24:30, 20 December 2024)
- ML20039B058 + (05:24:32, 20 December 2024)
- ML20039B056 + (05:24:35, 20 December 2024)
- ML20039B055 + (05:24:36, 20 December 2024)
- 05000249/LER-1981-039, Forwards LER 81-039/01T-0 + (05:24:37, 20 December 2024)
- ML20039B050 + (05:24:41, 20 December 2024)
- ML20039B049 + (05:24:42, 20 December 2024)
- ML20039B046 + (05:24:44, 20 December 2024)
- ML20039B048 + (05:24:44, 20 December 2024)
- ML20039B045 + (05:24:45, 20 December 2024)
- ML20039B044 + (05:24:46, 20 December 2024)
- ML20039B043 + (05:24:47, 20 December 2024)
- ML20039B042 + (05:24:47, 20 December 2024)
- ML20039B041 + (05:24:48, 20 December 2024)
- ML20039B040 + (05:24:48, 20 December 2024)
- ML20039B037 + (05:24:50, 20 December 2024)
- ML20039B039 + (05:24:50, 20 December 2024)
- ML20039B035 + (05:24:51, 20 December 2024)
- ML20039B033 + (05:24:53, 20 December 2024)
- ML20039B031 + (05:24:54, 20 December 2024)
- ML20039B030 + (05:24:55, 20 December 2024)