ML20039B040

From kanterella
Jump to navigation Jump to search
Clarifies Re Status of Fire Protection Requirements.Msiv & Battery Rooms Should Be Added to Tech Specs.Tech Specs Amend Request Will Be Submitted to Correct Listed Discrepancies
ML20039B040
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 12/10/1981
From: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
To: Clark R
Office of Nuclear Reactor Regulation
References
NUDOCS 8112220216
Download: ML20039B040 (2)


Text

____-__ _ -- ___ _-__ -___ _ _ _ - _ _ _

BALTIMORE GAS AND ELECTRIC CHARLES CENTER.P.O. BOX 1475 BALTIMORE, MARYLAND 21203 ARTMum E.. LUNDVALL. JR.

viCE PRESIDENT SuPPLv December 10, 1981 h4 di.

g?/j' Office of Nuclear Reactor Regulation s

U. S. Nuclear Regulatory Commission N

p"" dyp"3 4 Washington, D. C.

20555 Q

M DEC n

~

2.l fg i( /p.._,m [g g p Attn:

Mr. Robert A. Clark, Chief 81 g; Operating Reactors Branch #3 7,yf4.r

  • ]

Division of Operating Reactors

(.

pdi \\(

Subject:

Calvert Cliffs Nuclear Power Plant Units Nos. 1 & 2; Dockets Nos. 50-317 & 50-Fire Protection Technical Snecifications

References:

(a) BG&E letter dated 11/6/81, from A. E. Lundvall to R. A. Clark.

(b) BG&E letter dated 12/29/80, from A. E. Lundvall to D. G. Eisenhut.

Gentlemen:

My previous letter of November 6,1981 gives the status of Fire Protection Requirements. Information in that letter requires the following clarifications:

1.

Status of SER Item 3.1.19, Fire Detection, did not address the fact that fire detection for the Main Steam Isolation Valve (MSIV) Rooms would ne be completed until the next regularly scheduled outage foi each unit, as previously shown in reference (b). Personnel access to these rooms is limited because of heat during operation; consequently, the modification must be completed when the plant is cooled down for several weeks.

2.

Although excluded from pre-Appendix R requirements, the battery rooms require the installation of fire detection to meet 10 CFR 50 Appendix R.

This requirement was overlooked and detection was not implemented during the additional installations done to comply with Appendix R.

However, detection in the battery rooms is currently underway and is expected to be complete within the next several weeks.

f J

l0 0112220216 811210 PDR ADOCK 05000317 F

PDR

Mr. R. A. Clark Page 2 Decembzr 10, 1981 The MSIV and the battery rooms should e added to the Technical Specifications. These itema have been discussed with your ?'.r.

David Jaffe, Project Manager for Calvert Cliffs.

A Technical Specification Anendment request vill be submitted to correct these discrepancies in the near future.

Very trul( your,s,

(,

. ' t&t~ct' dl'<

^

t ec:

J. A. Biddison, Esquire G. F. Trowbridge, Esquire l'essrs. D. Jaffe, IBC R. E. Architzel, ?BC l