Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20039E161 + (04:31:16, 20 December 2024)
- ML20039E159 + (04:31:17, 20 December 2024)
- ML20039E158 + (04:31:18, 20 December 2024)
- ML20039E157 + (04:31:18, 20 December 2024)
- ML20039E155 + (04:31:19, 20 December 2024)
- ML20039E154 + (04:31:20, 20 December 2024)
- ML20039E152 + (04:31:21, 20 December 2024)
- ML20039E153 + (04:31:21, 20 December 2024)
- ML20039E151 + (04:31:22, 20 December 2024)
- ML20039E150 + (04:31:23, 20 December 2024)
- ML20039E149 + (04:31:24, 20 December 2024)
- ML20039E148 + (04:31:25, 20 December 2024)
- ML20039E147 + (04:31:26, 20 December 2024)
- ML20039E145 + (04:31:29, 20 December 2024)
- ML20039E146 + (04:31:29, 20 December 2024)
- ML20039E144 + (04:31:30, 20 December 2024)
- PNO-III-81-122, on 811228,while Conducting Control Rod Exercise Surveillance Test,Reactor Tripped on High Flux. Pressurizer Level Control Valve Failed in Closed Position. Caused by Water in Air Controller + (04:31:32, 20 December 2024)
- ML20039E140 + (04:31:33, 20 December 2024)
- ML20039E137 + (04:31:34, 20 December 2024)
- ML20039E138 + (04:31:34, 20 December 2024)
- ML20039E136 + (04:31:35, 20 December 2024)
- ML20039E134 + (04:31:37, 20 December 2024)
- ML20039E135 + (04:31:37, 20 December 2024)
- ML20039E133 + (04:31:39, 20 December 2024)
- ML20039E131 + (04:31:40, 20 December 2024)
- ML20039E130 + (04:31:41, 20 December 2024)
- ML20039E129 + (04:31:42, 20 December 2024)
- ML20039E128 + (04:31:42, 20 December 2024)
- ML20039E127 + (04:31:43, 20 December 2024)
- ML20039E125 + (04:31:44, 20 December 2024)
- ML20039E124 + (04:31:45, 20 December 2024)
- 05000255/LER-1981-052-01, /01T-0:on 811214,shift Supervisor Vented Increased Containment Pressure Through 3-inch Manual Valve W/Operator Standing By.Caused by Supervisor Error in Judgment.Employee Removed from Duties to Review Knowledge of Tech Specs + (04:31:46, 20 December 2024)
- ML20039E122 + (04:31:47, 20 December 2024)
- ML20039E120 + (04:31:48, 20 December 2024)
- ML20039E119 + (04:31:50, 20 December 2024)
- ML20039E117 + (04:31:51, 20 December 2024)
- ML20039E116 + (04:31:52, 20 December 2024)
- 05000255/LER-1981-052, Forwards LER 81-052/01T-0 + (04:31:54, 20 December 2024)
- ML20039E113 + (04:31:55, 20 December 2024)
- ML20039E112 + (04:31:55, 20 December 2024)
- ML20039E111 + (04:31:56, 20 December 2024)
- 05000237/LER-1981-071-03, /03L-0:on 811126,standby Gas Treatment Sys B Auto Started Following Reactor Bldg Vent Sys Trip & Position Indication Lost for Drywell Floor & Equipment Drain & Drywell Valves.Caused by Blown Burnt Relay Coil + (04:31:58, 20 December 2024)
- ML20039E107 + (04:31:59, 20 December 2024)
- 05000237/LER-1981-071, Forwards LER 81-071/03L-0 + (04:32:00, 20 December 2024)
- ML20039E103 + (04:32:02, 20 December 2024)
- ML20039E102 + (04:32:02, 20 December 2024)
- 05000251/LER-1981-015-03, /03L-0:on 811128,two Overpressure Conditions Developed for Which Overpressure Mitigating Sys Failed to Operate.Caused by Failed Summator on Sys Circuitry Coupled W/Inadvertently Isolated Pressure Transmitter + (04:32:04, 20 December 2024)
- ML20039E098 + (04:32:05, 20 December 2024)
- IR 05000358/1981028 + (04:32:07, 20 December 2024)
- ML20039E094 + (04:32:08, 20 December 2024)
- PNO-III-81-120A, on 811224,reactor Brought to Cold Shutdown Condition After Failure of HPCI & Automatic Depressurization Sys.Caused by Water Intrusion Into HPCI Turbine Oil Sys & Several Grounds in Dc Power Sys + (04:32:10, 20 December 2024)
- ML20039E091 + (04:32:11, 20 December 2024)