- ML20039F348 + (04:08:40, 20 December 2024)
- ML20039F349 + (04:08:40, 20 December 2024)
- 05000366/LER-1981-118, Forwards LER 81-118/03L-0 + (04:08:41, 20 December 2024)
- AECM-81-518, Interim Deficiency Rept Re Thermal Cycling of Reactor Vessel Head During Hot Operations,Initially Reported 811201.GE Analysis of Effect on Reactor Vessel Fatigue Cycle Lifetime Continuing.Final Rept Will Be Submitted by 820219 + (04:08:42, 20 December 2024)
- ML20039F344 + (04:08:44, 20 December 2024)
- ML20039F343 + (04:08:45, 20 December 2024)
- ML20039F342 + (04:08:46, 20 December 2024)
- IR 05000373/1981036 + (04:08:47, 20 December 2024)
- AECM-81-517, Final Deficiency Rept Re Potential Cracking in Presray Inflatable Seals for Personnel Airlocks,Initially Reported 811008.AE Will Replace All Defective Seals by 820315 + (04:08:48, 20 December 2024)
- ML20039F338 + (04:08:50, 20 December 2024)
- ML20039F337 + (04:08:51, 20 December 2024)
- ML20039F336 + (04:08:52, 20 December 2024)
- ML20039F335 + (04:08:53, 20 December 2024)
- ML20039F334 + (04:08:54, 20 December 2024)
- ML20039F333 + (04:08:55, 20 December 2024)
- IR 05000213/1981010 + (04:08:56, 20 December 2024)
- ML20039F329 + (04:08:57, 20 December 2024)
- 05000327/LER-1981-149-03, /03L-0:on 811209,w/unit at 2245 Cst,Steam Generator Blowdown Effluent Line Radiation Monitor Declared Inoperable Due to Erratic Readings.Caused by Pulsating Sample Flow Through Monitor + (04:08:59, 20 December 2024)
- ML20039F327 + (04:09:00, 20 December 2024)
- ML20039F325 + (04:09:01, 20 December 2024)
- ML20039F324 + (04:09:10, 20 December 2024)
- 05000327/LER-1981-149, Forwards LER 81-149/03L-0 + (04:09:11, 20 December 2024)
- 05000339/LER-1981-071-03, /03X-1:on 810911,hydraulic Snubber on Main Steam Line Inoperable Due to Loss of Oil from Reservoir.Caused by Leak Due to Scored Brass Bushing on Piston Shaft Extending Through Cylinder End.Snubbers Purged & Refilled + (04:09:13, 20 December 2024)
- 05000335/LER-1981-050-03, /03L-0:on 811201,during Zero Physics Testing, Surveillance Requirement to Suspend Shutdown Margin Was Not Met W/Rods Not Tripped within Previous 24-h.Caused by Failure to Follow Procedure.Procedure Clarified + (04:09:15, 20 December 2024)
- ML20039F318 + (04:09:17, 20 December 2024)
- 05000287/LER-1981-016-03, /03L-0:on 811202,channel C Pump Power Monitor Failed to Send Trip Signal During Online Testing.Caused by Failed 1C on Monitor Logic Board.Board Replaced & Monitor Tested Satisfactorily + (04:09:19, 20 December 2024)
- 05000339/LER-1981-071, Forwards LER 81-071/03X-1 + (04:09:20, 20 December 2024)
- 05000335/LER-1981-050, Forwards LER 81-050/03L-0 + (04:09:22, 20 December 2024)
- 05000366/LER-1981-120-03, /03L-0:on 811202,two HPCI Pump Discharge Snubbers Were Found Incapable of Traveling Full Stroke.Caused by Damaged PSA-1 Mechanical Snubbers.Snubbers Replaced + (04:09:24, 20 December 2024)
- 05000287/LER-1981-016, Forwards LER 81-016/03L-0.Detailed Event Analysis Encl + (04:09:26, 20 December 2024)
- ML20039F308 + (04:09:27, 20 December 2024)
- 05000366/LER-1981-128-03, /03L-0:on 811215,door 2RW21 to Drum Conveyor Aisle Discovered Open & Unattended.Caused by Midnight Shift Personnel Error.Door Found Open by Health Physics Personnel & Immediately Locked.Personnel Cautioned + (04:09:29, 20 December 2024)
- 05000366/LER-1981-120, Forwards LER 81-120/03L-0 + (04:09:30, 20 December 2024)
- 05000369/LER-1981-190-03, /03L-0:on 811203,lower Personnel Airlock Door on Reactor Bldg Side of Airlock Declared Inoperable Due to Ruptured Seal.Caused by Mfg Design Oversight.Seal Replaced. Procedural Change Should Prevent Similar Failures + (04:09:32, 20 December 2024)
- ML20039F303 + (04:09:34, 20 December 2024)
- ML20039F302 + (04:09:35, 20 December 2024)
- 05000366/LER-1981-128, Forwards LER 81-128/03L-0 + (04:09:36, 20 December 2024)
- 05000369/LER-1981-190, Forwards LER 81-190/03L-0 + (04:09:38, 20 December 2024)
- ML20039F297 + (04:09:39, 20 December 2024)
- 05000339/LER-1981-066-03, Boron Concentration in 1C Safety Injection Accumulator Exceeded Max Tech Specs Limit. Caused by Inleakage Into Makeup Supply Header from Spent Fuel Pit.Concentration Restored by Draining Accumulator + (04:09:40, 20 December 2024)
- 05000369/LER-1981-189-03, /03L-0:on 811130,pressurizer Pressure Slowly Decreased & Pressurizer Backup Heaters Violated Tech Specs by Automatically Energizing & Restoring Pressure.Caused by Open Breakers on Heater Power Panels.Extensive Mods Planned + (04:09:42, 20 December 2024)
- ML20039F294 + (04:09:44, 20 December 2024)
- ML20039F293 + (04:09:45, 20 December 2024)
- 05000338/LER-1981-084-03, /03L-0:on 811203,while in Mode 1 Operation,Doors Between Rod Drive Room & Auxiliary Bldg Failed to Close & Latch Automatically.Caused by Closure & Latching Mechanism Failure or by Door Misalignment.Doors Repaired + (04:09:46, 20 December 2024)
- 05000369/LER-1981-189, Forwards LER 81-189/03L-0 + (04:09:48, 20 December 2024)
- ML20039F287 + (04:09:50, 20 December 2024)
- 05000339/LER-1981-066, Forwards Updated LER 81-066/03X-1 + (04:09:52, 20 December 2024)
- 05000338/LER-1981-084, Forwards LER 81-084/03L-0 + (04:09:57, 20 December 2024)
- ML20039F282 + (04:09:58, 20 December 2024)
- 05000364/LER-1981-052-03, /03L-0:on 811206,A Train Control Room Chlorine Detector Declared Inoperable Due to Paper Not Advancing. Caused by Scrap of Paper Jamming Paper Drive Gears.Paper Removed + (04:10:00, 20 December 2024)
- 05000339/LER-1981-070-03, Boron Concentration in Safety Injection Accumulators Exceeded Tech Specs.Caused by Leakage Into Makeup Supply Header from Spent Fuel Pit. Accumulator Refilled W/Borated Water + (04:10:02, 20 December 2024)