ML20039F318

From kanterella
Jump to navigation Jump to search
Amend 80 to License DPR-21,establishing New Vessel Level Setpoints Consistent W/Installation of Common Ref Level Required by TMI Action Item II.K.3.27
ML20039F318
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/11/1981
From: Crutchfield D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20039F291 List:
References
TASK-2.K.3.27, TASK-TM NUDOCS 8201120336
Download: ML20039F318 (4)


Text

'

p nu y/

UNITED STATES g

NUCLEAR REGULATORY COMMISSION D

j WASHINGTON,0 0 20556

\\...../

THE CONNECTICUT LIGHT AND POWER COMPANY THE HARTFORD ELECTRIC LIGHT COMPANY WESTERN MASSACHUSETTS ELECTRIC COMPANY AND NORTHEAST NUCLEAR ENERGY COMPANY DOCKET NO. 50-245 MILLSTONE NUCLEAR POWER STATION, UNIT 1 AMENDMENT T0 PROVISIONAL OPERATING LICENSE Amendment No. 80,

~

License No. DPR-21 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by The Connecticut Light and' Power Company, The Hartford, Electric Light Company, Western Massachusetts Electric Company and Northeast Nuclear Electric Company (the licensees) dated October 9,1981, as revised by Northeast Nuclear Energy Company telephone comments on September 16, 1981, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will, operate in conformity with th'e application,- the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that.the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have' been satisfied.

8201120336 811211 PDR ADOCK 05000245 P

PDR

' ~

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 3.B of Provisional Operating License No. DPR-21 is hereby amended to read as follows:

3.B Technical Specifications The Technical Specifications contained in Appendices A and B as revised through Amendment No. 80, are hereby incorporated in the license.

Northeast Nuclear Energy Company shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective within 30 days of its data of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Dennis M. Crutchfield, Chief Operating Reactors Branch #5 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: December 11, 1981 e

ATTACHMENT TO LICENSE AMENDMENT NO. 80 ~

PROVISIONAL OPERATING LICENSE NO. DPR-21 DOCKET NO. 50-245 Replace the enclosed page 3/4 2-4 of Appendix A Technical Specifications with the enclosed page 3/4 2-4.

This revised page contains the captioned amendment number and yertical lines indicating the area of change.

e-4 Y

e

~

e es

?

t I

1 0

  • e

.+ - -

n,

-,ww.,,

-mm,--a-

-,,,------w,-

ww--

- =

w

TAllt L 3.2.2 (Continueil) f.UOL ING *,V',Illi',

INSTRUHf MI All0N THAT INill All'S AND CONIHOLS fill' IHLitt.t HfV ( Oul s._.

=._..._

Heenart s Minianud Number of Trip Function Trip Level Setting Operable last. Channels Per Trip System (1)

I - In conjunction with low low reactor Timer Auto Blowdown i 120 seconds Water level and high dryWeII pressure and LP core cooling pump interlock.

1 1 - Prevent inadvertent operation of l

r.2j3CoreHeight1.e.,

Contdinment spray.

Containment Spray

{,[,fncYSPsig 2

Interlock 1 - Defer APR actuation pending confirma-.

APR LP Core Cooling 90 1 P < 110 Psig tion of LP core cooling system 2

Pump laterlock operation.

1 - Permissive for auto-close of emergc::cy Normal for 120 Volt power source on buses.

2 sets of 2 Power Available on undervoltage relays (Total)

Emergency Buses (Monitor Buses 5 and 6) 2 - Permissive to start core spray and LPCI ptanps.

1 - Initiates start of emergency pcWer Normal for 120 Volt 2 sets of 7 Loss of Normal Power Undervoltage llelays sources.

(Total)

(Monitor buses 1,2,3 and 4) 2 - Strip loads from buses.

3 - Permissive for emergency power sources to close on buses.

h i

d If the first column cannot be met for b9th trip systems, inmediately initiate a nrderly shutd ld conditions.

'l ) ~

3/4 2-4 Anendment No. 77, 80 S

e