ML20039F325
| ML20039F325 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 12/31/1981 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, ANPP-19808-GHD, DER-81-45, NUDOCS 8201120343 | |
| Download: ML20039F325 (3) | |
Text
._
M Docket Nos. 70- 728/729/530 70 77(e) Report f34TelGU GLaitHTE3ni @@TIEPATw/
MMLMMim STA.
P.O. BOX 21666 PHOENIX, ARIZONA 85036 l
December 31, 1981 l
}
0
/\\.
l U. S. Nuclear Regulatory Commission d'
Region V N
1450 Maria Lane, Suite 210 y
ggg Walnut Creek, California 94596-5368 7
JAN111982* C Attention:
Mr. B. H. Faulkenberry, Chief Reactor Construction and ThD7 Engineering Support Branch ICC
/-
f
Subject:
Interim Report - DER 81-45 A 50.57(e) Potentially Reportable Dcficiency Relating to Unit 1 Pressurizer Missing Lock Wires on Cover Plate Cap Strews File:
81-019-026 D.4.33.2
Reference:
Telephone Conversatien between J. Eckhardt and B. Kaplan on December 3, 1981 (DER 81-45)
Dear Sir:
The NEC was notified of a potentially reportable deficiency in the referenced telephone conversation.
At that time, it was estimated that a determination of reportability would be made within thirt (30) days.
y Due to the extensive investigation and evaluation required Report is attached.
, an Interim It is now expected that this information will be finalized by March 3, 1982, at which time a complete report will be submitted.
Very truly your,
g
~
CLLL hlLL(~ N E. E. Van Brunt, Jr.
APS Vice President
'el__
}
Nuclear Projects
[
Attachment
- N'
'#*C N
CHD/BSK:bj mS 8
3W See Attached Page 2 "Ni cc:
- a lE T1 4
8201120343 811231 PDR ADOCK 05000528 S
PDR g\\
YL3 [ ^ ---
U. S. Nuclear Regulatory Commission Mr. B. H. Faulkenberry, Chief ANPP-19808-GHD/BSK December 31, 1981 Page 2 cc: Richard DeYoung, Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Washington, D. C.
20555 J. A. Roedel D. B. Fasnacht G. C. Andognini F. W. Hartley J. M. Allen A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen Ms. Patricia Lee Hourihan 6413 South 26th Street Phoenix, Arizona 85040
INTERIti REPORT - DER 81-45 POTENTIAL. REPORTABLE DEFICIENCY-ARIZONA PUBLIC SERVICE COMPANY (APS)
PVNGS UNIT 1 I.
POTENTIAL PROBLEM During Bechtel's modification work on the Combustion Engineering furnished pressurizer (Tag #IMRCEX02), it was discovered that lock-wires had not been installed on the cap screws securing the heater discharge cover plate. Combastion Engineering confirmed : hat lock-wires were supposed to be installed. The problem would have gone undetected had it not been for the rework.
II.
APPROACH TO AND STATUS OF PROPOSED RESOLUTIONS Bechtel has requested assistance from Combustion Engineering in evaluating and dispositioning this item.
III. PROJECTED COMPLETION OF CORRECTIVE ACTION AND SUBMITTAL OF THE FINAL REPORT The evaluation and final report are forecast to be completed by March 3, 1982.
1 i
______._______m_-_
_ _ _ _ _ _ _ _m-
.u___
-