Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20040A133 + (03:41:12, 20 December 2024)
- ML20040A131 + (03:41:13, 20 December 2024)
- 05000237/LER-1981-074-03, /03L-0:on 811214,reactor Vessel ECCS Permissive Low Pressure Alarm Would Not Reset.Caused by Failure of Mechanic to Reopen Isolation Valve for Ps 263-52A While Backfilling safety-related Instruments.Valve Reopened + (03:41:15, 20 December 2024)
- ML20040A122 + (03:41:17, 20 December 2024)
- ML20040A121 + (03:41:18, 20 December 2024)
- 05000237/LER-1981-074, Forwards LER 81-074/03L-0 + (03:41:19, 20 December 2024)
- ML20040A118 + (03:41:21, 20 December 2024)
- ML20040A117 + (03:41:22, 20 December 2024)
- ML20040A116 + (03:41:23, 20 December 2024)
- ML20040A113 + (03:41:24, 20 December 2024)
- ML20040A115 + (03:41:24, 20 December 2024)
- ML20040A112 + (03:41:26, 20 December 2024)
- ML20040A111 + (03:41:27, 20 December 2024)
- ML20040A110 + (03:41:28, 20 December 2024)
- ML20040A109 + (03:41:29, 20 December 2024)
- 05000346/LER-1981-064, Revised LER 81-064/03X-3:on 811012 & 13,pump for Re 5028, post-accident Containment Radiation Monitor,Failed.Caused by Decreased Flow Due to Pump Vane Wear.Maint Step Added to Check & Set Flow Weekly.Redundant Sys Operable Duri + (03:41:37, 20 December 2024)
- ML20040A106 + (03:41:38, 20 December 2024)
- ML20040A105 + (03:41:40, 20 December 2024)
- ML20040A103 + (03:41:41, 20 December 2024)
- ML20040A100 + (03:41:42, 20 December 2024)
- ML20040A099 + (03:41:43, 20 December 2024)
- 05000237/LER-1981-073-03, /03L-0:on 811214,during Startup,Reactor Low Pressure Alarm H-16 on Control Room Panel 902-3 Indicated Isolation Condenser Initiation Pressure Switch 2-263-53C Valved Out of Svc.Caused by Personnel Error + (03:41:45, 20 December 2024)
- ML20040A097 + (03:41:46, 20 December 2024)
- ML20040A096 + (03:41:47, 20 December 2024)
- NUREG-0634, Forwards Region 3 Input to Ser.Applicants Organizational Structure & Conduct of Operations Acceptable.Resolution of Open Items Will Be Addressed in Suppl SER + (03:41:49, 20 December 2024)
- 05000237/LER-1981-073, Forwards LER 81-073/03L-0 + (03:41:51, 20 December 2024)
- ML20040A092 + (03:41:52, 20 December 2024)
- ML20040A091 + (03:41:53, 20 December 2024)
- ML20040A090 + (03:41:54, 20 December 2024)
- ML20040A089 + (03:41:55, 20 December 2024)
- IR 05000358/1981030 + (03:41:58, 20 December 2024)
- ML20040A087 + (03:41:59, 20 December 2024)
- ML20040A085 + (03:42:00, 20 December 2024)
- ML20040A084 + (03:42:01, 20 December 2024)
- ML20040A082 + (03:42:02, 20 December 2024)
- 05000346/LER-1981-069-03, /03L-1:on 810919,radiation Monitoring Channel 1 Panel Discovered de-energized,rendering Listed Radiation Monitors Inoperable.Caused by Blown Power Supply Fuse in Circuit Y103.Fuse Replaced + (03:42:04, 20 December 2024)
- ML20040A080 + (03:42:05, 20 December 2024)
- ML20040A079 + (03:42:06, 20 December 2024)
- ML20040A077 + (03:42:07, 20 December 2024)
- 05000346/LER-1981-069, Forwards LER 81-069/03L-1 + (03:42:08, 20 December 2024)
- ML20040A074 + (03:42:09, 20 December 2024)
- ML20040A073 + (03:42:11, 20 December 2024)
- 05000275/LER-1981-009-03, /03L-0:on 811211,operator Failed to Perform Daily Channel Check on Iodine Sampler Flow Rate Monitor.Caused by Inadequate Instructions for Verifying Annunciator Window Operability.Procedure Change Issued + (03:42:12, 20 December 2024)
- ML20040A071 + (03:42:13, 20 December 2024)
- ML20040A070 + (03:42:14, 20 December 2024)
- 05000275/LER-1981-009, Forwards LER 81-009/03L-0 + (03:42:15, 20 December 2024)
- ML20040A065 + (03:42:16, 20 December 2024)
- ML20040A064 + (03:42:17, 20 December 2024)
- ML20040A062 + (03:42:19, 20 December 2024)
- ML20040A061 + (03:42:20, 20 December 2024)
- ML20040A060 + (03:42:20, 20 December 2024)