Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20040D997 + (02:36:12, 20 December 2024)
- IR 05000282/1981022 + (02:36:14, 20 December 2024)
- 05000295/LER-1982-001-03, /03L-0:on 820112,discharge Damper on Oc Fan Found Failed Open W/Fan Off,Leaving Aircraft Fire Protection Sys for Auxiliary Bldg Air Supply Intake Inoperable.Caused by Frozen Bore in Air Operated Relay Valve + (02:36:16, 20 December 2024)
- ML20040D993 + (02:36:18, 20 December 2024)
- ML20040D989 + (02:36:19, 20 December 2024)
- ML20040D991 + (02:36:19, 20 December 2024)
- ML20040D987 + (02:36:20, 20 December 2024)
- ML20040D985 + (02:36:22, 20 December 2024)
- ML20040D984 + (02:36:23, 20 December 2024)
- PNO-III-82-012, on 820126,unit Shutdown from 100% Power for Repair of Condenser Tube Leaks.Unit Expected to Be off-line for 3-7 Days + (02:36:25, 20 December 2024)
- 05000295/LER-1982-001, Forwards LER 82-001/03L-0 + (02:36:26, 20 December 2024)
- ML20040D979 + (02:36:27, 20 December 2024)
- ML20040D980 + (02:36:27, 20 December 2024)
- ML20040D978 + (02:36:28, 20 December 2024)
- PNO-III-82-008, on 820115,licensee Issued Stop Work Order on safety-related Electrical Const Activity Due to Improper Implementation of Approved Qa/Qc Program for Electric Raceways.Limited Work to Resume 820119 + (02:36:30, 20 December 2024)
- ML20040D974 + (02:36:32, 20 December 2024)
- ML20040D971 + (02:36:33, 20 December 2024)
- ML20040D969 + (02:36:34, 20 December 2024)
- ML20040D967 + (02:36:35, 20 December 2024)
- ML20040D966 + (02:36:36, 20 December 2024)
- ML20040D962 + (02:36:37, 20 December 2024)
- ML20040D961 + (02:36:38, 20 December 2024)
- IR 05000285/1981030 + (02:36:40, 20 December 2024)
- ML20040D959 + (02:36:41, 20 December 2024)
- ML20040D958 + (02:36:42, 20 December 2024)
- A02085, Responds to NRC Re Violations Noted in IE Insp Rept 50-245/81-02.Corrective Actions:All Work Halted in Reactor Cavity & 108 Ft Elevation of Unit 1 Bldg Until Health Physics Personnel Could Be Retrained + (02:36:43, 20 December 2024)
- ML20040D956 + (02:36:45, 20 December 2024)
- ML20040D954 + (02:36:46, 20 December 2024)
- ML20040D955 + (02:36:46, 20 December 2024)
- ML20040D952 + (02:36:47, 20 December 2024)
- ML20040D951 + (02:36:48, 20 December 2024)
- 05000293/LER-1981-054, Updated LER 81-054/01T-5:on 811230,during Review of IE Bulletin 80-11,Masonry Walls 209.1,184.2 & 184.0 Identified as Being Unstable During Tornado Depressurization Event. Caused by Design & Const Errors.Walls Will Be Modified + (02:36:49, 20 December 2024)
- ML20040D949 + (02:36:50, 20 December 2024)
- ML20040D948 + (02:36:51, 20 December 2024)
- ML20040D946 + (02:36:52, 20 December 2024)
- ML20040D945 + (02:36:52, 20 December 2024)
- IR 05000382/1981025 + (02:36:55, 20 December 2024)
- ML20040D938 + (02:36:56, 20 December 2024)
- IR 05000245/1981002 + (02:36:57, 20 December 2024)
- IR 05000352/1981015 + (02:36:59, 20 December 2024)
- ML20040D933 + (02:37:04, 20 December 2024)
- W3P82-0184, Forwards Latest Submittal Schedule for Remainder of SER Open Items + (02:37:08, 20 December 2024)
- IR 05000313/1981029 + (02:37:11, 20 December 2024)
- ML20040D928 + (02:37:13, 20 December 2024)
- ML20040D927 + (02:37:14, 20 December 2024)
- 05000298/LER-1981-025-04, /04T-0:on 811224,during Full Power,Discharge Was Made from Floor Drain Sample Tank W/O Adequate Sampling & Analysis of Batch.Caused by Personnel Error.Liquid Discharge Procedures Being Revised.Personnel Reprimanded + (02:37:16, 20 December 2024)
- ML20040D925 + (02:37:17, 20 December 2024)
- IR 05000156/1981002 + (02:37:19, 20 December 2024)
- ML20040D923 + (02:37:20, 20 December 2024)
- ML20040D921 + (02:37:21, 20 December 2024)
- 05000298/LER-1981-025, Forwards LER 81-025/04T-0.Detailed Event Analysis Encl + (02:37:22, 20 December 2024)