Forwards Third Status Rept Re Prompt Notification Sys. Progress Identified Through 820122 Re Upgrading Siren Sys in 10-mile Surrounding Area.Assembly,Installation & Testing Completed for 29 of 42 Locations.Next Rept Expected 820129
ML20040D954
Person / Time
Site: Davis Besse 
Issue date: 01/22/1982
From: Crouse R
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
1-243, NUDOCS 8202020431
Download: ML20040D954 (4)


Text

__

I d-O S

c3 Docket No. 50-346 RECSVW TOiEDO FEB 1 1982

Serial No. 1-243 c,

N 7 '"

/f Rom P. CnouSE vr m w Nuclear January 22, 1982 f>

uim asSsaas

/PRTECIDAY. STAIF 6IR EZ}3 v

i i

Mr. James G. Keppler, Director

'/D i

'[

United States Nuclear Regulatory Commission 3/3 igjn,_

Region III "I

l l

799 Roosevelt Road 2

Glen Ellyn, Illinois 60137 aE&TI l l

-f-l ' dP&O

-ile

Dear Mr. Keppler:

g Attached is Toledo Edison's third st atus report concerning the Prompt Notification System (PNS) surrourding the Davis-Besse Nuclear Power Station Unit No. 1.

This report identifies the progress made th-ough January 22, 1982 relative to upgrading the siren system in the.J-mile surrounding area. The first and second status reports were dated January 8, 1982 (Serial No. 1-236) and January 15, 1982 (Serial No. 1-240),

respectively.

As indicated on the attached, final approval has been received for all right-of-way locations. Assembly, installation and growl testing have been completed for 29 of the 42 siren locations.

Although all siren equipment has been received, it was discovered during installation that three control boxes required to complete installation were not delivered.

It is still anticipated that installation of the sirens will be complete by February 1 unless adverse weather conditions or delayed delivery of the control boxes impact the schedule.

As noted in our previous letter dated January 15, 1982 (Serial No. 1-240),

the PNS also includes 22 Tone Alert Radios which were operational in early December 1981.

Route alerting is continuing in areas where sirens are not fully installed and operational.

The next progress report on the PNS is currently scheduled for January 29, i

1982.

Very truly yours,

$f

^=

RPC:DMG: lab e/10 attachment M 27 E cc: DB-1 NRC Resident Inspector THE TOLEDO EDISON r'nupauv cnienmi <u a ' a 300 MADISON AVENUE TOLEDO, OHIO 43652 C

8202020431 820122 y8 l PDR ADOCK 05000346 I

/

F PDR

Page 1 of 3

/

TABLE 1: SIREN STATUS AS OF JANUARY 22, 1982 Siren Siren Assembly Location Approval of Location and Installation Number Right-of-Way at Location

-Comments 1

X X

Initial System 2

X X

Initial System 3

X X

Initial System 4

X X

Initial System 5

X X

(note 1) 6 X

X (note 1) 7 X

X (note-1) 8 X

X (note 1) 9 X

X (note 1) 10 X

X (note 1)'

~

11 X

(note 2) 12 X

(note 2)

Ohio Edison Territory 13 X

(note 2)

Ohio Edison Territory 14 X

(note 2)

Ohio Edison Territory 15 X

(note 2)

Ohio Edison Territory 16 X

(note 2)

Ohio Edison Territory 17 X

X (note 1) 18 X

Partial 19 X

X (note 1) 20 X

X (note 1) 21 X

X (note 1) j

g P.ga 2 of'3' a

TABLE 1: SIREN STATUS AS OF JANUARY 22, 1982 (Continued)

Siren Siren Assembly Location Approval of Location and Installation Number Right-of-Way at Location Comments 22 X

X (note 1)'

23 X

X (note 1) 24 X

Partial 25 X

X (note 1) 26 X

X (note 1) 27 X

X (note 1) 28 X

X' (note 1) 29 X

X-(note 1) 30 X (note 3)

Partial 31 X

X (note 1)

)

32 Location deleted due to wildlife refuge and limited popul-ation within coverage area. Consistent with NUREG-0654 criteria of Section B, Appendix 3.

l 33 X

Partial 34 X

(note 2) 35 X

Partial 36 X

X (note 1) 37 X

X (note 1) 38 X

X (note 1) j e

L

.g Page 3 of 3 TABLE.1: SIREN STATUS.

AS OF JANUARY.22, 1982

-(Continued)

Siren.

Siren Assembly Location Approval.of Location and Installation Number Right-of-Way at Location-Comments 39 X

Partial 40 X

X (note 1) 41 X

X (note 1) 42 X

X (note 1) 43 X

X (note 1)

NOTE 1: Growl Testing Completed

- NOTE 2: Pole Installation Completed NOTE 3: Although initial location of pole approved and installed, relocation may be required.