Text
I k
.m
'JAN 2 7199[
12 Reply Refer To:
Docket: 50-285 0
A G
nyr:
,,,EO Omaha Public Power District
-9 EEB yIU2A ~U ATTN:
W. C. Jones Division Manager -
Production Operations f'.
3 1623 Harney Street
_4 8
Omaha, Nebraska 68102
%, L t tY\\
Q Gentlemen:
i
Subject:
Fort Calhoun Station Early Warning System This letter is to acknowledge receipt of your letter dated December 31,1981.
It is sqy understanding that your Early Warning System is installed, has been tested, and that the State and local agencies are being formally notified.
Sincerely, Gripal s,gned tat
& Seytnt John T. Collins Regional Administrator i
eentlS. C. Stevens, Manager.
Fort Calhoun Station I
P. O. Box 399 Fort Calhoun, Nebraska 68102 bcc to DMB:
(IE35) bec distrib. to RIV:
RESIDENT INSPECTOR SECTION CHIEF l
KANSAS STATE DEPT OF HEALTH NEBRASKA STATE DEPT OF HEALTH J. COLLINS, RIV l
C. HACKNEY, RIV l
l h$hkb 0
F i[}{
'j)b..
"b' o'nc'>.EC%{.......
...D
..RA-RIV
~-
Sua"^"'>.CAhackney.:g)..KVSay.fcf t..
...JTCol l Ins -
3"'
^ " > J/26/82...
..145/.82......1/al/82......
~ " " " "
... ~. ~...
l Nac ronu ais no,soisacu o24o OFFICIAL RECORD COPY
. 4 s_
~
g.
Omaha Public Power District' ThLEPHONE 536 4000 ARE A CODE 402 1623 HARNEY 8 OMAHA. NEBRASMA 68102 8 December 31, 1 1
s Mr. J. T. Collins, Administrator U. S. Nuclear Regulatory Commission Region.IV 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76011
Reference:
Docket No. 50-285 s
s.
s
Dear Mr. Collins:
Omaha Public Power District's letter to the Nuclear Regulatory
. Commission dated July 24, 1981 identified the District's schedule for installation of a radio-activated siren system for alerting the general public within the EPZ.
The system installation is now complete. All sirens are in-place and testing is complete. Testing included full circuit continuity'and response checks of each siren, including radio-
~
activation.
Each siren has been individually sounded for its full three minute cycle.
State and local agencies are being forrally,r.otified of the system's operability.
Since ly, N, y w i.
W. C.'.ones Divisi.on Manager Production Operations WCJ/KJM/TLP:jmm cc:
LeBoeuf, Lamb fleiby & MacRae 1333 New Hampshire Avenue, N.W.
Washington, D.C.
20036 s
\\
\\
\\
s
.g ig
\\
14
' ~