_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

6 I OUISIANA 24a octAnoNot stater POWER & L1GHT P O BOX 0008. NEW ORLEANS. tOUISIANA 70174. (5041 366 2345 wowsau January 25, 1982 W3P82-0184 Q-3-A29 3-A1.01.04 Mr. D. G. Eisenhut, Director Division of Licensing g

<!(c, g,m g

U. S. Nuclear Regulatory Commission s7 Mg Lg 6

Washington, D. C. 20555 pUOJ s

h

SUBJECT:

Waterford 3 SES 3

Docket No. 50-382 g

SER Open Item Response Schedule 4

REFERENCE:

Letter W3P81-2199 From L. V. Maurin to D. G. Eisenhut dated October 27, 1981

Dear Sir:

The referenced letter transmitted to you the submittal schedule for SER open items. Please find enclosed the latest schedule for the remainder of the open items as listed in SSER 2.

Yours very truly,

'M G L. V. Maurin Vice President Nuclear Operations LVM/nw cc:

E. L. Blake W. M. Stevenson 9/

S. Black j

/ '

0202020412 820125 PDR ADOCK 05000382 E

PDR

7 SER OPEN ITEM SUBMITTAL SCHEDULE OPEN ITEM STATUS / SUBMITTAL DATE 1.

Fire Protection Under Staff Review Fire Damper Study 11/16/81 Safe Shutdown Analysis 12/21/81

2.. PSI /ISI Program Plan 4/5/82 Reg. Guide 1.150 Comparison 4/15/82 3.

Emergency Planning 6/82 4.

Environmental Qualifications Awaiting Staff Audit /12/24/81 4

5.

Seismic Qualifications Awaiting Staff Audit 6.

RCP Shaft Break Analysis 1/27/82 7.

Thermal Hydraulic Design Final Grid Spacer Design 1/30/82 Future Cycles Under Staff Review /9/22/81' CPC Algorithm 3/82 Test Data 6/82 8.

Turbine Missiles 2/26/82 9.

Indemnity Requirements Confirmatory /9/16/81 10.

Site Hazards (explosion) 4/30/82 11.

License Qualifications Staff Review / Ongoing 12.

TMI a)

Emergency Procedures Before Fuel Load b) Control Room Review (I.D.I.)

7/1/82 c) Containment System Design (II.E.4.2) 3/82 d) ICC Instrumentation (II.F.2)

System Description

1/27/82 l

<