Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19290C831 + (14:38:27, 2 January 2025)
- ML19290C830 + (14:38:28, 2 January 2025)
- ML19290C824 + (14:38:29, 2 January 2025)
- ML19290C821 + (14:38:30, 2 January 2025)
- ML19290C818 + (14:38:31, 2 January 2025)
- ML19290C817 + (14:38:32, 2 January 2025)
- ML19290C816 + (14:38:33, 2 January 2025)
- ML19290C815 + (14:38:34, 2 January 2025)
- ML19290C814 + (14:38:35, 2 January 2025)
- ML19290C813 + (14:38:36, 2 January 2025)
- ML19290C811 + (14:38:37, 2 January 2025)
- ML19290C807 + (14:38:38, 2 January 2025)
- ML19290C804 + (14:38:40, 2 January 2025)
- ML19290C791 + (14:38:41, 2 January 2025)
- ML19290C798 + (14:38:41, 2 January 2025)
- ML19290C790 + (14:38:43, 2 January 2025)
- ML19290C784 + (14:38:44, 2 January 2025)
- ML19290C781 + (14:38:45, 2 January 2025)
- ML19290C778 + (14:38:46, 2 January 2025)
- ML19290C780 + (14:38:46, 2 January 2025)
- ML19290C777 + (14:38:47, 2 January 2025)
- ML19290C776 + (14:38:48, 2 January 2025)
- ML19290C775 + (14:38:49, 2 January 2025)
- ML19290C774 + (14:38:50, 2 January 2025)
- ML19290C753 + (14:38:51, 2 January 2025)
- ML19290C741 + (14:38:52, 2 January 2025)
- ML19290C734 + (14:38:53, 2 January 2025)
- 05000278/LER-1980-001-03, /03L-0:on 800106,during Surveillance Tests,Main Steam Line Radiation Monitor D Failed to Actuate hi-hi Trip to Initiate Channel B one-half Scram & Group 1 Isolation. Cause Unknown.Monitor Replaced + (14:38:54, 2 January 2025)
- ML19290C732 + (14:38:55, 2 January 2025)
- ML19290C714 + (14:38:56, 2 January 2025)
- ML19290C713 + (14:38:57, 2 January 2025)
- PNO-III-79-006, on 791226,St Louis Load Dispatcher for Facility Received Bomb Threat Re 2,000 Lb Tnt Set to Explode in Facility.Site Security Director Notified & Six Personnel Evacuated.Work Resumed After Detonation Time Elapsed + (14:38:59, 2 January 2025)
- PNO-I-79-044, on 791221,contractor Worker Received Cut on Back of Head.Caused by Worker Slipping While Climbing Ladder W/Safety Belt Disconnected & Falling on Grating.No Contamination of Worker Detected + (14:39:01, 2 January 2025)
- ML19290C710 + (14:39:03, 2 January 2025)
- PNO-IV-79-018, on 791130,util QA Manager Notified Region 4 of Industrial Accident.Carpenter Fell About 15 Ft Into Empty Spent Fuel Pool While Dismantling Temporary Railing Around Pool + (14:39:05, 2 January 2025)
- PNO-III-79-066A, on 800122,update Submitted Re Broken Reactor Vessel Anchor Bolts at Facility.Bolts Broke Due to Stress Corrosion Cracking in Conjunction W/Potential Substd Mechancial Properties of Bolts + (14:39:07, 2 January 2025)
- PNO-I-80-013, on 800122,local Boilermaker Union Formed Picket Line to Protest Not Being Awarded Contract to Retube Plant Main Condenser.Grievance Resulted in Slashed Tires & Threat to Maint Supervisor.Alternative Entrance Opened + (14:39:09, 2 January 2025)
- PNO-II-80-013, on 800121,small Smouldering Fire in Cable Tray Beneath Turbine Bldg Operating Floor Was Detected & Extinguished.Cause Is Being Investigated.Damaged Insulation on Two Power Cables Will Be Repaired + (14:39:11, 2 January 2025)
- PNO-II-80-012, on 800121,while Quarterly Inservice Insp Valve Cycling Tests Being Performed,Unidentified RCS Sys Leakage Increased Suddenly from 0.2 Gpm to 3.04 Gpm.Probably Caused by Blown First Set of Valve Packing + (14:39:13, 2 January 2025)
- ML19290C703 + (14:39:15, 2 January 2025)
- PNO-I-79-037, on 791216,estimated 79.3 Ci Xenon & Krypton Released from Stack.Caused by Primary Coolant Venting to Stack Due to Rupture of Relief Disc.Rupture Caused by Boron Recovery Sys Overpressurizing + (14:39:17, 2 January 2025)
- PNO-III-80-001, on 791231,facility Was Shut Down.Caused by Need to Complete Changes Necessary to Meet Requirements of NUREG-0578.Changes Expected to Be Completed by Weekend of 800112 at Which Time Facility Will Resume Operation + (14:39:19, 2 January 2025)
- PNO-III-80-004, on 800102,licensee Notified Resident Inspector That Sodium Hydroxide Addition to Unit 1 Containment Spray Sys Was Valved Out of Svc.Unit 2 Was Shutdown for Refueling & Unit 1 Valves Were Closed in Error + (14:39:21, 2 January 2025)
- PNO-III-79-054A, on 791204,licensee Continued Investigation Re Misposition of Core Spray Sys Suction Valves.Appears Action Was Deliberate Act by Plant Personnel.Fbi Involvement Anticipated + (14:39:27, 2 January 2025)
- ML19290C697 + (14:39:28, 2 January 2025)
- PNO-III-79-057A, radioactive Liquid Released Into Ms River. Caused by Diffuser Gate Partially Opened Allowing Portion of Canal Discharge to Flow Into River.Plans to Clean Sys & Release Contents Per Requirements + (14:39:30, 2 January 2025)
- PNO-III-79-060, on 791211,condenser Air Ejector Monitor Showed Small Step Increase,Then Climbed Slowly,Indicating Primary to Secondary Leakage of 260 Gpd.Cause Not Stated. Examination of Tube Sheet Will Be Performed + (14:39:32, 2 January 2025)
- PNO-III-79-062, on 791207,atty for Former Kerr-Mcgee Nuclear Corp Employee Requested Examination to Determine Whether Client Received Significant Intake of Pu During 1969-1972 at Cimarron Plant + (14:39:34, 2 January 2025)
- PNO-I-79-041, on 791220,approx 1,000 Fish Were Collected After Being Backwashed from Traveling Screens.Situation Being Evaluated by Biologist from Corp Ofc.Cause Not Stated + (14:39:36, 2 January 2025)
- PNO-III-79-068, on 791228,licensee Reported That Gaps Between RCS Hot Leg Piping & Six of 12 Pipe Whip Restraints Not in Accordance W/Assumption Used in RCS Piping Seismic Analysis.Cause Not Stated + (14:39:38, 2 January 2025)
- PNO-II-80-004, on 800107,three Biologists Drowned While Taking Water Samples from Lake Norman,Nc.Two Bodies Recovered 800109.News Release Was Issued + (14:39:40, 2 January 2025)