Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000327/LER-1980-011, Forwards LER 80-011/01T-0 + (08:51:08, 2 January 2025)
- ML19309A902 + (08:51:09, 2 January 2025)
- ML19309A900 + (08:51:10, 2 January 2025)
- ML19309A899 + (08:51:11, 2 January 2025)
- ML19309A898 + (08:51:12, 2 January 2025)
- 05000321/LER-1980-025-03, /03L-0:on 800301,during Normal Operation,Reactor Core Isolation Cooling Pump Discharge Flow Switch Found Out of Spec.Caused by Instrument Drift.Barton Model 289A Flow Switch Recalibr + (08:51:13, 2 January 2025)
- 05000327/LER-1980-012-03, /03L-0:on 800301,during Initial Core Loading,Rhr Flow Secured or Throttled Above Tech Specs.Caused by Intentional Increase to Allow Placement of Fuel Assemblies Near Loop 4 Hot Leg + (08:51:15, 2 January 2025)
- 05000321/LER-1980-025, Forwards LER 80-025/03L-0 + (08:51:17, 2 January 2025)
- ML19309A893 + (08:51:18, 2 January 2025)
- ML19309A892 + (08:51:19, 2 January 2025)
- ML19309A890 + (08:51:20, 2 January 2025)
- ML19309A891 + (08:51:20, 2 January 2025)
- ML19309A889 + (08:51:21, 2 January 2025)
- 05000327/LER-1980-012, Forwards LER 80-012/03L-0 + (08:51:22, 2 January 2025)
- ML19309A885 + (08:51:23, 2 January 2025)
- TAC:44632 + (08:51:24, 2 January 2025)
- ML19309A883 + (08:51:24, 2 January 2025)
- ML19309A882 + (08:51:25, 2 January 2025)
- 05000259/LER-1980-020-03, /03L-0:on 800301,during Normal Operation,W/High Winds & Freezing Rain,Trinity Offsite 161-kV Power Source Was Lost Intermittently.Caused by Ice Loading & High Winds Requiring Operation of Line Protective Relay + (08:51:27, 2 January 2025)
- A800010, Forwards Semiannual Operating Rept,Radioactive Effluents, Jul-Dec 1979 + (08:51:28, 2 January 2025)
- ML19309A880 + (08:51:28, 2 January 2025)
- 05000263/LER-1980-015, Forwards LER 80-015/01T-0 + (08:51:31, 2 January 2025)
- 05000259/LER-1980-020, Forwards LER 80-020/03L-0 + (08:51:33, 2 January 2025)
- ML19309A874 + (08:51:34, 2 January 2025)
- 05000318/LER-1980-010-03, /03L-0:on 800224,during Surveillance Testing, Control Element Assemblies 31 & 34 Dropped Into Core.Caused by Fault in Timer Module.Module Replaced + (08:51:35, 2 January 2025)
- ML19309A872 + (08:51:36, 2 January 2025)
- ML19309A871 + (08:51:37, 2 January 2025)
- ML19309A870 + (08:51:38, 2 January 2025)
- 05000327/LER-1980-007-01, /01T-0:on 800315,following Initial Core Loading, Found Incorrect (Nonconservative) Valve Operator Weights Used in Seismic Analysis for Component Cooling Water Valves FCV-70-133,134 & 183.Caused by Incorrect Vendor Data + (08:51:40, 2 January 2025)
- 05000318/LER-1980-010, Forwards LER 80-010/03L-0 + (08:51:42, 2 January 2025)
- 05000327/LER-1980-007, Forwards LER 80-007/01T-0 + (08:51:45, 2 January 2025)
- 05000336/LER-1980-006-03, /03L-0:on 800310,w/charging Pump B Inoperable for Replacement,Charging Pump C Placed Out of Svc to Replace Failed Pump Packing.Caused by Natural end-of-life of Packing Due to Wear.Pump Packing Replaced + (08:51:48, 2 January 2025)
- ML19309A858 + (08:51:49, 2 January 2025)
- ML19309A857 + (08:51:50, 2 January 2025)
- 05000336/LER-1980-006, Forwards LER 80-006/03L-0 + (08:51:51, 2 January 2025)
- ML19309A854 + (08:51:52, 2 January 2025)
- 05000336/LER-1980-007-03, /03L-0:on 800227,during Reactor Plant Startup, Condensate Storage Tank Level Fell Below Tech Spec Limit for Less than 30 Minutes.Caused by Excessive Water Demand from Blowdown & Regeneration Requirements + (08:51:54, 2 January 2025)
- ML19309A852 + (08:51:55, 2 January 2025)
- ML19309A850 + (08:51:59, 2 January 2025)
- ML19309A849 + (08:51:59, 2 January 2025)
- ML19309A848 + (08:52:00, 2 January 2025)
- ML19309A847 + (08:52:01, 2 January 2025)
- 05000336/LER-1980-007, Forwards LER 80-007/03L-0 + (08:52:02, 2 January 2025)
- ML19309A843 + (08:52:04, 2 January 2025)
- ML19309A844 + (08:52:04, 2 January 2025)
- 05000327/LER-1980-003-01, /01T-0:on 800310,following Initial Fuel Loading, Flow Through Auxiliary Bldg Exhaust Sampler Not Maintained for 3.25-h.Caused by Misunderstanding of Tech Specs. Personnel Reinstructed in Applicable Requirements + (08:52:06, 2 January 2025)
- 05000324/LER-1980-038-03, /03L-0:on 800229,while Terminating Wire to Contact 3 on Relay 52AX,recirculation Pump M/G Set Tripped.Caused by de-energizing of Relay When Connection Was Made for Safety. Special Procedure Was Revised & Test Sucessfully Com + (08:52:08, 2 January 2025)
- 05000327/LER-1980-003, Forwards LER 80-003/01T-0 + (08:52:09, 2 January 2025)
- ML19309A838 + (08:52:11, 2 January 2025)
- ML19309A836 + (08:52:12, 2 January 2025)
- ML19309A834 + (08:52:12, 2 January 2025)