Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000267/LER-1980-011-03, /03L-0:on 800306-21,reactor Dewpoint Limiting Conditions for Operation Were Exceeded on One Occasion & Operation in Degraded Mode Occurred on Three Occasions. Caused by Problems W/Buffer Helium Sys + (08:31:13, 2 January 2025)
- ML19309C372 + (08:31:14, 2 January 2025)
- ML19309C371 + (08:31:15, 2 January 2025)
- 05000317/LER-1980-002-04, /04T-0:on 800322,instantaneous Hourly Average for Condenser Temp Rise Observed in Excess of Tech Spec Limit. Caused by Operator Inattention to Temp Rise Across Condenser & Environ Conditions + (08:31:16, 2 January 2025)
- ML19309C368 + (08:31:17, 2 January 2025)
- 05000267/LER-1980-011, Forwards LER 80-011/03L-0 + (08:31:19, 2 January 2025)
- ML19309C365 + (08:31:20, 2 January 2025)
- ML19309C364 + (08:31:21, 2 January 2025)
- 05000317/LER-1980-002, Forwards LER 80-002/04T-0 + (08:31:22, 2 January 2025)
- ML19309C360 + (08:31:23, 2 January 2025)
- ML19309C359 + (08:31:24, 2 January 2025)
- 05000029/LER-1980-009-03, /03L-0:on 800307,during Maint Outage in Mode 5 While Performing Safety Injection Time Delay Verification procedure,TDC2 Setpoint Found Out of Tech Spec Limit.Caused by Setpoint Drift.Relay Adjusted to within Tech Spec Limit + (08:31:26, 2 January 2025)
- ML19309C357 + (08:31:27, 2 January 2025)
- ML19309C355 + (08:31:27, 2 January 2025)
- ML19309C353 + (08:31:28, 2 January 2025)
- 05000029/LER-1980-009, Forwards LER 80-009/03L-0 + (08:31:29, 2 January 2025)
- 05000318/LER-1980-013-03, /03L-0:on 800303,channel Zf Pressure Input Signal for Steam Generator Isolation 22 Was Bypassed.Caused by Signal Isolater 2-E/E-1023C Being Out of Calibr Due to Nonlinear Response + (08:31:31, 2 January 2025)
- 05000133/LER-1980-002-03, /03L-0:on 800310,while in Cold Shutdown for Refueling & Seismic Mods,Fossil Unit Trip Test Was Not Performed within Allowable Interval.Caused by Present Status Being Unresolved.Test Will Be Performed Prior to Startup + (08:31:33, 2 January 2025)
- ML19309C348 + (08:31:34, 2 January 2025)
- 05000133/LER-1980-002, Forwards LER 80-002/03L-0 + (08:31:37, 2 January 2025)
- 05000318/LER-1980-013, Forwards LER 80-013/03L-0 + (08:31:39, 2 January 2025)
- ML19309C342 + (08:31:40, 2 January 2025)
- 05000155/LER-1980-005-03, /03L-0:on 800301,following Several Intermittent Automatic Test Circuit Alarms,Sensor Channel D of Reactor Depressurizing Sys Removed from Svc.Caused by Setpoint Drift on Transmitter LT-3183.Transmitter Vented & Returned to S + (08:31:43, 2 January 2025)
- ML19309C338 + (08:31:44, 2 January 2025)
- ML19309C337 + (08:31:48, 2 January 2025)
- 05000155/LER-1980-005, Forwards LER 80-005/03L-0 + (08:31:49, 2 January 2025)
- ML19309C334 + (08:31:50, 2 January 2025)
- 05000324/LER-1980-023-01, /01T-0:on 800319,during Liquid Penetrant Test of Reducing Insert for 2B Reactor Recirculation Pump,Linear Indication Was Found at Toe of Weld Between Reducer & Nipple.Cause Unknown.Analysis Planned + (08:31:54, 2 January 2025)
- ML19309C332 + (08:31:55, 2 January 2025)
- ML19309C331 + (08:31:57, 2 January 2025)
- 05000324/LER-1980-023, Forwards LER 80-023/01T-0 + (08:32:01, 2 January 2025)
- ML19309C327 + (08:32:02, 2 January 2025)
- 05000325/LER-1980-021, Forwards LER 80-021/03L-0 + (08:32:03, 2 January 2025)
- IR 05000213/1980002 + (08:32:05, 2 January 2025)
- ML19309C322 + (08:32:06, 2 January 2025)
- ML19309C321 + (08:32:07, 2 January 2025)
- ML19309C320 + (08:32:08, 2 January 2025)
- ML19309C319 + (08:32:09, 2 January 2025)
- ML19309C318 + (08:32:10, 2 January 2025)
- ML19309C316 + (08:32:11, 2 January 2025)
- ML19309C315 + (08:32:12, 2 January 2025)
- ML19309C314 + (08:32:13, 2 January 2025)
- ML19309C312 + (08:32:14, 2 January 2025)
- ML19309C311 + (08:32:15, 2 January 2025)
- ML19309C310 + (08:32:16, 2 January 2025)
- ML19309C309 + (08:32:17, 2 January 2025)
- ML19309C306 + (08:32:18, 2 January 2025)
- ML19309C308 + (08:32:18, 2 January 2025)
- ML19309C305 + (08:32:19, 2 January 2025)
- 05000267/LER-1980-010-03, /03L-0:on 800303,at 10% Thermal Power,A Emergency Diesel Generator Would Not Load as Required for Weekly 50% Load Test Surveillance.Caused by Diesel Generator Governor Problem Which Reduced Speed Control Response + (08:32:22, 2 January 2025)
- ML19309C303 + (08:32:26, 2 January 2025)