Forwards IE Insp Rept 50-213/80-02 on 800122-25.No Noncompliance Noted
ML19309C322
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 02/19/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML19309C323 List:
References
NUDOCS 8004080448
Download: ML19309C322 (2)


See also: IR 05000213/1980002

Text

O

s*

Wh

p gg

UNITED STATES

f

o

NUCLEAR REGULATORY COMMISSION

[

R EGION I

o

lI

g

431 PARK AVENUE

f

KING OF PRUS$l A. PENNSYL.VANIA 19404

(

,/

FEB 19 1980

++...

Docket No. 50-213

Connecticut Yankee Atomic Power Company

,

ATTN: Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection 50-213/80-02

This refers to the inspection conducted by Mr. D. Johnson of this office on

!

January 22-25, 1980, at the Haddam Neck Plant, of activities authorized by NRC

License No. DPR-61 and to the discussions of our findings held by Mr. Johnson

with Mr. Graves of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

.

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790.

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in the Public

Document Room.

Cl&

h04080 %

.

.

.

Connecticut Yankee Atomic Power

2

FEB 191980

Company

No reply to this letter is required; however, if you should have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

f

}:

-

E

n J. Brunner, Chief

R ctor Operations and Nuclear

$upport Branch

Enclosure:

Office of Inspection and Enforcement Inspection

>

Report Number 50-213/80-02

cc w/ encl:

R. Graves, Plant Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Engineer

,