ML19309C322
| ML19309C322 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 02/19/1980 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML19309C323 | List: |
| References | |
| NUDOCS 8004080448 | |
| Download: ML19309C322 (2) | |
See also: IR 05000213/1980002
Text
O
s*
Wh
p gg
UNITED STATES
f
o
NUCLEAR REGULATORY COMMISSION
[
R EGION I
o
lI
g
431 PARK AVENUE
f
KING OF PRUS$l A. PENNSYL.VANIA 19404
(
,/
FEB 19 1980
++...
Docket No. 50-213
Connecticut Yankee Atomic Power Company
,
ATTN: Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection 50-213/80-02
This refers to the inspection conducted by Mr. D. Johnson of this office on
!
January 22-25, 1980, at the Haddam Neck Plant, of activities authorized by NRC
License No. DPR-61 and to the discussions of our findings held by Mr. Johnson
with Mr. Graves of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
.
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section
2.790.
The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified period, the report will be placed in the Public
Document Room.
Cl&
h04080 %
.
.
.
Connecticut Yankee Atomic Power
2
FEB 191980
Company
No reply to this letter is required; however, if you should have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
f
}:
-
E
n J. Brunner, Chief
R ctor Operations and Nuclear
$upport Branch
Enclosure:
Office of Inspection and Enforcement Inspection
>
Report Number 50-213/80-02
cc w/ encl:
R. Graves, Plant Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer
,
f-
i
.