Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000366/LER-1980-039-01, /01X-1:on 800411,during Normal Operation,Psw & RHR-SW Pump Motor Cooling Water Supply Did Not Meet Single Failure Criterion.Caused by Design Not Specifying Divisional Cooling Water Supply to Pumps + (07:21:18, 2 January 2025)
- ML19309H183 + (07:21:19, 2 January 2025)
- ML19309H182 + (07:21:20, 2 January 2025)
- IR 05000315/1980005 + (07:21:24, 2 January 2025)
- ML19309H180 + (07:21:25, 2 January 2025)
- ML19309H178 + (07:21:26, 2 January 2025)
- 05000366/LER-1980-039, Forwards LER 80-039/01X-1 + (07:21:27, 2 January 2025)
- ML19309H175 + (07:21:32, 2 January 2025)
- ML19309H174 + (07:21:40, 2 January 2025)
- ML19309H172 + (07:21:41, 2 January 2025)
- ML19309H171 + (07:21:43, 2 January 2025)
- 05000321/LER-1980-033-03, /03L-0:on 800402,while Inspecting CST Access Stairway,Cold Joint Between Original Base Slab & Added Slab for Retaining Walls Lacked Watertight Seal.Caused by Const Oversight.Maint Request Issued + (07:21:45, 2 January 2025)
- ML19309H169 + (07:21:45, 2 January 2025)
- 05000321/LER-1980-033, Forwards LER 80-033/03L-0 + (07:21:47, 2 January 2025)
- ML19309H166 + (07:21:48, 2 January 2025)
- ML19309H165 + (07:21:49, 2 January 2025)
- PNO-IV-80-017, site QA Supervisor Notified Resident Inspector of Mechanical Electrical Auxiliary Bldg Tilt.Possibly Caused by Heavier Loading of North End During Const.Condition Will Probably Be Corrected When Uniform Loading Is Achieved + (07:21:51, 2 January 2025)
- ML19309H160 + (07:21:53, 2 January 2025)
- ML19309H159 + (07:21:54, 2 January 2025)
- ML19309H157 + (07:21:55, 2 January 2025)
- ML19309H152 + (07:22:05, 2 January 2025)
- 05000368/LER-1980-018, Forwards LER 80-018/03L-0 + (07:22:06, 2 January 2025)
- 05000338/LER-1980-038-03, /03L-0:on 800409,during Power Escalation,Axial Flux Difference Deviated Greater than Limit for three-minute Duration.Caused by Overinsertion of Control Rods Resulting from Continued Dilution During Hold in Power Escalation + (07:22:09, 2 January 2025)
- ML19309H148 + (07:22:10, 2 January 2025)
- 05000346/LER-1980-032-03, /03L-0:on 800406,inboard Bearing Oil Sight Glass of Containment Spray Pump 1-2 Found Shattered.Pump Declared Inoperable.Oil Sight Glass Accidentally Broken by Const Activities in Area.Sight Glass Replaced & New Oil Added + (07:22:11, 2 January 2025)
- 05000338/LER-1980-038, Forwards LER 80-038/03L-0 + (07:22:17, 2 January 2025)
- 05000321/LER-1980-038-03, /03L-0:on 800327,while Performing Reactor Protection Sys Surveillance HNP-1-3456,output Breaker of a Reactor Motor Generator Tripped & Would Not Reset.Caused by Mechanical Reset Latch Failing to Reset.Breaker Replaced + (07:22:19, 2 January 2025)
- 05000346/LER-1980-032, Forwards LER 80-032/03L-0 + (07:22:20, 2 January 2025)
- 05000321/LER-1980-039-01, /01T-0:on 800411,discovered That Psw & RHR-SW Pump Motor Cooling Water Supply Did Not Meet Single Failure Criterion.Caused by Initial Design Not Specifying Divisional Water Cooling Water Supply to Pumps + (07:22:22, 2 January 2025)
- 05000321/LER-1980-038, Forwards LER 80-038/03L-0 + (07:22:24, 2 January 2025)
- 05000321/LER-1980-039, Forwards LER 80-039/01T-0 + (07:22:26, 2 January 2025)
- 05000338/LER-1980-027-99, /99X-0:on 800220,during Reactor Trip from 100% Power,Abnormal Noise in C Steam Generator Detected by Installed Loose Parts Monitoring Sys.Cause Unknown. Westinghouse Personnel Called in to Conduct Investigation + (07:22:28, 2 January 2025)
- 05000338/LER-1980-027, Forwards LER 80-027/99X-0 + (07:22:31, 2 January 2025)
- 05000366/LER-1980-058-01, /01T-0:on 800416,while Performing 18-month Surveillance Procedure HNP-2-3830,discovered Diesel Generator B Output Breaker Would Not Trip Upon Shutdown Signal from Auto Stop Circuitry.Caused by Design Change + (07:22:34, 2 January 2025)
- 05000366/LER-1980-058, Forwards LER 80-058/01T-0 + (07:22:35, 2 January 2025)
- ML19309H130 + (07:22:37, 2 January 2025)
- ML19309H128 + (07:22:38, 2 January 2025)
- 05000346/LER-1980-031-03, /03L-0:on 800406,shift Supervisor Determined That Weekly Test ST 5080.01,independent Offsite Ac Sources Lined Up & Available Failed to Meet Surveillance Requirements When Late Date 800401 Was Missed.Caused by Personnel Error + (07:22:39, 2 January 2025)
- 05000346/LER-1980-031, Forwards LER 80-031/03L-0 + (07:22:40, 2 January 2025)
- ML19309H124 + (07:22:41, 2 January 2025)
- ML19309H120 + (07:22:42, 2 January 2025)
- ML19309H123 + (07:22:42, 2 January 2025)
- 05000333/LER-1980-031-03, /03L-0:on 800405,drywell to Torus Differential Pressure Did Not Meet 1.75 Psi Requirement of Tech Spec. Caused by Rapid Temp Decrease in Sys Cooling Drywell.Reactor Bldg Cooling Water Temp Restored + (07:22:44, 2 January 2025)
- 05000333/LER-1980-031, Forwards LER 80-031/03L-0 + (07:22:45, 2 January 2025)
- ML19309H107 + (07:22:46, 2 January 2025)
- ML19309H105 + (07:22:47, 2 January 2025)
- ML19309H106 + (07:22:47, 2 January 2025)
- ML19309H103 + (07:22:48, 2 January 2025)
- ML19309H104 + (07:22:48, 2 January 2025)
- ML19309H100 + (07:22:49, 2 January 2025)
- ML19309H101 + (07:22:49, 2 January 2025)