IR 05000315/1980005

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-315/80-05 & 50-316/80-04 on 800310-14.No Noncompliance Noted.Areas Inspected:Security Plan & Program Audit,Security Organization & Protected Area Physical Barriers.Details Withheld (Ref 10CFR2.790)
ML19309H181
Person / Time
Site: Cook  
Issue date: 04/11/1980
From: Belanger J, Hind J, Madeda T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19064A068 List:
References
50-315-80-05, 50-315-80-5, 50-316-80-04, 50-316-80-4, NUDOCS 8005090309
Preceding documents:
Download: ML19309H181 (1)


Text

0 0 0500030 Q r-o

,

U.S. NUCLEAR REGULATORY COMMISSION

-

OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

-

Report No. 50-315/80-05; 50-316/80-04 Docket No. 50-315; 50-316 License No. DPR-58; DPR-74 Safeguards Group IV Licensee: American Electric Power Service Corporation Indiana & Michigan Power Company 2 Broadway New York, NY 10004 Facility Name: Donald C. Cook Nuclear Power Plant, Units 1 and 2 Inspection At: Donald C. Cook Site, Bridgman, MI Inspection Conducted: March 10-14, 1980 Date of Last Physical Security Inspection: July 23-27, 1979 Type of Inspection: Unannounced Physical Security Inspectors:

T. J. Madeda

)

4!/'[f0

(Physic 1 Security Specialist (Date)

gJ.L..g ' L langer h

Y, s d

(Physical Security' Specialist)

' (IJate)

1 /

Approved By:

n

-

.

(/J. A. Hind, Chier p (Date)

Safeguards Branch V Inspection Summary Inspection on March 10-14, 1980 (Reports No. 50-315/80-05 and No. 50-316/80-04 Areas Inspected:

Included a review of Security Plan; Security Program Audit; Security Organization; Protected Area Physical Barriers; Vital Area Physical Barriers; Lighting; Access Control (Identification, Author-ization and Badging); Access Control (Search); Access Control (Escorting);

Access Control (Vital Areas); Alarm Stations; Detection Aids; Assessment Aids; Communications; Testing and Maintenance; Compensatory Measures; Power Supply; Response; Locks, Keys, and Combinations; Records and Reports; Fol-lowup on Previous Items of Noncompliance / Deviations; Followup on Unresolved Items; and Followup on IE Bulletin No. 79-16. The inspection involved 80 l

inspector-hours onsite by two NRC inspectors.

.. _. _.__._.

_____. _.

. -..._

.... -

.

.