Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19316B154 + (03:23:32, 2 January 2025)
- ML19316B153 + (03:23:32, 2 January 2025)
- ML19316B152 + (03:23:33, 2 January 2025)
- ML19316B150 + (03:23:35, 2 January 2025)
- ML19316B151 + (03:23:35, 2 January 2025)
- ML19316B149 + (03:23:36, 2 January 2025)
- ML19316B148 + (03:23:38, 2 January 2025)
- ML19316B147 + (03:23:39, 2 January 2025)
- ML19316B146 + (03:23:42, 2 January 2025)
- ML19316B144 + (03:23:43, 2 January 2025)
- ML19316B145 + (03:23:43, 2 January 2025)
- ML19316B143 + (03:23:44, 2 January 2025)
- ML19316B141 + (03:23:44, 2 January 2025)
- 05000265/LER-1980-013-03, /03L-0:on 800428,while Performing LPCI Motor Operated Valve Operability Test & RHR to Suppression Chamber Test,Cooling Valve Mo 2-1001-36A Failed to Close.Caused by Binding of Plunger Arm on Auxiliary Interlock Contacts + (03:23:46, 2 January 2025)
- ML19316B139 + (03:23:47, 2 January 2025)
- ML19316B138 + (03:23:47, 2 January 2025)
- ML19316B137 + (03:23:48, 2 January 2025)
- 05000265/LER-1980-013, Forwards LER 80-013/03L-0 + (03:23:49, 2 January 2025)
- ML19316B134 + (03:23:50, 2 January 2025)
- ML19316B131 + (03:23:51, 2 January 2025)
- ML19316B132 + (03:23:51, 2 January 2025)
- ML19316B129 + (03:23:53, 2 January 2025)
- ML19316B130 + (03:23:53, 2 January 2025)
- ML19316B127 + (03:23:54, 2 January 2025)
- ML19316B126 + (03:23:55, 2 January 2025)
- ML19316B125 + (03:23:56, 2 January 2025)
- ML19316B123 + (03:23:57, 2 January 2025)
- ML19316B124 + (03:23:57, 2 January 2025)
- ML19316B121 + (03:23:59, 2 January 2025)
- ML19316B119 + (03:24:00, 2 January 2025)
- ML19316B118 + (03:24:01, 2 January 2025)
- ML19316B117 + (03:24:02, 2 January 2025)
- ML19316B116 + (03:24:02, 2 January 2025)
- 05000265/LER-1980-012-03, /03L-0:on 800428,reactor Water Conductivity Exceeded 10 Umhos/Cm Tech Spec Limit.Caused by Depleted Demineralizers.Unit Shutdown Initiated.Demineralizers Regenerated & Low Conductivity Coolant Added to Reactor + (03:24:04, 2 January 2025)
- ML19316B112 + (03:24:05, 2 January 2025)
- ML19316B113 + (03:24:05, 2 January 2025)
- ML19316B111 + (03:24:06, 2 January 2025)
- 05000270/LER-1980-003, Forwards LER 80-003/01T-0 + (03:24:07, 2 January 2025)
- 05000265/LER-1980-012, Forwards LER 80-012/03L-0 + (03:24:09, 2 January 2025)
- ML19316B106 + (03:24:10, 2 January 2025)
- ML19316B107 + (03:24:10, 2 January 2025)
- ML19316B104 + (03:24:11, 2 January 2025)
- 05000254/LER-1980-011-03, /03L-0:on 800429,main Feed Breaker to MCC 19-1 Tripped.Caused by Excessive Current Trip Time Which Allowed phase-to-phase Short Internal to Be Carried Back to MCC 19-1.Motor & Circuit Breaker Replaced + (03:24:13, 2 January 2025)
- 05000254/LER-1980-011, Forwards LER 80-011/03L-0 + (03:24:15, 2 January 2025)
- ML19316B098 + (03:24:16, 2 January 2025)
- ML19316B099 + (03:24:16, 2 January 2025)
- ML19316B097 + (03:24:17, 2 January 2025)
- ML19316B096 + (03:24:18, 2 January 2025)
- ML19316B095 + (03:24:19, 2 January 2025)
- ML19316B094 + (03:24:20, 2 January 2025)
- 05000327/LER-1980-054-03, /03L-0:on 800509,design Review Revealed Discrepancies Between as-installed Insulation Weights & Those Actually Used During Piping Sys Analysis.Caused by Unavailability of Drawings + (03:24:21, 2 January 2025)
- ML19316B091 + (03:24:22, 2 January 2025)