Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B10016, Updated Rept Re Recirculation Pump Inservice Insp.Requests Postponement of Requirements of Table IWB-2500 Because of Time Required for Obtaining Parts,Tools & Planning for Refueling Outage + (02:02:33, 2 January 2025)
- ML19318A406 + (02:02:34, 2 January 2025)
- 05000327/LER-1980-068, Forwards LER 80-068/01T-0 + (02:02:35, 2 January 2025)
- ML19318A403 + (02:02:37, 2 January 2025)
- 05000368/LER-1980-037, Forwards LER 80-037/01T-0 + (02:02:38, 2 January 2025)
- 05000327/LER-1980-071-03, /03L-0:on 800517,rupture Disc on Boric Acid Evaporator Found Ruptured,Providing Path for Contents of Waste Gas Decay Tank to Escape Into Room.Cause Unknown.Event Not Immediately Discovered Due to No Radioactivity in Tanks + (02:02:40, 2 January 2025)
- 05000366/LER-1980-081-03, /03L-0:on 800521,w/reactor Near Rated Power,Loca Signal Accidentally Initiated Resulting in Reactor Scram. Outboard MSIV Failed to Auto Close.Caused by Faulty O-ring in Valve Air Operating Solenoid + (02:02:42, 2 January 2025)
- 05000366/LER-1980-053-03, During Normal Operation, Notification Received from Comsip,Inc of Design Defect on Primary Containment hydrogen-oxygen Analyzers.Caused by Absence of Design to Prevent Deadheading + (02:02:43, 2 January 2025)
- ML19318A397 + (02:02:44, 2 January 2025)
- 05000366/LER-1980-081, Forwards LER 80-081/03L-0 + (02:02:45, 2 January 2025)
- 05000366/LER-1980-053, Forwards Updated LER 80-053/03X-2 + (02:02:47, 2 January 2025)
- 05000327/LER-1980-071, Forwards LER 80-071/03L-0 + (02:02:49, 2 January 2025)
- 05000366/LER-1980-085-03, /03L-0:on 800521,w/reactor in Hot Shutdown,Rhr Svc Water Pumps 2E11-C001B & D Started to Put Torus Cooling in Svc.Caused by Bad Seal in Air Release Valve,Allowing Vent on Discharge Line.Valve Reassembled + (02:02:51, 2 January 2025)
- 05000366/LER-1980-085, Forwards LER 80-085/03L-0 + (02:02:52, 2 January 2025)
- 05000263/LER-1980-021, Forwards LER 80-021/03L-0 + (02:02:54, 2 January 2025)
- ML19318A386 + (02:02:55, 2 January 2025)
- ML19318A385 + (02:02:56, 2 January 2025)
- A01043, Responds to Open Items Noted in NRC Re Requirements for Auxiliary Feedwater Sys.Each Feedwater Train Will Have Two Operators Verifying Proper Valve Alignment.New Level Instrumentation Sys Installed by 810101 + (02:02:57, 2 January 2025)
- ML19318A382 + (02:03:02, 2 January 2025)
- ML19318A381 + (02:03:03, 2 January 2025)
- ML19318A380 + (02:03:04, 2 January 2025)
- AECM-80-131, Outlines Recent Organizational Changes.Title of Director of Power Production Changed to Assistant Vice President,Nuclear Production.Production Engineering Section Renamed Nuclear Plant Engineering Section.Notification Per QA Manual + (02:03:05, 2 January 2025)
- ML19318A378 + (02:03:07, 2 January 2025)
- ML19318A375 + (02:03:08, 2 January 2025)
- ML19318A377 + (02:03:08, 2 January 2025)
- ML19318A374 + (02:03:10, 2 January 2025)
- ML19318A373 + (02:03:11, 2 January 2025)
- ML19318A372 + (02:03:12, 2 January 2025)
- ML19318A369 + (02:03:15, 2 January 2025)
- 05000368/LER-1980-030, Forwards LER 80-030/03L-0 + (02:03:16, 2 January 2025)
- ML19318A366 + (02:03:17, 2 January 2025)
- ML19318A365 + (02:03:18, 2 January 2025)
- ML19318A364 + (02:03:20, 2 January 2025)
- ML19318A363 + (02:03:21, 2 January 2025)
- ML19318A361 + (02:03:23, 2 January 2025)
- ML19318A360 + (02:03:24, 2 January 2025)
- ML19318A359 + (02:03:35, 2 January 2025)
- ML19318A358 + (02:03:36, 2 January 2025)
- ML19318A357 + (02:03:38, 2 January 2025)
- ML19318A355 + (02:03:41, 2 January 2025)
- ML19318A353 + (02:03:42, 2 January 2025)
- ML19318A352 + (02:03:43, 2 January 2025)
- ML19318A351 + (02:03:43, 2 January 2025)
- ML19318A349 + (02:03:45, 2 January 2025)
- ML19318A345 + (02:03:46, 2 January 2025)
- ML19318A346 + (02:03:46, 2 January 2025)
- ML19318A344 + (02:03:48, 2 January 2025)
- ML19318A342 + (02:03:49, 2 January 2025)
- 05000302/LER-1980-023-03, /03L-0:on 800517,radioactive Matl in Form of Bagged Contaminated Waste & Poly Wrapped Scrap Lumber Was Taken to Site Dump.Caused by Apparent Communication Problem Between Health Physics Personnel & Bldg Servicemen + (02:03:50, 2 January 2025)
- B10015, Forwards Large Break Loca/Eccs Performance Results. Analysis Showed double-ended Cold Leg Guillotine Break at Pump Discharge to Be Limiting Large Break.Review of Results Determined That Applicable Fee Was Submitted 800509 + (02:03:51, 2 January 2025)
- 05000302/LER-1980-023, Forwards LER 80-023/03L-0 + (02:03:53, 2 January 2025)