Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20244B835 + (09:17:58, 2 December 2024)
- ML20244B834 + (09:17:59, 2 December 2024)
- ML20244B833 + (09:17:59, 2 December 2024)
- PNO-I-89-042, on 890601,instrumentation & Control Technician Shirt Contaminated w/Cl-36 While Handling Discarded Radiation Protector.Caused by Leaking Check Source.Skin Dose Estimate for Affected Individual Surveyed + (09:18:00, 2 December 2024)
- 05000277/LER-1989-010-01, :on 890514,50% Control Rod Density Exceeded W/O Demonstrating Operability of Rod Sequence Control Sys.Caused by Personnel Error.Shift Manager Counseled & Control Rod Pull Sheet Revised + (09:18:02, 2 December 2024)
- ML20244B826 + (09:18:05, 2 December 2024)
- ML20244B824 + (09:18:06, 2 December 2024)
- ML20244B822 + (09:18:06, 2 December 2024)
- ML20244B819 + (09:18:07, 2 December 2024)
- ML20244B821 + (09:18:07, 2 December 2024)
- ML20244B818 + (09:18:08, 2 December 2024)
- ML20244B815 + (09:18:09, 2 December 2024)
- ML20244B817 + (09:18:09, 2 December 2024)
- ML20244B812 + (09:18:10, 2 December 2024)
- ML20244B810 + (09:18:11, 2 December 2024)
- ML20244B808 + (09:18:11, 2 December 2024)
- ML20244B806 + (09:18:12, 2 December 2024)
- ML20244B803 + (09:18:13, 2 December 2024)
- ML20244B804 + (09:18:13, 2 December 2024)
- 3F0689-03, Forwards Revised Response to Insp Rept 50-302/87-17. Corrective Action:Mispositioned Valve Correctly Positioned as Required by Operating Procedure + (09:18:14, 2 December 2024)
- ML20244B802 + (09:18:14, 2 December 2024)
- ML20244B799 + (09:18:15, 2 December 2024)
- 05000414/LER-1989-008-01, :on 890509,hourly Fire Watches Not Performed Where Required on Inoperable Mechanical Penetration Area. Caused by Inappropriate Action.Penetration Resealed & Use of Approved Procedures Emphasized to Personnel + (09:18:17, 2 December 2024)
- ELV-00599, Forwards Implementation Rept on Reactor Vessel Level Instrumentation Sys,Per NUREG-0737,Item II.F.2 & Sser 1 + (09:18:18, 2 December 2024)
- ML20244B796 + (09:18:18, 2 December 2024)
- ML20244B792 + (09:18:19, 2 December 2024)
- ELV-00594, Provides Addl Info Re Proposed Changes to QA Program,Per NRC Request.Program of Audits Required by Tech Specs & FSAR Not Being Changed by Reduction in Personnel + (09:18:20, 2 December 2024)
- ML20244B791 + (09:18:20, 2 December 2024)
- ML20244B787 + (09:18:23, 2 December 2024)
- ML20244B785 + (09:18:23, 2 December 2024)
- ML20244B782 + (09:18:24, 2 December 2024)
- ML20244B777 + (09:18:25, 2 December 2024)
- ML20244B771 + (09:18:26, 2 December 2024)
- ML20244B772 + (09:18:26, 2 December 2024)
- 05000313/LER-1989-006-01, :on 890209,analytical & Procedural Inadequacies Noted Re Use of Hpis in Piggyback Flowpath Alignment.Caused by Deficient ECCS Analysis.Affected Portions of Piggyback Piping Reanalyzed & Mods Implemented + (09:18:28, 2 December 2024)
- ST-HL-AE-3042, Forwards Description of Change in Plant Initial Test Program Listed in FSAR Section 14.2 + (09:18:29, 2 December 2024)
- ML20244B766 + (09:18:30, 2 December 2024)
- ML20244B765 + (09:18:30, 2 December 2024)
- ML20244B763 + (09:18:31, 2 December 2024)
- ML20244B764 + (09:18:31, 2 December 2024)
- 05000425/LER-1989-020, :on 890512,loss of Power to Nuclear Instrumentation Channel N44 Occurred During Surveillance Test,Causing Reactor Trip.Cause for Loss of Power Could Not Be Determined.Ler Will Be Required Reading + (09:18:33, 2 December 2024)
- ML20244B759 + (09:18:34, 2 December 2024)
- ML20244B761 + (09:18:34, 2 December 2024)
- ML20244B756 + (09:18:36, 2 December 2024)
- RBG-31029, Gulf States Utils 1988 Annual Rept + (09:18:36, 2 December 2024)
- ML20244B755 + (09:18:37, 2 December 2024)
- ML20244B753 + (09:18:38, 2 December 2024)
- ML20244B751 + (09:18:38, 2 December 2024)
- IR 05000317/1989013 + (09:18:40, 2 December 2024)
- ML20244B748 + (09:18:40, 2 December 2024)
- ML20244B746 + (09:18:41, 2 December 2024)
- 3F0689-06, Responds to Violations Noted in Insp Rept 50-302/89-08. Corrective Actions:Setpoints for Radiation Monitor Release Reset to Proper Values & Surveillance Conducted to Determine Generic Conditions Contributing to Setpoint Errors + (09:18:42, 2 December 2024)